Consider a pseudo-differential operator T_(a)f(x)=∫_(R^(n))e^(ix,ζ)a(x,ζ)f(ζ)dζwhere the symbol a is in the rough Hormander class L^(∞)S_(ρ)^(m)with m∈R andρ∈[0,1].In this note,when 1≤p≤2,if n(ρ-1)/p and ...Consider a pseudo-differential operator T_(a)f(x)=∫_(R^(n))e^(ix,ζ)a(x,ζ)f(ζ)dζwhere the symbol a is in the rough Hormander class L^(∞)S_(ρ)^(m)with m∈R andρ∈[0,1].In this note,when 1≤p≤2,if n(ρ-1)/p and a∈L^(∞)S_(ρ)^(m),then for any f∈S(R^(n))and x∈R^(n),we prove that M(T_(a)f)(x)≤C(M(|f|^(p))(x))^(1/p) where M is the Hardy-Littlewood maximal operator.Our theorem improves the known results and the bound on m is sharp,in the sense that n(ρ-1)/p can not be replaced by a larger constant.展开更多
In recent decades, tokamak discharges with zero total toroidal current have been reported in tokamak experiments, and this is one of the key problems in alternating current(AC) operations.An efficient free-boundary eq...In recent decades, tokamak discharges with zero total toroidal current have been reported in tokamak experiments, and this is one of the key problems in alternating current(AC) operations.An efficient free-boundary equilibrium code is developed to investigate such advanced tokamak discharges with current reversal equilibrium configuration. The calculation results show that the reversal current equilibrium can maintain finite pressure and also has considerable effects on the position of the X-point and the magnetic separatrix shape, and hence also on the position of the strike point on the divertor plates, which is extremely useful for magnetic design, MHD stability analysis, and experimental data analysis etc. for the AC plasma current operation on tokamaks.展开更多
East Japan Railway Company(JR East)is aiming to“realize driverless train operation”as one of the key measures to respond to rapid changes in the business environment.Currently,Automatic Train Operation(ATO)equipment...East Japan Railway Company(JR East)is aiming to“realize driverless train operation”as one of the key measures to respond to rapid changes in the business environment.Currently,Automatic Train Operation(ATO)equipment is not installed on the Shinkansen,but there are plans to introduce ATO or driverless operation in the near future.From 2018-2021,the Ministry of Land,Infrastructure,Transport and Tourism(MLIT)held the“ATO Technology Study Group for Railways”in which the concept of technical requirements necessary for driverless operation was discussed.In 2021,JR East conducted the GOA4 demonstration test on the Joetsu Shinkansen.In this test,we were able to confirm the basic functions of Shinkansen vehicles such as automatic departure control,speed control,fixed position stop control,and remote stop control using ATO.We aim to realize unattended operation(GOA4)for deadhead trains between Niigata Station and the Niigata Shinkansen Rolling Stock Center by the end of the 2020 s,and driverless operation(GOA3)for passenger trains of the Joetsu Shinkansen by the mid-2030s and continue to develop the necessary technologies and build systems.展开更多
A high-performance LED-side-pumped two-rod Nd,Ce:YAG laser with continuous-wave(CW) and acousto–optical(A-O) Q-switched operation is demonstrated in this work. A symmetrically shaped flat–flat cavity with two identi...A high-performance LED-side-pumped two-rod Nd,Ce:YAG laser with continuous-wave(CW) and acousto–optical(A-O) Q-switched operation is demonstrated in this work. A symmetrically shaped flat–flat cavity with two identical LEDside-pumped laser modules is employed for power scalability. In the CW regime, the maximum output average power of laser at 1064 nm is 4.41 W, corresponding to a maximum optical conversion efficiency of 5.3% and a slope efficiency is 12.4%. In the active Q-switched regime, the pulse energy of laser reaches as high as 0.89 m J at a repetition rate of 800 Hz with a pulse width of 457.2 ns, the corresponding highest peak output power is 1.94 k W and the M~2 factor is measured to be about 8.8. To the best of the authors' knowledge, this is the first demonstration and the highest performance of a CW LED-side-pumped two-rod laser Nd,Ce:YAG with Watt-level output reported so far.展开更多
In recent years,motor drive systems have garnered increasing attention due to their high efficiency and superior control performance.This is especially apparent in aerospace,marine propulsion,and electric vehicles,whe...In recent years,motor drive systems have garnered increasing attention due to their high efficiency and superior control performance.This is especially apparent in aerospace,marine propulsion,and electric vehicles,where high performance,efficiency,and reliability are crucial.The ability of the drive system to maintain long-term fault-tolerant control(FTC)operation after a failure is essential.The likelihood of inverter failures surpasses that of other components in the drive system,highlighting its critical importance.Long-term FTC operation ensures the system retains its fundamental functions until safe repairs or replacements can be made.The focus of developing a FTC strategy has shifted from basic FTC operations to enhancing the post-fault quality to accommodate the realities of prolonged operation post-failure.This paper primarily investigates FTC strategies for inverter failures in various motor drive systems over the past decade.These strategies are categorized into three types based on post-fault operational quality:rescue,remedy,and reestablishment.The paper discusses each typical control strategy and its research focus,the strengths and weaknesses of various algorithms,and recent advancements in FTC.Finally,this review summarizes effective FTC techniques for inverter failures in motor drive systems and suggests directions for future research.展开更多
Background: In Nigeria, adolescents and young people (AYP) aged 10 - 24, comprise 22.3% of the population and with HIV prevalence of 3.5%. The AYP living with HIV enrolled at the 68 NARHY, Lagos reflects the national ...Background: In Nigeria, adolescents and young people (AYP) aged 10 - 24, comprise 22.3% of the population and with HIV prevalence of 3.5%. The AYP living with HIV enrolled at the 68 NARHY, Lagos reflects the national challenges with poor viral suppression. The OTZ program aligns with the UNAIDS 95-95-95 goals. It seeks to empower AYPLHIV to be in charge of their treatment and commit to triple zero outcomeszero missed appointments, zero missed drugs, and zero viral loads. The purpose of the study was to assess the impact of the OTZ program on viral load suppression among members of the adolescent club in 68 NARHY, Lagos. Method: A cross-sectional retrospective study to evaluate the impact of the OTZ program on the viral load of 53 AYP enrolled in the OTZ program between March 2019 to December 2019 was analyzed. The Percentage of viral load suppression before enrollment compared with 6 and 12 months after enrollment into the OTZ program. The AYP is grouped into 10 - 14, 15 - 19, and 20 - 24 years. Activities conducted were peer driven monthly meetings with the AYP during which the adolescents interacted on issues relating to improving their treatment outcomes, healthcare workers reviewed their clinical status, viral load result, provider peer counseling, and caregivers engagement to support adherence to medication and ARV refills. Results: Before OTZ, 81% aged 10 - 14 years, 75% aged 15 - 19 years, and 25% aged 20 - 24 years were virally suppressed (VL less than 1000 copies/ml). Six months after enrollment, 94% were virally suppressed95% aged 10 - 14 years, 96% aged 15 - 19 years, and 66% aged 20-24 years. Twelve months after enrollment, 96% of AYP were virally suppressed100% aged 10-14 years, 93% aged 15 - 19 years, and 100% aged 20 - 24 years. Males viral load (VL) suppression improved from 79% to 96% and 92%, while females VL suppression improved from 69% to 93% and 100% at 6 and 12 months respectively. Conclusion: The OTZ activities contributed to improved viral load suppression in the AYP of the facility.展开更多
The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the...The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the high cost and long duration of operational tests,it is essential to plan the test in advance.To solve the problem of planning UAV swarm operational test,this study considers the multi-stage feature of a UAV swarm mission,composed of launch,flight and combat stages,and proposes a method to find test plans that can maximize mission reliability.Therefore,a multi-stage mission reliability model for a UAV swarm is proposed to ensure successful implementation of the mission.A multi-objective integer optimization method that considers both mission reliability and cost is then formulated to obtain the optimal test plans.This study first constructs a mission reliability model for the UAV swarm in the combat stage.Then,the launch stage and flight stage are integrated to develop a complete PMS(Phased Mission Systems)reliability model.Finally,the Binary Decision Diagrams(BDD)and Multi Objective Quantum Particle Swarm Optimization(MOQPSO)methods are proposed to solve the model.The optimal plans considering both reliability and cost are obtained.The proposed model supports the planning of UAV swarm operational tests and represents a meaningful exploration of UAV swarm test planning.展开更多
To guide the illuminating design to improve the on-state performances of gallium arsenide(GaAs)photoconductive semiconductor switch(PCSS),the effect of spot size on the operation mode of GaAsPCSS based on a semi-insul...To guide the illuminating design to improve the on-state performances of gallium arsenide(GaAs)photoconductive semiconductor switch(PCSS),the effect of spot size on the operation mode of GaAsPCSS based on a semi-insulating wafer with a thickness of 1 mm,triggered by a 1064-nm extrinsic laser beam with the rectangular spot,has been investigated experimentally.It is found that the variation of the spot size in length and width can act on the different parts of the output waveform integrating the characteristics of the linear and nonlinear modes,and then significantly boosts the PCSS toward different operation modes.On this basis,a two-channel model containing the active and passive parts is introduced to interpret the relevant influencing mechanisms.Results indicate that the increased spot length can peak the amplitude of static domains in the active part to enhance the development of the nonlinear switching,while the extended spot width can change the distribution of photogenerated carriers on both parts to facilitate the linear switching and weaken the nonlinear switching,which have been proved by comparing the domain evolutions under different spot sizes.展开更多
Wind-photovoltaic(PV)-hydrogen-storage multi-agent energy systems are expected to play an important role in promoting renewable power utilization and decarbonization.In this study,a coordinated operation method was pr...Wind-photovoltaic(PV)-hydrogen-storage multi-agent energy systems are expected to play an important role in promoting renewable power utilization and decarbonization.In this study,a coordinated operation method was proposed for a wind-PVhydrogen-storage multi-agent energy system.First,a coordinated operation model was formulated for each agent considering peer-to-peer power trading.Second,a coordinated operation interactive framework for a multi-agent energy system was proposed based on the theory of the alternating direction method of multipliers.Third,a distributed interactive algorithm was proposed to protect the privacy of each agent and solve coordinated operation strategies.Finally,the effectiveness of the proposed coordinated operation method was tested on multi-agent energy systems with different structures,and the operational revenues of the wind power,PV,hydrogen,and energy storage agents of the proposed coordinated operation model were improved by approximately 59.19%,233.28%,16.75%,and 145.56%,respectively,compared with the independent operation model.展开更多
Perovskite solar cells(PSCs)have made great advances in terms of power conversion efficiency(PCE),yet their subpar stability continues to hinder their commercialization.The interface between the perovskite layer and t...Perovskite solar cells(PSCs)have made great advances in terms of power conversion efficiency(PCE),yet their subpar stability continues to hinder their commercialization.The interface between the perovskite layer and the charge-carrier transporting layers plays a crucial role in undermining the stability of PSCs.In this work,we propose a strategy to stabilize high-performance PSCs with PCE over 23%by introducing a cesium-doped graphene oxide(GO-Cs)as an interlayer between the perovskite and hole-transporting material.The GO-Cs treated PSCs exhibit excellent operational stability with a projected T80(the time where the device PCE reduces to 80%of its initial value)of 2143 h of operation at the maximum powering point under one sun illumination.展开更多
Accurate and efficient online parameter identification and state estimation are crucial for leveraging digital twin simulations to optimize the operation of near-carbon-free nuclear energy systems.In previous studies,...Accurate and efficient online parameter identification and state estimation are crucial for leveraging digital twin simulations to optimize the operation of near-carbon-free nuclear energy systems.In previous studies,we developed a reactor operation digital twin(RODT).However,non-differentiabilities and discontinuities arise when employing machine learning-based surrogate forward models,challenging traditional gradient-based inverse methods and their variants.This study investigated deterministic and metaheuristic algorithms and developed hybrid algorithms to address these issues.An efficient modular RODT software framework that incorporates these methods into its post-evaluation module is presented for comprehensive comparison.The methods were rigorously assessed based on convergence profiles,stability with respect to noise,and computational performance.The numerical results show that the hybrid KNNLHS algorithm excels in real-time online applications,balancing accuracy and efficiency with a prediction error rate of only 1%and processing times of less than 0.1 s.Contrastingly,algorithms such as FSA,DE,and ADE,although slightly slower(approximately 1 s),demonstrated higher accuracy with a 0.3%relative L_2 error,which advances RODT methodologies to harness machine learning and system modeling for improved reactor monitoring,systematic diagnosis of off-normal events,and lifetime management strategies.The developed modular software and novel optimization methods presented offer pathways to realize the full potential of RODT for transforming energy engineering practices.展开更多
As a flexible resource,energy storage plays an increasingly significant role in stabilizing and supporting the power system,while providing auxiliary services.Still,the current high demand for energy storage contrasts...As a flexible resource,energy storage plays an increasingly significant role in stabilizing and supporting the power system,while providing auxiliary services.Still,the current high demand for energy storage contrasts with the fuzzy lack of market-oriented mechanisms for energy storage,the principle of market-oriented operation has not been embodied,and there is no unified and systematic analytical framework for the business model.However,the dispatch management model of energy storage in actual power system operation is not clear.Still,the specific scheduling process and energy storage strategy on the source-load-network side could be more specific,and there needs to be a greater understanding of the collaborative scheduling process of the multilevel scheduling center.On this basis,this paper reviews the energy storage operation model and market-based incentive mechanism,For different functional types and installation locations of energy storage within the power system,the operational models and existing policies for energy storage participation in the market that are adapted to multiple operating states are summarized.From the point of view of the actual scheduling and operation management of energy storage in China,an energy storage regulation and operation management model based on“national,provincial,and local”multilevel coordination is proposed,as well as key technologies in the interactive scenarios of source-load,network and storage.展开更多
BACKGROUND The TRIANGLE operation involves the removal of all tissues within the triangle bounded by the portal vein-superior mesenteric vein,celiac axis-common hepatic artery,and superior mesenteric artery to improve...BACKGROUND The TRIANGLE operation involves the removal of all tissues within the triangle bounded by the portal vein-superior mesenteric vein,celiac axis-common hepatic artery,and superior mesenteric artery to improve patient prognosis.Although previously promising in patients with locally advanced pancreatic ductal adenocarcinoma(PDAC),data are limited regarding the long-term oncological outcomes of the TRIANGLE operation among resectable PDAC patients undergoing pancreaticoduodenectomy(PD).AIM To evaluate the safety of the TRIANGLE operation during PD and the prognosis in patients with resectable PDAC.METHODS This retrospective cohort study included patients who underwent PD for pancreatic head cancer between January 2017 and April 2023,with or without the TRIANGLE operation.Patients were divided into the PD_(TRIANGLE)and PD_(non-TRIANGLE)groups.Surgical and survival outcomes were compared between the two groups.Adequate adjuvant chemotherapy was defined as adjuvant chemotherapy≥6 months.RESULTS The PD_(TRIANGLE)and PD_(non-TRIANGLE) groups included 52 and 55 patients,respectively.There were no significant differences in the baseline characteristics or perioperative indexes between the two groups.Furthermore,the recurrence rate was lower in the PD_(TRIANGLE) group than in the PD_(non-TRIANGLE) group(48.1%vs 81.8%,P<0.001),and the local recurrence rate of PDAC decreased from 37.8%to 16.0%.Multivariate Cox regression analysis revealed that PD_(TRIANGLE)(HR=0.424;95%CI:0.256-0.702;P=0.001),adequate adjuvant chemotherapy≥6 months(HR=0.370;95%CI:0.222-0.618;P<0.001)and margin status(HR=2.255;95%CI:1.252-4.064;P=0.007)were found to be independent factors for the recurrence rate.CONCLUSION The TRIANGLE operation is safe for PDAC patients undergoing PD.Moreover,it reduces the local recurrence rate of PDAC and may improve survival in patients who receive adequate adjuvant chemotherapy.展开更多
As the Chinese government proposes ambitious plans to promote low-carbon transition,energy storage will play a pivotal role in China’s future power system.However,due to the lack of a mature electricity market enviro...As the Chinese government proposes ambitious plans to promote low-carbon transition,energy storage will play a pivotal role in China’s future power system.However,due to the lack of a mature electricity market environment and corresponding mechanisms,current energy storage in China faces problems such as unclear operational models,insufficient cost recovery mechanisms,and a single investment entity,making it difficult to support the rapid development of the energy storage industry.In contrast,European and American countries have already embarked on certain practices in energy storage operation models.Through exploration of key issues such as investment entities,market participation forms,and cost recovery channels in both front and back markets,a wealth of mature experiences has been accumulated.Therefore,this paper first summarizes the existing practices of energy storage operation models in North America,Europe,and Australia’s electricity markets separately from front and back markets,finding that perfect market mechanisms and reasonable subsidy policies are among the main drivers for promoting the rapid development of energy storage markets.Subsequently,combined with the actual development of China’s electricity market,it explores three key issues affecting the construction of costsharing mechanisms for energy storage under market conditions:Market participation forms,investment and operation modes,and cost recovery mechanisms.Finally,in line with the development expectations of China’s future electricitymarket,suggestions are proposed fromfour aspects:Market environment construction,electricity price formation mechanism,cost sharing path,and policy subsidy mechanism,to promote the healthy and rapid development of China’s energy storage industry.展开更多
1 Introduction.With the continuous growth of the global population,the energy demand continues to increase.However,due to the dominance of fossil fuels in global energy and fossil fuels are non-renewable,it has led to...1 Introduction.With the continuous growth of the global population,the energy demand continues to increase.However,due to the dominance of fossil fuels in global energy and fossil fuels are non-renewable,it has led to the global energy crisis[1].Besides,the use of fossil fuels will generate a mass of air pollutants(e.g.,carbon dioxide,sulfur dioxide,etc.),which will cause serious environmental pollution,climate change[2],etc.To resolve the aforementioned issues,countries around the world have implemented a variety of measures hoping to fundamentally adjust the global energy structure and achieve sustainable development.Thereinto,“Paris Agreement”reached in 2015 under the framework of“United Nations Framework Convention on Climate Change”aims to control the increase in the average temperature of the globe to within 2°C below preindustrial levels,and thereafter to peak global greenhouse gas emissions as soon as possible,continuously decreasing thereafter[3].United Kingdom plans to reduce the average exhaust emissions of“new cars”to approximately 50–70 g/km by 20230,which is roughly half of what it is now[4].In addition,China proposed a plan at“United Nations General Assembly”in 2020 to peak carbon dioxide emissions by 2030 and strive to achieve carbon neutrality by 2060.It is a fact that the whole world is committed to changing the current energy structure,protecting the Earth’s ecology,and achieving global sustainable development[5].展开更多
Concentrate copper grade(CCG)is one of the important production indicators of copper flotation processes,and keeping the CCG at the set value is of great significance to the economic benefit of copper flotation indust...Concentrate copper grade(CCG)is one of the important production indicators of copper flotation processes,and keeping the CCG at the set value is of great significance to the economic benefit of copper flotation industrial processes.This paper addresses the fluctuation problem of CCG through an operational optimization method.Firstly,a density-based affinity propagationalgorithm is proposed so that more ideal working condition categories can be obtained for the complex raw ore properties.Next,a Bayesian network(BN)is applied to explore the relationship between the operational variables and the CCG.Based on the analysis results of BN,a weighted Gaussian process regression model is constructed to predict the CCG that a higher prediction accuracy can be obtained.To ensure the predicted CCG is close to the set value with a smaller magnitude of the operation adjustments and a smaller uncertainty of the prediction results,an index-oriented adaptive differential evolution(IOADE)algorithm is proposed,and the convergence performance of IOADE is superior to the traditional differential evolution and adaptive differential evolution methods.Finally,the effectiveness and feasibility of the proposed methods are verified by the experiments on a copper flotation industrial process.展开更多
Based on the current situation of the operation and maintenance management of the pilot base in many chemical parks in China,this paper conducts an in-depth exploration of the operation and maintenance management and ...Based on the current situation of the operation and maintenance management of the pilot base in many chemical parks in China,this paper conducts an in-depth exploration of the operation and maintenance management and innovation mode of the pilot base from the aspects of the evaluation of the pilot project entering the park,safety and environmental protection supervision,pilot mode,and industrialization mode of the pilot test results,so as to provide solutions for accelerating the process and industrialization of the pilot project and realizing the innovation value of the pilot base.展开更多
Recently,PT Huadian Bukit Asam Power (HBAP) was awarded the"Zero Accident Award"by the Ministry of Manpower of the Republic of Indonesia.This national-level award for safe production in Indonesia serves to t...Recently,PT Huadian Bukit Asam Power (HBAP) was awarded the"Zero Accident Award"by the Ministry of Manpower of the Republic of Indonesia.This national-level award for safe production in Indonesia serves to testify to the enterprise's achievements in safe and stable operations from June 1,2018,to December 31,2023.展开更多
We consider a first order periodic system in R^(N),involving a time dependent maximal monotone operator which need not have a full domain and a multivalued perturbation.We prove the existence theorems for both the con...We consider a first order periodic system in R^(N),involving a time dependent maximal monotone operator which need not have a full domain and a multivalued perturbation.We prove the existence theorems for both the convex and nonconvex problems.We also show the existence of extremal periodic solutions and provide a strong relaxation theorem.Finally,we provide an application to nonlinear periodic control systems.展开更多
Due to the impact of source-load prediction power errors and uncertainties,the actual operation of the park will have a wide range of fluctuations compared with the expected state,resulting in its inability to achieve...Due to the impact of source-load prediction power errors and uncertainties,the actual operation of the park will have a wide range of fluctuations compared with the expected state,resulting in its inability to achieve the expected economy.This paper constructs an operating simulation model of the park power grid operation considering demand response and proposes a multi-time scale operating simulation method that combines day-ahead optimization and model predictive control(MPC).In the day-ahead stage,an operating simulation plan that comprehensively considers the user’s side comfort and operating costs is proposed with a long-term time scale of 15 min.In order to cope with power fluctuations of photovoltaic,wind turbine and conventional load,MPC is used to track and roll correct the day-ahead operating simulation plan in the intra-day stage to meet the actual operating operation status of the park.Finally,the validity and economy of the operating simulation strategy are verified through the analysis of arithmetic examples.展开更多
基金Supported by the National Natural Science Foundation of China(11871436,12071437)。
文摘Consider a pseudo-differential operator T_(a)f(x)=∫_(R^(n))e^(ix,ζ)a(x,ζ)f(ζ)dζwhere the symbol a is in the rough Hormander class L^(∞)S_(ρ)^(m)with m∈R andρ∈[0,1].In this note,when 1≤p≤2,if n(ρ-1)/p and a∈L^(∞)S_(ρ)^(m),then for any f∈S(R^(n))and x∈R^(n),we prove that M(T_(a)f)(x)≤C(M(|f|^(p))(x))^(1/p) where M is the Hardy-Littlewood maximal operator.Our theorem improves the known results and the bound on m is sharp,in the sense that n(ρ-1)/p can not be replaced by a larger constant.
基金supported by National Natural Science Foundation of China (No. 12075276)partly by the Comprehensive Research Facility for Fusion Technology Program of China (No. 2018000052-73-01-001228)。
文摘In recent decades, tokamak discharges with zero total toroidal current have been reported in tokamak experiments, and this is one of the key problems in alternating current(AC) operations.An efficient free-boundary equilibrium code is developed to investigate such advanced tokamak discharges with current reversal equilibrium configuration. The calculation results show that the reversal current equilibrium can maintain finite pressure and also has considerable effects on the position of the X-point and the magnetic separatrix shape, and hence also on the position of the strike point on the divertor plates, which is extremely useful for magnetic design, MHD stability analysis, and experimental data analysis etc. for the AC plasma current operation on tokamaks.
文摘East Japan Railway Company(JR East)is aiming to“realize driverless train operation”as one of the key measures to respond to rapid changes in the business environment.Currently,Automatic Train Operation(ATO)equipment is not installed on the Shinkansen,but there are plans to introduce ATO or driverless operation in the near future.From 2018-2021,the Ministry of Land,Infrastructure,Transport and Tourism(MLIT)held the“ATO Technology Study Group for Railways”in which the concept of technical requirements necessary for driverless operation was discussed.In 2021,JR East conducted the GOA4 demonstration test on the Joetsu Shinkansen.In this test,we were able to confirm the basic functions of Shinkansen vehicles such as automatic departure control,speed control,fixed position stop control,and remote stop control using ATO.We aim to realize unattended operation(GOA4)for deadhead trains between Niigata Station and the Niigata Shinkansen Rolling Stock Center by the end of the 2020 s,and driverless operation(GOA3)for passenger trains of the Joetsu Shinkansen by the mid-2030s and continue to develop the necessary technologies and build systems.
基金Project supported by the Fund from Nanjing University of Posts and Telecommunications,China(Grant Nos.JUH219002 and JUH219007)the Key Research and Development Program of Shandong Province,China(Grant No.2021CXGC010202)。
文摘A high-performance LED-side-pumped two-rod Nd,Ce:YAG laser with continuous-wave(CW) and acousto–optical(A-O) Q-switched operation is demonstrated in this work. A symmetrically shaped flat–flat cavity with two identical LEDside-pumped laser modules is employed for power scalability. In the CW regime, the maximum output average power of laser at 1064 nm is 4.41 W, corresponding to a maximum optical conversion efficiency of 5.3% and a slope efficiency is 12.4%. In the active Q-switched regime, the pulse energy of laser reaches as high as 0.89 m J at a repetition rate of 800 Hz with a pulse width of 457.2 ns, the corresponding highest peak output power is 1.94 k W and the M~2 factor is measured to be about 8.8. To the best of the authors' knowledge, this is the first demonstration and the highest performance of a CW LED-side-pumped two-rod laser Nd,Ce:YAG with Watt-level output reported so far.
基金supported in part by the National Natural Science Foundation of China under Grants 52025073 and 52107047in part by China Scholarship Council。
文摘In recent years,motor drive systems have garnered increasing attention due to their high efficiency and superior control performance.This is especially apparent in aerospace,marine propulsion,and electric vehicles,where high performance,efficiency,and reliability are crucial.The ability of the drive system to maintain long-term fault-tolerant control(FTC)operation after a failure is essential.The likelihood of inverter failures surpasses that of other components in the drive system,highlighting its critical importance.Long-term FTC operation ensures the system retains its fundamental functions until safe repairs or replacements can be made.The focus of developing a FTC strategy has shifted from basic FTC operations to enhancing the post-fault quality to accommodate the realities of prolonged operation post-failure.This paper primarily investigates FTC strategies for inverter failures in various motor drive systems over the past decade.These strategies are categorized into three types based on post-fault operational quality:rescue,remedy,and reestablishment.The paper discusses each typical control strategy and its research focus,the strengths and weaknesses of various algorithms,and recent advancements in FTC.Finally,this review summarizes effective FTC techniques for inverter failures in motor drive systems and suggests directions for future research.
文摘Background: In Nigeria, adolescents and young people (AYP) aged 10 - 24, comprise 22.3% of the population and with HIV prevalence of 3.5%. The AYP living with HIV enrolled at the 68 NARHY, Lagos reflects the national challenges with poor viral suppression. The OTZ program aligns with the UNAIDS 95-95-95 goals. It seeks to empower AYPLHIV to be in charge of their treatment and commit to triple zero outcomeszero missed appointments, zero missed drugs, and zero viral loads. The purpose of the study was to assess the impact of the OTZ program on viral load suppression among members of the adolescent club in 68 NARHY, Lagos. Method: A cross-sectional retrospective study to evaluate the impact of the OTZ program on the viral load of 53 AYP enrolled in the OTZ program between March 2019 to December 2019 was analyzed. The Percentage of viral load suppression before enrollment compared with 6 and 12 months after enrollment into the OTZ program. The AYP is grouped into 10 - 14, 15 - 19, and 20 - 24 years. Activities conducted were peer driven monthly meetings with the AYP during which the adolescents interacted on issues relating to improving their treatment outcomes, healthcare workers reviewed their clinical status, viral load result, provider peer counseling, and caregivers engagement to support adherence to medication and ARV refills. Results: Before OTZ, 81% aged 10 - 14 years, 75% aged 15 - 19 years, and 25% aged 20 - 24 years were virally suppressed (VL less than 1000 copies/ml). Six months after enrollment, 94% were virally suppressed95% aged 10 - 14 years, 96% aged 15 - 19 years, and 66% aged 20-24 years. Twelve months after enrollment, 96% of AYP were virally suppressed100% aged 10-14 years, 93% aged 15 - 19 years, and 100% aged 20 - 24 years. Males viral load (VL) suppression improved from 79% to 96% and 92%, while females VL suppression improved from 69% to 93% and 100% at 6 and 12 months respectively. Conclusion: The OTZ activities contributed to improved viral load suppression in the AYP of the facility.
基金supported by the National Natural Science Foundation of China(with Granted Number 72271239,grant recipient P.J.)Research on the Design Method of Reliability Qualification Test for Complex Equipment Based on Multi-Source Information Fusion.https://www.nsfc.gov.cn/.
文摘The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the high cost and long duration of operational tests,it is essential to plan the test in advance.To solve the problem of planning UAV swarm operational test,this study considers the multi-stage feature of a UAV swarm mission,composed of launch,flight and combat stages,and proposes a method to find test plans that can maximize mission reliability.Therefore,a multi-stage mission reliability model for a UAV swarm is proposed to ensure successful implementation of the mission.A multi-objective integer optimization method that considers both mission reliability and cost is then formulated to obtain the optimal test plans.This study first constructs a mission reliability model for the UAV swarm in the combat stage.Then,the launch stage and flight stage are integrated to develop a complete PMS(Phased Mission Systems)reliability model.Finally,the Binary Decision Diagrams(BDD)and Multi Objective Quantum Particle Swarm Optimization(MOQPSO)methods are proposed to solve the model.The optimal plans considering both reliability and cost are obtained.The proposed model supports the planning of UAV swarm operational tests and represents a meaningful exploration of UAV swarm test planning.
基金supported in part by the Huxiang Youth Talent Support Program(No.2020RC3030)in part by the Foundation of State Key Laboratory of Pulsed Power Laser Technology(Nos.SKL2021ZR02 and SKL2021KF05)。
文摘To guide the illuminating design to improve the on-state performances of gallium arsenide(GaAs)photoconductive semiconductor switch(PCSS),the effect of spot size on the operation mode of GaAsPCSS based on a semi-insulating wafer with a thickness of 1 mm,triggered by a 1064-nm extrinsic laser beam with the rectangular spot,has been investigated experimentally.It is found that the variation of the spot size in length and width can act on the different parts of the output waveform integrating the characteristics of the linear and nonlinear modes,and then significantly boosts the PCSS toward different operation modes.On this basis,a two-channel model containing the active and passive parts is introduced to interpret the relevant influencing mechanisms.Results indicate that the increased spot length can peak the amplitude of static domains in the active part to enhance the development of the nonlinear switching,while the extended spot width can change the distribution of photogenerated carriers on both parts to facilitate the linear switching and weaken the nonlinear switching,which have been proved by comparing the domain evolutions under different spot sizes.
基金supported by the Key Research and Development Program of Jiangsu Provincial Department of Science and Technology(BE2020081).
文摘Wind-photovoltaic(PV)-hydrogen-storage multi-agent energy systems are expected to play an important role in promoting renewable power utilization and decarbonization.In this study,a coordinated operation method was proposed for a wind-PVhydrogen-storage multi-agent energy system.First,a coordinated operation model was formulated for each agent considering peer-to-peer power trading.Second,a coordinated operation interactive framework for a multi-agent energy system was proposed based on the theory of the alternating direction method of multipliers.Third,a distributed interactive algorithm was proposed to protect the privacy of each agent and solve coordinated operation strategies.Finally,the effectiveness of the proposed coordinated operation method was tested on multi-agent energy systems with different structures,and the operational revenues of the wind power,PV,hydrogen,and energy storage agents of the proposed coordinated operation model were improved by approximately 59.19%,233.28%,16.75%,and 145.56%,respectively,compared with the independent operation model.
基金King Abdulaziz City for Science and Technology (KACST) for the fellowshipfunding from the European Union’s Horizon 2020 research and innovation program GRAPHENE Flagship Core 3 under agreement No.: 881603+2 种基金funding from the European Union’s Horizon 2020 research and innovation program under the Marie Sk?odowska-Curie grant agreement No. 945363funding from the Shanghai Pujiang Program (22PJ1401200)the National Natural Science Foundation of China (No. 52302229)
文摘Perovskite solar cells(PSCs)have made great advances in terms of power conversion efficiency(PCE),yet their subpar stability continues to hinder their commercialization.The interface between the perovskite layer and the charge-carrier transporting layers plays a crucial role in undermining the stability of PSCs.In this work,we propose a strategy to stabilize high-performance PSCs with PCE over 23%by introducing a cesium-doped graphene oxide(GO-Cs)as an interlayer between the perovskite and hole-transporting material.The GO-Cs treated PSCs exhibit excellent operational stability with a projected T80(the time where the device PCE reduces to 80%of its initial value)of 2143 h of operation at the maximum powering point under one sun illumination.
基金supported by the Natural Science Foundation of Shanghai(No.23ZR1429300)Innovation Funds of CNNC(Lingchuang Fund,Contract No.CNNC-LCKY-202234)the Project of the Nuclear Power Technology Innovation Center of Science Technology and Industry(No.HDLCXZX-2023-HD-039-02)。
文摘Accurate and efficient online parameter identification and state estimation are crucial for leveraging digital twin simulations to optimize the operation of near-carbon-free nuclear energy systems.In previous studies,we developed a reactor operation digital twin(RODT).However,non-differentiabilities and discontinuities arise when employing machine learning-based surrogate forward models,challenging traditional gradient-based inverse methods and their variants.This study investigated deterministic and metaheuristic algorithms and developed hybrid algorithms to address these issues.An efficient modular RODT software framework that incorporates these methods into its post-evaluation module is presented for comprehensive comparison.The methods were rigorously assessed based on convergence profiles,stability with respect to noise,and computational performance.The numerical results show that the hybrid KNNLHS algorithm excels in real-time online applications,balancing accuracy and efficiency with a prediction error rate of only 1%and processing times of less than 0.1 s.Contrastingly,algorithms such as FSA,DE,and ADE,although slightly slower(approximately 1 s),demonstrated higher accuracy with a 0.3%relative L_2 error,which advances RODT methodologies to harness machine learning and system modeling for improved reactor monitoring,systematic diagnosis of off-normal events,and lifetime management strategies.The developed modular software and novel optimization methods presented offer pathways to realize the full potential of RODT for transforming energy engineering practices.
基金the North China Branch of State Grid Corporation of China,Contract No.SGNC0000BGWT2310175.
文摘As a flexible resource,energy storage plays an increasingly significant role in stabilizing and supporting the power system,while providing auxiliary services.Still,the current high demand for energy storage contrasts with the fuzzy lack of market-oriented mechanisms for energy storage,the principle of market-oriented operation has not been embodied,and there is no unified and systematic analytical framework for the business model.However,the dispatch management model of energy storage in actual power system operation is not clear.Still,the specific scheduling process and energy storage strategy on the source-load-network side could be more specific,and there needs to be a greater understanding of the collaborative scheduling process of the multilevel scheduling center.On this basis,this paper reviews the energy storage operation model and market-based incentive mechanism,For different functional types and installation locations of energy storage within the power system,the operational models and existing policies for energy storage participation in the market that are adapted to multiple operating states are summarized.From the point of view of the actual scheduling and operation management of energy storage in China,an energy storage regulation and operation management model based on“national,provincial,and local”multilevel coordination is proposed,as well as key technologies in the interactive scenarios of source-load,network and storage.
基金Supported by Shanghai Science and Technology Commission of Shanghai Municipality,No.20Y11908600Shanghai Municipal Health Commission,No.20194Y0195Medical Engineering Jiont Fund of Fudan University,No.XM03231533.
文摘BACKGROUND The TRIANGLE operation involves the removal of all tissues within the triangle bounded by the portal vein-superior mesenteric vein,celiac axis-common hepatic artery,and superior mesenteric artery to improve patient prognosis.Although previously promising in patients with locally advanced pancreatic ductal adenocarcinoma(PDAC),data are limited regarding the long-term oncological outcomes of the TRIANGLE operation among resectable PDAC patients undergoing pancreaticoduodenectomy(PD).AIM To evaluate the safety of the TRIANGLE operation during PD and the prognosis in patients with resectable PDAC.METHODS This retrospective cohort study included patients who underwent PD for pancreatic head cancer between January 2017 and April 2023,with or without the TRIANGLE operation.Patients were divided into the PD_(TRIANGLE)and PD_(non-TRIANGLE)groups.Surgical and survival outcomes were compared between the two groups.Adequate adjuvant chemotherapy was defined as adjuvant chemotherapy≥6 months.RESULTS The PD_(TRIANGLE)and PD_(non-TRIANGLE) groups included 52 and 55 patients,respectively.There were no significant differences in the baseline characteristics or perioperative indexes between the two groups.Furthermore,the recurrence rate was lower in the PD_(TRIANGLE) group than in the PD_(non-TRIANGLE) group(48.1%vs 81.8%,P<0.001),and the local recurrence rate of PDAC decreased from 37.8%to 16.0%.Multivariate Cox regression analysis revealed that PD_(TRIANGLE)(HR=0.424;95%CI:0.256-0.702;P=0.001),adequate adjuvant chemotherapy≥6 months(HR=0.370;95%CI:0.222-0.618;P<0.001)and margin status(HR=2.255;95%CI:1.252-4.064;P=0.007)were found to be independent factors for the recurrence rate.CONCLUSION The TRIANGLE operation is safe for PDAC patients undergoing PD.Moreover,it reduces the local recurrence rate of PDAC and may improve survival in patients who receive adequate adjuvant chemotherapy.
基金supported financially by State Grid Henan Electric Power Company Technology Project“Research on System Cost Impact Assessment and Sharing Mechanism under the Rapid Development of Distributed Photovoltaics”(Grant Number:5217L0220021).
文摘As the Chinese government proposes ambitious plans to promote low-carbon transition,energy storage will play a pivotal role in China’s future power system.However,due to the lack of a mature electricity market environment and corresponding mechanisms,current energy storage in China faces problems such as unclear operational models,insufficient cost recovery mechanisms,and a single investment entity,making it difficult to support the rapid development of the energy storage industry.In contrast,European and American countries have already embarked on certain practices in energy storage operation models.Through exploration of key issues such as investment entities,market participation forms,and cost recovery channels in both front and back markets,a wealth of mature experiences has been accumulated.Therefore,this paper first summarizes the existing practices of energy storage operation models in North America,Europe,and Australia’s electricity markets separately from front and back markets,finding that perfect market mechanisms and reasonable subsidy policies are among the main drivers for promoting the rapid development of energy storage markets.Subsequently,combined with the actual development of China’s electricity market,it explores three key issues affecting the construction of costsharing mechanisms for energy storage under market conditions:Market participation forms,investment and operation modes,and cost recovery mechanisms.Finally,in line with the development expectations of China’s future electricitymarket,suggestions are proposed fromfour aspects:Market environment construction,electricity price formation mechanism,cost sharing path,and policy subsidy mechanism,to promote the healthy and rapid development of China’s energy storage industry.
文摘1 Introduction.With the continuous growth of the global population,the energy demand continues to increase.However,due to the dominance of fossil fuels in global energy and fossil fuels are non-renewable,it has led to the global energy crisis[1].Besides,the use of fossil fuels will generate a mass of air pollutants(e.g.,carbon dioxide,sulfur dioxide,etc.),which will cause serious environmental pollution,climate change[2],etc.To resolve the aforementioned issues,countries around the world have implemented a variety of measures hoping to fundamentally adjust the global energy structure and achieve sustainable development.Thereinto,“Paris Agreement”reached in 2015 under the framework of“United Nations Framework Convention on Climate Change”aims to control the increase in the average temperature of the globe to within 2°C below preindustrial levels,and thereafter to peak global greenhouse gas emissions as soon as possible,continuously decreasing thereafter[3].United Kingdom plans to reduce the average exhaust emissions of“new cars”to approximately 50–70 g/km by 20230,which is roughly half of what it is now[4].In addition,China proposed a plan at“United Nations General Assembly”in 2020 to peak carbon dioxide emissions by 2030 and strive to achieve carbon neutrality by 2060.It is a fact that the whole world is committed to changing the current energy structure,protecting the Earth’s ecology,and achieving global sustainable development[5].
基金supported in part by the National Key Research and Development Program of China(2021YFC2902703)the National Natural Science Foundation of China(62173078,61773105,61533007,61873049,61873053,61703085,61374147)。
文摘Concentrate copper grade(CCG)is one of the important production indicators of copper flotation processes,and keeping the CCG at the set value is of great significance to the economic benefit of copper flotation industrial processes.This paper addresses the fluctuation problem of CCG through an operational optimization method.Firstly,a density-based affinity propagationalgorithm is proposed so that more ideal working condition categories can be obtained for the complex raw ore properties.Next,a Bayesian network(BN)is applied to explore the relationship between the operational variables and the CCG.Based on the analysis results of BN,a weighted Gaussian process regression model is constructed to predict the CCG that a higher prediction accuracy can be obtained.To ensure the predicted CCG is close to the set value with a smaller magnitude of the operation adjustments and a smaller uncertainty of the prediction results,an index-oriented adaptive differential evolution(IOADE)algorithm is proposed,and the convergence performance of IOADE is superior to the traditional differential evolution and adaptive differential evolution methods.Finally,the effectiveness and feasibility of the proposed methods are verified by the experiments on a copper flotation industrial process.
文摘Based on the current situation of the operation and maintenance management of the pilot base in many chemical parks in China,this paper conducts an in-depth exploration of the operation and maintenance management and innovation mode of the pilot base from the aspects of the evaluation of the pilot project entering the park,safety and environmental protection supervision,pilot mode,and industrialization mode of the pilot test results,so as to provide solutions for accelerating the process and industrialization of the pilot project and realizing the innovation value of the pilot base.
文摘Recently,PT Huadian Bukit Asam Power (HBAP) was awarded the"Zero Accident Award"by the Ministry of Manpower of the Republic of Indonesia.This national-level award for safe production in Indonesia serves to testify to the enterprise's achievements in safe and stable operations from June 1,2018,to December 31,2023.
基金supported by the NSFC(12071413)the Guangxi Natural Sci-ence Foundation(2023GXNSFAA026085)the European Union's Horizon 2020 Research and Innovation Programme under the Marie Sklodowska-Curie grant agreement No.823731 CONMECH。
文摘We consider a first order periodic system in R^(N),involving a time dependent maximal monotone operator which need not have a full domain and a multivalued perturbation.We prove the existence theorems for both the convex and nonconvex problems.We also show the existence of extremal periodic solutions and provide a strong relaxation theorem.Finally,we provide an application to nonlinear periodic control systems.
基金supported by the Science and Technology Project of State Grid Shanxi Electric Power Research Institute:Research on Data-Driven New Power System Operation Simulation and Multi Agent Control Strategy(52053022000F).
文摘Due to the impact of source-load prediction power errors and uncertainties,the actual operation of the park will have a wide range of fluctuations compared with the expected state,resulting in its inability to achieve the expected economy.This paper constructs an operating simulation model of the park power grid operation considering demand response and proposes a multi-time scale operating simulation method that combines day-ahead optimization and model predictive control(MPC).In the day-ahead stage,an operating simulation plan that comprehensively considers the user’s side comfort and operating costs is proposed with a long-term time scale of 15 min.In order to cope with power fluctuations of photovoltaic,wind turbine and conventional load,MPC is used to track and roll correct the day-ahead operating simulation plan in the intra-day stage to meet the actual operating operation status of the park.Finally,the validity and economy of the operating simulation strategy are verified through the analysis of arithmetic examples.