期刊文献+
共找到148,254篇文章
< 1 2 250 >
每页显示 20 50 100
Contractor-Related Factors and Performance of Bridge Construction Projects Implemented by Kenya National Highways Authority (KeNHA) Kenya
1
作者 Joan Anyika Otike Charles Kabubo Victoria Okumu 《Open Journal of Civil Engineering》 2024年第2期214-224,共11页
The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This stu... The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects. 展开更多
关键词 Staff Factors Management Factors Performance Bridge projects KeNHA
下载PDF
Multi-Criteria Wildfire Risk Hazard Assessment in GIS Environment: Projection for the Future and Impact on RES Projects Installation Planning
2
作者 Aggelos Pallikarakis Flora Konstantopoulou 《Journal of Geoscience and Environment Protection》 2024年第5期242-265,共24页
It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is M... It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is Mediterranean, due to the unique combination of its type of vegetation and demanding climatic conditions. This research is focused on the Region of Epirus in Greece, an area with significant natural vegetation and a range of geomorphological aspects. In order to estimate the Wildfire Risk Hazard, several factors have been used: geomorphological (slope, aspect, elevation, TWI, Hydrographic network), social (Settlements and landfils, roads, overhead lines and substations), environmental (land cover) and climatic (Fire Weather Index). Through a multi-criteria decision analysis (MCDA) and an analytic hierarchy process (AHP) in a GIS environment, the Wildfire Risk Hazard has been estimated not only for current conditions but also for future projections for the near future (2031-2060) and the far future (2071-2100). The selected case study includes the potential impact of the Wildfires to the installed (or targeted to be installed) RES projects in the studied region. 展开更多
关键词 RES projects Greece Epirus Analytic Hierarchy Process Multi-Criteria Decision Analysis
下载PDF
A Review on Determinants Affecting Commercialization of Academic Institution Final Year Projects
3
作者 Xin Lan Zaheril Bin Zainudin 《Journal of Sustainable Business and Economics》 2024年第2期44-61,共18页
Final year project is an important training and assessment component incorporated in many courses of academic institution.The ability to translate ideas,research,and creativity into actual products,services,or busines... Final year project is an important training and assessment component incorporated in many courses of academic institution.The ability to translate ideas,research,and creativity into actual products,services,or businesses shows how successful and impactful people or institutions can be in the wider economy.However,in most of the cases,the outcomes of the final year project usually remain as academic discussion without maximizing their potential to be converted into a commercialized product or services.In this review,theory and applications are discussed to understand how entrepreneurial skills and networking abilities,components of individuals’human capital can impact the commercialisation of final year projects.Furthermore,determinants affecting commercialization of final year projects will also be explored namely:entrepreneurial skills,networking ability,access to resources,institutional support as well as creativity and innovation. 展开更多
关键词 COMMERCIALIZATION Final Year projects ENTREPRENEURSHIP Institution Support Network Resources
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
4
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Trust beyond Technology Algorithms: A Theoretical Exploration of Consumer Trust and Behavior in Technological Consumption and AI Projects
5
作者 David Oyekunle Ugochukwu Okwudili Matthew +1 位作者 David Preston David Boohene 《Journal of Computer and Communications》 2024年第6期72-102,共31页
In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing custome... In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing customer trust in AI systems through a mixed-methods approach, blending quantitative analysis with qualitative insights to create a comprehensive conceptual framework. Quantitatively, the study analyzes responses from 1248 participants using structural equation modeling (SEM), exploring interactions between technological factors like perceived usefulness and transparency, psychological factors including perceived risk and domain expertise, and organizational factors such as leadership support and ethical accountability. The results confirm the model, showing significant impacts of these factors on consumer trust and AI adoption attitudes. Qualitatively, the study includes 35 semi-structured interviews and five case studies, providing deeper insight into the dynamics shaping trust. Key themes identified include the necessity of explainability, domain competence, corporate culture, and stakeholder engagement in fostering trust. The qualitative findings complement the quantitative data, highlighting the complex interplay between technology capabilities, human perceptions, and organizational practices in establishing trust in AI. By integrating these findings, the study proposes a novel conceptual model that elucidates how various elements collectively influence consumer trust in AI. This model not only advances theoretical understanding but also offers practical implications for businesses and policymakers. The research contributes to the discourse on trust creation and decision-making in technology, emphasizing the need for interdisciplinary efforts to address societal challenges associated with technological advancements. It lays the groundwork for future research, including longitudinal, cross-cultural, and industry-specific studies, to further explore consumer trust in AI. 展开更多
关键词 Consumer Trust AI-Driven projects TRANSPARENCY Ethical Accountability Structural Equation Modeling (SEM) Technology Acceptance Model (TAM) Interdisciplinary Study Organizational Factors Psychological Factors Behavioral Intention
下载PDF
Research on Intelligent Cost Estimation of Engineering Foundation Projects Based on CSIs Theory
6
作者 Jie Di Wenhao Xing +2 位作者 Meng Wu Dan Zhang Jiashuo Zhao 《Journal of World Architecture》 2024年第5期29-35,共7页
Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensio... Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases. 展开更多
关键词 project management Cost Significant Items(CSIs) Engineering costing Intelligent estimation
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
7
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation Installation engineering Engineering projects Safety management
下载PDF
Impact of estuarine reclamation projects on saltwater intrusion and freshwater resource 被引量:1
8
作者 Hanghang LU Jianrong ZHU +3 位作者 Qing CHEN Ming LI Shunqi PAN Shenliang CHEN 《Journal of Oceanology and Limnology》 SCIE CAS CSCD 2023年第1期38-56,共19页
Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been impleme... Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been implemented in the Changjiang River estuary in recent years:the Xincun Shoal reclamation project(RP-XCS),the Qingcao Shoal reclamation project(RP-QCS),the Eastern Hengsha Shoal reclamation project(RP-EHS),and the Nanhui Shoal reclamation project(RP-NHS).The effects of the four reclamation projects and each project on the saltwater intrusion and water resources in the Changjiang River estuary were simulated in a 3D numerical model.Results show that for a multichannel estuary,local reclamation projects change the local topography and water diversion ratio(WDR)between channels and influence water and salt transport and freshwater utilization in the estuary.During spring tide,under the cumulative effect of the four reclamation projects,the salinity decreases by approximately 0.5in the upper reaches of the North Branch and increases by 0.5-1.0 in the middle and lower reaches of the North Branch.In the North Channel,the salinity decreases by approximately 0.5.In the North Passage,the salinity increases by 0.5-1.0.In the South Passage,the salinity increases by approximately 0.5 in the upper reaches and decreases by 0.2-0.5 on the north side of the middle and lower reaches.During neap tide,the cumulative effects of the four reclamation projects and the individual projects are similar to those during spring tide,but there are some differences.The effects of an individual reclamation project on WDR and saltwater intrusion during spring and neap tides are simulated and analyzed in detail.The cumulative effect of the four reclamation projects favors freshwater usage in the Changjiang River estuary. 展开更多
关键词 reclamation projects saltwater intrusion freshwater resources numerical model Changjiang River estuary
下载PDF
Future changes in precipitation and water availability over the Tibetan Plateau projected by CMIP6 models constrained by climate sensitivity 被引量:1
9
作者 Hui Qiu Tianjun Zhou +3 位作者 Liwei Zou Jie Jiang Xiaolong Chen Shuai Hu 《Atmospheric and Oceanic Science Letters》 CSCD 2024年第5期40-46,共7页
Precipitation projections over the Tibetan Plateau(TP)show diversity among existing studies,partly due to model uncertainty.How to develop a reliable projection remains inconclusive.Here,based on the IPCC AR6–assesse... Precipitation projections over the Tibetan Plateau(TP)show diversity among existing studies,partly due to model uncertainty.How to develop a reliable projection remains inconclusive.Here,based on the IPCC AR6–assessed likely range of equilibrium climate sensitivity(ECS)and the climatological precipitation performance,the authors constrain the CMIP6(phase 6 of the Coupled Model Intercomparison Project)model projection of summer precipitation and water availability over the TP.The best estimates of precipitation changes are 0.24,0.25,and 0.45 mm d^(−1)(5.9%,6.1%,and 11.2%)under the Shared Socioeconomic Pathway(SSP)scenarios of SSP1–2.6,SSP2–4.5,and SSP5–8.5 from 2050–2099 relative to 1965–2014,respectively.The corresponding constrained projections of water availability measured by precipitation minus evaporation(P–E)are 0.10,0.09,and 0.22 mm d^(−1)(5.7%,4.9%,and 13.2%),respectively.The increase of precipitation and P–E projected by the high-ECS models,whose ECS values are higher than the upper limit of the likely range,are about 1.7 times larger than those estimated by constrained projections.Spatially,there is a larger increase in precipitation and P–E over the eastern TP,while the western part shows a relatively weak difference in precipitation and a drier trend in P–E.The wetter TP projected by the high-ECS models resulted from both an approximately 1.2–1.4 times stronger hydrological sensitivity and additional warming of 0.6℃–1.2℃ under all three scenarios during 2050–2099.This study emphasizes that selecting climate models with climate sensitivity within the likely range is crucial to reducing the uncertainty in the projection of TP precipitation and water availability changes. 展开更多
关键词 Tibetan plateau Climate sensitivity Precipitation projection Water availability projection
下载PDF
Projecting Spring Consecutive Rainfall Events in the Three Gorges Reservoir Based on Triple-Nested Dynamical Downscaling 被引量:2
10
作者 Yanxin ZHENG Shuanglin LI +2 位作者 Noel KEENLYSIDE Shengping HE Lingling SUO 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2024年第8期1539-1558,共20页
Spring consecutive rainfall events(CREs) are key triggers of geological hazards in the Three Gorges Reservoir area(TGR), China. However, previous projections of CREs based on the direct outputs of global climate model... Spring consecutive rainfall events(CREs) are key triggers of geological hazards in the Three Gorges Reservoir area(TGR), China. However, previous projections of CREs based on the direct outputs of global climate models(GCMs) are subject to considerable uncertainties, largely caused by their coarse resolution. This study applies a triple-nested WRF(Weather Research and Forecasting) model dynamical downscaling, driven by a GCM, MIROC6(Model for Interdisciplinary Research on Climate, version 6), to improve the historical simulation and reduce the uncertainties in the future projection of CREs in the TGR. Results indicate that WRF has better performances in reproducing the observed rainfall in terms of the daily probability distribution, monthly evolution and duration of rainfall events, demonstrating the ability of WRF in simulating CREs. Thus, the triple-nested WRF is applied to project the future changes of CREs under the middle-of-the-road and fossil-fueled development scenarios. It is indicated that light and moderate rainfall and the duration of continuous rainfall spells will decrease in the TGR, leading to a decrease in the frequency of CREs. Meanwhile, the duration, rainfall amount, and intensity of CREs is projected to regional increase in the central-west TGR. These results are inconsistent with the raw projection of MIROC6. Observational diagnosis implies that CREs are mainly contributed by the vertical moisture advection. Such a synoptic contribution is captured well by WRF, which is not the case in MIROC6,indicating larger uncertainties in the CREs projected by MIROC6. 展开更多
关键词 triple-nested downscaling Three Gorges Reservoir area consecutive rainfall events geological hazards projectION
下载PDF
HSPM:A Better Model to Effectively Preventing Open-Source Projects from Dying
11
作者 Zhifang Liao Fangying Fu +3 位作者 Yiqi Zhao Sui Tan Zhiwu Yu Yan Zhang 《Computer Systems Science & Engineering》 SCIE EI 2023年第10期431-452,共22页
With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS pr... With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS project network,namely an Open-Source Software ECOsystem(OSSECO).Unfortunately,not all OS projects in the open-source ecosystem can be healthy and stable in the long term,and more projects will go from active to inactive and gradually die.In a tightly connected ecosystem,the death of one project can potentially cause the collapse of the entire ecosystem network.How can we effectively prevent such situations from happening?In this paper,we first identify the basic project characteristics that affect the survival of OS projects at both project and ecosystem levels through the proportional hazards model.Then,we utilize graph convolutional networks based on the ecosystem network to extract the ecosystem environment characteristics of OS projects.Finally,we fuse basic project characteristics and environmental project characteristics and construct a Hybrid Structured Prediction Model(HSPM)to predict the OS project survival state.The experimental results show that HSPM significantly improved compared to the traditional prediction model.Our work can substantially assist OS project managers in maintaining their projects’health.It can also provide an essential reference for developers when choosing the right open-source project for their production activities. 展开更多
关键词 project survival prediction open-source ecosystem open-source project open-source health graph neural networks
下载PDF
人工智能背景下Materials Project数据库在计算材料学课程教学中的应用
12
作者 胡学敏 孙孪鸿 +1 位作者 陈晓玉 叶原丰 《科教文汇》 2024年第10期90-94,共5页
该文探讨了在人工智能背景下,Materials Project数据库在计算材料学课程教学中的应用和影响。Materials Project数据库是一个集成了AI和大数据技术的开放获取的材料库,能为学生提供海量的材料晶体结构和物性数据,使教学内容更为丰富,让... 该文探讨了在人工智能背景下,Materials Project数据库在计算材料学课程教学中的应用和影响。Materials Project数据库是一个集成了AI和大数据技术的开放获取的材料库,能为学生提供海量的材料晶体结构和物性数据,使教学内容更为丰富,让学生能通过亲自操作获取和分析数据,深入理解微观结构与物性之间的关系。这一新兴的教学模式不仅提升了学生的科研能力和创新思维能力,还有助于培养具备计算材料专业知识和多学科交叉的复合型人才。总体来说,人工智能时代下,大数据的引入为计算材料学课程带来新的活力,并对未来教育改革和实践产生了积极影响。 展开更多
关键词 人工智能 Materials project数据库 计算材料学教学
下载PDF
Transcriptional regulation in the development and dysfunction of neocortical projection neurons 被引量:1
13
作者 Ningxin Wang Rong Wan Ke Tang 《Neural Regeneration Research》 SCIE CAS CSCD 2024年第2期246-254,共9页
Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord... Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord.Appropriate development of cortical projection neurons is regulated by certain essential events such as neural fate determination,proliferation,specification,differentiation,migration,survival,axonogenesis,and synaptogenesis.These processes are precisely regulated in a tempo-spatial manner by intrinsic factors,extrinsic signals,and neural activities.The generation of correct subtypes and precise connections of projection neurons is imperative not only to support the basic cortical functions(such as sensory information integration,motor coordination,and cognition)but also to prevent the onset and progression of neurodevelopmental disorders(such as intellectual disability,autism spectrum disorders,anxiety,and depression).This review mainly focuses on the recent progress of transcriptional regulations on the development and diversity of neocortical projection neurons and the clinical relevance of the failure of transcriptional modulations. 展开更多
关键词 autism spectrum disorders COGNITION DIFFERENTIATION excitatory circuits intellectual disability NEOCORTEX neurodevelopmental disorders projection neuron specification transcriptional regulation
下载PDF
Cascading multi-segment rupture process of the 2023 Turkish earthquake doublet on a complex fault system revealed by teleseismic P wave back projection method 被引量:1
14
作者 Bonan Cao Zengxi Ge 《Earthquake Science》 2024年第2期158-173,共16页
In this study,the vertical components of broadband teleseismic P wave data recorded by China Earthquake Network are used to image the rupture processes of the February 6th,2023 Turkish earthquake doublet via back proj... In this study,the vertical components of broadband teleseismic P wave data recorded by China Earthquake Network are used to image the rupture processes of the February 6th,2023 Turkish earthquake doublet via back projection analysis.Data in two frequency bands(0.5-2 Hz and 1-3 Hz)are used in the imaging processes.The results show that the rupture of the first event extends about 200 km to the northeast and about 150 km to the southwest,lasting~90 s in total.The southwestern rupture is triggered by the northeastern rupture,demonstrating a sequential bidirectional unilateral rupture pattern.The rupture of the second event extends approximately 80 km in both northeast and west directions,lasting~35 s in total and demonstrates a typical bilateral rupture feature.The cascading ruptures on both sides also reflect the occurrence of selective rupture behaviors on bifurcated faults.In addition,we observe super-shear ruptures on certain fault sections with relatively straight fault structures and sparse aftershocks. 展开更多
关键词 2023 Turkish earthquake doublet back projection method cascading segmented rupture process coseismic triggering super-shear ruptures
下载PDF
Developing Projects with Low-code Combined with ChatGPT
15
作者 Wei Xiong Bing Li +1 位作者 Zhao Wu Bo Hang 《计算机教育》 2023年第12期204-213,共10页
This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time... This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time by increasing modeling time.However,as code tools become more advanced,it is challenging to improve efficiency because models are abstract while implementations are concrete.This paper proposes a novel approach that integrates ChatGPT as a plug-in into the whole R&D process and combines it with our code generation tool to enhance R&D efficiency.We have developed some demos to demonstrate the effectiveness of our approach.According to our evaluation,our approach can save more than 90%of the work in implementing the code generation tool,leaving only about 10%of the work for code review,code improvement,and unit testing. 展开更多
关键词 ChatGPT Low-code Code generation Software engineering project development
下载PDF
Correlations between the Global Earth Healing and Global Consciousness Projects—Brain-Mind-Matter-Interactions through Physical Noise Generators
16
作者 Marcus Schmieke 《Natural Science》 2023年第5期191-198,共8页
Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in ... Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in order to infuse positive affirmations into the global consciousness. As mentioned in the original study design, it was intended to use the GCP as a reference for the effectiveness of its activities. The data of the GEHP consisting of 21 events from 2013 to 2020 is analyzed and statistically compared to the data of the GCP. An astonishing synchronicity was observed, which suggests an interaction between the brain states of the observers and the physical noise generators of the GCP. 展开更多
关键词 Global Consciousness project Global Consciousness Information Field Coherence PEAR Lab Quantum Entanglement Decline Effect
下载PDF
Perception-Based Assessment of the Factors Causing Delays in Construction Projects
17
作者 Om Prakash Giri 《Engineering(科研)》 2023年第7期431-445,共15页
Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders... Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders. To address this problem, this study aimed to identify and analyze the significant factors that contribute to construction project delays in Nepal. To gather data, a well-structured questionnaire was developed and administered to a sample of 100 participants, including contractors, consultants, and civil engineers. Various statistical tests were conducted to ensure the data’s integrity and consistency, such as reliability assessments and factor analyses. The findings of the study highlighted multiple factors contributing to delays in construction projects such as inadequate design, poor communication, and coordination among stakeholders, insufficient experience and planning by contractors, delays in material delivery and testing, labor-related problems including shortages and low qualifications, and external factors like regulatory changes and unforeseen circumstances. By identifying these major causes of construction project delays, this study presented insightful information that can contribute to the analysis and evaluation of project performance. 展开更多
关键词 Construction projects Construction Industry Delay Causes Construction De-lays project Performance
下载PDF
Application of Anti-seepage Technology in the Construction of Hydraulic Engineering Projects
18
作者 Huanlin YANG 《Meteorological and Environmental Research》 CAS 2023年第5期31-32,35,共3页
With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construc... With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed. 展开更多
关键词 Anti-seepage technology Hydraulic engineering projects Application strategy
下载PDF
Recent Ventures in Interdisciplinary Arctic Research:The ARCPATH Project 被引量:1
19
作者 Astrid E.J.OGILVIE Leslie A.KING +9 位作者 Noel KEENLYSIDE François COUNILLON Brynhildur DAVIÐSDÓTTIR Níels EINARSSON Sergey GULEV Ke FAN Torben KOENIGK James R.MCGOODWIN Marianne H.RASMUSSON Shuting YANG 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2024年第8期1559-1568,共10页
This paper celebrates Professor Yongqi GAO's significant achievement in the field of interdisciplinary studies within the context of his final research project Arctic Climate Predictions: Pathways to Resilient Sus... This paper celebrates Professor Yongqi GAO's significant achievement in the field of interdisciplinary studies within the context of his final research project Arctic Climate Predictions: Pathways to Resilient Sustainable Societies-ARCPATH(https://www.svs.is/en/projects/finished-projects/arcpath). The disciplines represented in the project are related to climatology, anthropology, marine biology, economics, and the broad spectrum of social-ecological studies. Team members were drawn from the Nordic countries, Russia, China, the United States, and Canada. The project was transdisciplinary as well as interdisciplinary as it included collaboration with local knowledge holders. ARCPATH made significant contributions to Arctic research through an improved understanding of the mechanisms that drive climate variability in the Arctic. In tandem with this research, a combination of historical investigations and social, economic, and marine biological fieldwork was carried out for the project study areas of Iceland, Greenland, Norway, and the surrounding seas, with a focus on the joint use of ocean and sea-ice data as well as social-ecological drivers. ARCPATH was able to provide an improved framework for predicting the near-term variation of Arctic climate on spatial scales relevant to society, as well as evaluating possible related changes in socioeconomic realms. In summary, through the integration of information from several different disciplines and research approaches, ARCPATH served to create new and valuable knowledge on crucial issues, thus providing new pathways to action for Arctic communities. 展开更多
关键词 Recent Ventures in Interdisciplinary Arctic Research:The ARCPATH project
下载PDF
Diagnosis of indirectly driven double shell targets with point-projection hard x-ray radiography
20
作者 Chao Tian Minghai Yu +17 位作者 Lianqiang Shan Fengjuan Wu Bi Bi Qiangqiang Zhang Yuchi Wu Tiankui Zhang Feng Zhang Dongxiao Liu Weiwu Wang Zongqiang Yuan Siqian Yang Lei Yang Zhigang Deng Jian Teng Weimin Zhou Zongqing Zhao Yuqiu Gu Baohan Zhang 《Matter and Radiation at Extremes》 SCIE EI CSCD 2024年第2期50-62,共13页
We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on t... We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on the upgraded SG-II laser facility. Then, based on thepoint-projection hard x-ray radiography technique, time-resolved radiography of the double shell targets, including that of their near-peakcompression, were obtained. The backlighter source was created by the interactions of a high-intensity short pulsed laser with a metalmicrowire target. Images of the target near peak compression were obtained with an Au microwire. In addition, radiation hydrodynamicsimulations were performed, and the target evolution obtained agrees well with the experimental results. Using the radiographic images, arealdensities of the targets were evaluated. 展开更多
关键词 double projectION POINT
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部