According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
目的:探讨加速康复外科(enhanced recovery after surgery,ERAS)理念下围手术期精细化营养管理模式在剖宫产患者中的实践效果。方法:选择2019年6月-2020年6月自贡市第一人民医院收治的400例剖宫产患者,根据时间顺序,2019年6-12月采用传...目的:探讨加速康复外科(enhanced recovery after surgery,ERAS)理念下围手术期精细化营养管理模式在剖宫产患者中的实践效果。方法:选择2019年6月-2020年6月自贡市第一人民医院收治的400例剖宫产患者,根据时间顺序,2019年6-12月采用传统营养管理模式的200例产妇作为对照组,2020年1-6月采取ERAS理念下围手术期精细化营养管理模式的200例产妇作为试验组,观察两组围手术期口渴及饥饿情况、术后肠道功能恢复情况,项目组成员出院前对围手术期营养管理方案进行满意度调查。结果:试验组进入手术室时轻、中度口渴及术后首次自主进食前轻度饥饿发生率均低于对照组(P<0.05),但两组重度口渴及中重度饥饿发生率比较,差异均无统计学意义(P>0.05);试验组术后12 h内肠鸣音恢复、术后24 h内肛门首次排气、术后48 h内首次排便例数均多于对照组(P<0.05);试验组总满意度为100%,高于对照组的79.0%(P<0.05)。结论:剖宫产患者给予ERAS理念下围手术期精细化营养管理模式,可以加快围手术期胃肠道功能恢复,减少围手术期不适,提高患者满意度,促进患者早日康复。展开更多
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,