期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Determination of Time for Conducting Preventive Maintenance Using Hybrid Analysis
1
作者 Joseph Mathew 《International Journal of Plant Engineering and Management》 2004年第3期145-149,共5页
It becomes a common practice to determi ne time for conducting preventive maintenance (PM) using a hazard function and an alarm limit on a specified failure rate. In this paper, the authors argue that u sing both ha... It becomes a common practice to determi ne time for conducting preventive maintenance (PM) using a hazard function and an alarm limit on a specified failure rate. In this paper, the authors argue that u sing both hazard and reliability functions can improve the accuracy of the resul t, especially when the whole-life characteristic failure is modelled using diff erent failure distributions. The PM time predicted based on the hazard function should be checked against reliability. 展开更多
关键词 HAZARD reliability prediction preventive mainte nance
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部