期刊文献+
共找到8,907篇文章
< 1 2 250 >
每页显示 20 50 100
Construction Safety Management of Mechanical and Electrical Installation Projects
1
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 construction safety Mechanical and electrical installation Installation engineering Engineering projects Safety management
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
2
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Evaluating the Impact of Workshop Management on the Progress of Road Construction Projects(Case Study:Road Construction Projects of Tehran Province)
3
作者 Morteza Modarresi Fatemeh Mousavi 《Journal of Management Science & Engineering Research》 2023年第1期49-59,共11页
Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to... Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important. 展开更多
关键词 construction projects Workshop management SNOWBALL Road construction
下载PDF
The Importance of Construction Project Archives Management and Ways to Strengthen it
4
作者 Meicong Tao 《Journal of Architectural Research and Development》 2023年第6期43-48,共6页
China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives ar... China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives are important information for construction projects.The quality of archives management can have a great impact on the quality and economic benefits of construction projects.For this reason,it is necessary to increase the emphasis on archives management of construction projects and take effective management measures.This article introduces the concept of construction project archives,highlights the significance of effective management in construction project archives,and examines prevalent issues along with practical measures to enhance construction project archives management,with the goal of offering valuable insights for archive managers. 展开更多
关键词 construction projects Archives management Strengthening measures
下载PDF
Key Points and Difficulties in the Management of a New Guangzhou 12th People’s Hospital Branch
5
作者 Liya Fang 《Journal of World Architecture》 2024年第3期63-71,共9页
During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures... During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures for construction projects,and the COVID-19 outbreak changed the requirements of hospital construction.In addition to focusing more on spatial planning and layout,the integration of specialized departments,large-scale medical equipment,and numerous intelligent systems increased the complexity of hospital construction projects.The success of these projects often hinges on the quality of the management team.If a hospital construction project manager lacks experience and an understanding of the project’s key aspects,they may struggle with organization,management,and problem-solving,leading to rework,resource waste,and delays.This paper uses the construction of a new Guangzhou 12th People’s Hospital branch as an example to describe the key points and difficulties in each stage of project construction and proposes solutions for the management of similar projects in the future. 展开更多
关键词 Hospital construction project project management management essentials
下载PDF
基于Microsoft Project的建筑施工项目管理分析
6
作者 杨盛华 《中国厨卫》 2024年第7期82-84,共3页
在当前社会经济快速发展的情况下,建设工程数量不断增加,而传统的手工记录方式已经无法满足现代建设工程的需求。因此,采用先进的计算机技术来辅助建筑施工项目管理已成为当今建筑业发展的趋势。Microsoft Project作为一种专业的项目管... 在当前社会经济快速发展的情况下,建设工程数量不断增加,而传统的手工记录方式已经无法满足现代建设工程的需求。因此,采用先进的计算机技术来辅助建筑施工项目管理已成为当今建筑业发展的趋势。Microsoft Project作为一种专业的项目管理软件,具有良好的数据存储和可视化展示功能,可以有效地提高建筑施工项目的质量和效率。文章分析了如何利用Microsoft Project软件进行建筑施工项目管理,并对该方法的应用效果进行评估,以期为今后的建筑施工项目管理提供参考价值。 展开更多
关键词 Microsoft project 建筑施工 项目管理
下载PDF
Analysis on Classified Storage and Traceability of Construction Project Archives
7
作者 Jiali Dai 《Journal of Architectural Research and Development》 2023年第3期51-57,共7页
With the development and progress of economic construction and market economy,urban construction is also developing rapidly.In the field of construction engineering,a large number of construction engineering files are... With the development and progress of economic construction and market economy,urban construction is also developing rapidly.In the field of construction engineering,a large number of construction engineering files are constantly being produced and accumulated.Therefore,the role of file management is becoming more and more important.The archives are the true records of the whole process of project construction,including the information on the whole process from project design to completion,and are also the main basis for operation management after project delivery.However,there are many aspects to construction project archives,and there are many problems.Nowadays,the classification and preservation of archives are receiving more and more attention.In this article,the origin and development history of construction project archives is first expounded,and its attributes and importance are analyzed.Secondly,the differences between ancient and modern archives management are compared,and at the same time suggestions on improving the archives’traceability system,strengthening the use of archives,and establishing and improving archives management are given.In this paper,we summarize the problems in archives sorting and put forward specific solutions to improve the standardization and systematic management of archives work and enhance the authenticity and integrity of construction project archives. 展开更多
关键词 construction project archives Archives management Classification and storage TRACEABILITY
下载PDF
Control and Management of Construction Project Cost 被引量:1
8
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 construction project construction stage project cost Control and management
下载PDF
The construction management system and practice of Three Gorges Project 被引量:1
9
作者 Cao Guangjing 《Engineering Sciences》 EI 2011年第3期31-36,共6页
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio... Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward. 展开更多
关键词 Three Gorges project(TGP) construction management water resources and hvdropower project
下载PDF
Comparison of project management approaches in construction
10
作者 李百毅 郑敏 +2 位作者 李百战 AUSTIN S THORPE T 《Journal of Central South University》 SCIE EI CAS 2009年第S1期100-104,共5页
The construction industry is acutely aware of the need to improve its management process. Currently,construction management is facing four major schools of thoughts. This paper reports the recent study results,the aim... The construction industry is acutely aware of the need to improve its management process. Currently,construction management is facing four major schools of thoughts. This paper reports the recent study results,the aim of which was to compare these approaches. The focus will be on the questions:What is the theory root for this school of thoughts? What is the position of planning? What are the techniques used or recommended by each of these schools of thoughts in managing construction projects? Recommendations are then given through a deep discussion of the capability of each approach in managing today's highly complex construction project. 展开更多
关键词 construction project management APPROACHES
下载PDF
Application Research of Blended Teaching based on Duifene Teaching Platform:Modules on Construction Project Management 被引量:1
11
作者 Jingjing Sun 《Journal of Contemporary Educational Research》 2021年第5期20-24,共5页
The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as ... The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences. 展开更多
关键词 Duifene teaching platform construction project management Blended teaching
下载PDF
Application of Three-Dimensional Visualization Technology in Project Management of Offshore Platform Engineering Construction
12
作者 Jianyuan Yang Songlin Xia +2 位作者 Jie Shang Shaofang Li Zhongde Zhang 《Engineering(科研)》 2019年第11期727-734,共8页
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter... Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects. 展开更多
关键词 THREE-DIMENSIONAL VISUALIZATION VIRTUAL REALITY ENGINEERING construction project management
下载PDF
Study of Quality Management in Construction Projects
13
作者 Tan Chin-Keng Abdul-Rahman, Hamzah 《Chinese Business Review》 2011年第7期542-552,共11页
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi... This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia. 展开更多
关键词 quality management construction project management PRACTICES management commitment PROBLEMS
下载PDF
On the Application of IPRA Tool in Risk Assessment and Management of International Construction Projects
14
作者 Shadab Alipour Tadeh Zirakian David Boyajian 《Journal of Civil Engineering and Architecture》 2017年第2期135-140,共6页
Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of const... Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of construction companies running projects in international markets depends on how the risks arise from the host country conditions as well as the project specific risk factors. Successful management of risks requires identification of risks, construction of a risk model which can be used to assess the magnitude of risks, and implementation of response strategies so that an acceptable risk-return balance can be achieved. The project success usually depends on the combination of all risks, response strategies used to mitigate risks, and a company's ability to manage them. There exists a need to develop risk models containing the risks of doing business in international markets and factors that affect manageability of these risks. One of the market's critical challenges is scheduled management and the understanding and application of program management. This paper uses systematic risk identification, classification and analysis, and measurement and response methodologies to help international contractors quantify the risks of project development and accomplishment. 展开更多
关键词 International construction projects IPRA tool fuzzy risk assessment risk identification risk management.
下载PDF
The Impact of State Policies on Investment Project Management in Polish Industrial Construction Sector
15
作者 Janusz Sobieraj Dominik Metelski 《Journal of Modern Accounting and Auditing》 2021年第1期14-40,共27页
In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on ... In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state. 展开更多
关键词 corporate performance investment project management industrial construction exploratory factor analysis
下载PDF
Application of BIM in Architectural Design,Project Construction,and Project Management
16
作者 Yujie Li 《Journal of World Architecture》 2022年第3期1-6,共6页
The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced tech... The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering. 展开更多
关键词 BIM Architectural design project construction project management
下载PDF
Analysis on Reformation of Digital Management Education of Prefabricated Construction Project Under the Background of Intelligent Construction
17
作者 Juan You 《Journal of Architectural Research and Development》 2022年第5期8-13,共6页
Prefabricated building is an important building development mode at present.It can improve the development speed and production efficiency of the construction industry,reduce the labor intensity of construction,play a... Prefabricated building is an important building development mode at present.It can improve the development speed and production efficiency of the construction industry,reduce the labor intensity of construction,play an important role in the development as well as the modernization of the construction industry.Due to the late development of prefabricated buildings,the talent training of prefabricated buildings lags behind,causing the development of prefabricated buildings to not achieve its required target.Therefore,the characteristics of intelligent construction need to be incorporated,the education of prefabricated buildings needs to be reformed,the education regarding digital management of prefabricated buildings should be improved,and more professional talents should be nurtured. 展开更多
关键词 Intelligent construction Prefabricated building projects Digital management courses Reformation of education
下载PDF
The Impact of Project Portfolio Management on Enterprise Strategic Objectives
18
作者 Qiting Song 《Proceedings of Business and Economic Studies》 2022年第5期164-168,共5页
In today’s era,with the increase in the number of enterprise innovations,enterprises must adopt project portfolio management for various innovations,select alternative projects from the perspective of enterprise stra... In today’s era,with the increase in the number of enterprise innovations,enterprises must adopt project portfolio management for various innovations,select alternative projects from the perspective of enterprise strategy.This paper primarily explores the use of project portfolio management in enterprise project management,hoping to improve the quality of enterprise project management and the utilization efficiency of project portfolio management in enterprise project management. 展开更多
关键词 project portfolio management Enterprise strategic objectives Development strategy
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
19
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion project
下载PDF
Risk Assessment at the Design Phase of Construction Projects in Ghana
20
作者 Maurice Azochiman Awuni 《Journal of Building Construction and Planning Research》 2019年第2期39-58,共20页
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou... The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies. 展开更多
关键词 construction INDUSTRY project RISK management Assessment DESIGN PHASE
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部