In this paper, 2-D computational analyses were conducted for unsteady high Reynolds number flows around a smooth circular cylinder in the supercritical and upper-transition flow regimes, i.e. 8.21×104〈Re〈1.54...In this paper, 2-D computational analyses were conducted for unsteady high Reynolds number flows around a smooth circular cylinder in the supercritical and upper-transition flow regimes, i.e. 8.21×104〈Re〈1.54×106. The calculations were performed by means of solving the 2-D Unsteady Reynolds-Averaged Navier-Stokes (URANS) equations with a k-ε turbulence model. The calculated results, produced flow structure drag and lift coefficients, as well as Strouhal numbers. The findings were in good agreement with previous published data, which also supplied us with a good understanding of the flow across cylinders of different high Reynolds numbers. Meanwhile, an effective measure was presented to control the lift force on a cylinder, which points the way to decrease the vortex induced vibration of marine structure in future.展开更多
Ground subsidence in a Chinese underground gold mine is remarkable. To find out reasons and regularities of the subsidence, following research work was carried out: (1) systemetical investigations of engineering geolo...Ground subsidence in a Chinese underground gold mine is remarkable. To find out reasons and regularities of the subsidence, following research work was carried out: (1) systemetical investigations of engineering geological conditions, including in situ stress sta- te, locstion and size of old river beds, ponds and unfilled mined-out areas, (2) in situ monitoring of strata movement by multi-point ex tensometers in 3 vertical boreholes; (3) FEM (Finite Element Method) analysis to study the relationship between the ground subsidence and mining excavation, especially to inspect the influence of unfilled mined-out areas at shallow depth on the subsidence. Based on the research results, measures to control the ground subsidence and to prevent buildings from damage are provided.展开更多
The East Open Pits of Daye Iron Mine were closed in year 2000 and the ore beyond the pit limit was planned to be mined by underground ways. In order to facilitate the smooth transition to underground mining, hanging-w...The East Open Pits of Daye Iron Mine were closed in year 2000 and the ore beyond the pit limit was planned to be mined by underground ways. In order to facilitate the smooth transition to underground mining, hanging-wall ores in the old pits were scheduled to be mined. Xiangbishan pit is one of the four mining spots selected. In 1979 when the pit was mined to around 36 m a.s.l., a landside of around 70000 m3 occurred in its North Slope, leading to the closure of the pit. The pit was then backfilled to 60 m a.s.l. to maintain the slope stability. The hanging-wall ore to be mined is just located below the old slide, so whether the slide will be reactivated and how to control its deformation and stability are the key issues concerned. Based on geological investigation and numerical analysis, it was predicted that the slide would be reactivated and a control measure using the intact ore body as a retaining wall was thus suggested. During mining, displacements were monitored to assure safety. By July, 2003, 383000 tons of ore were successfully mined. Though the observed displacement reached 8795 mm, no major failure happened. The final slope is 110 m high with an angle of 70°.展开更多
基金Foundation item: Supported by Supported by the National Natural Science Foundation of China (Grant No. 51009070).
文摘In this paper, 2-D computational analyses were conducted for unsteady high Reynolds number flows around a smooth circular cylinder in the supercritical and upper-transition flow regimes, i.e. 8.21×104〈Re〈1.54×106. The calculations were performed by means of solving the 2-D Unsteady Reynolds-Averaged Navier-Stokes (URANS) equations with a k-ε turbulence model. The calculated results, produced flow structure drag and lift coefficients, as well as Strouhal numbers. The findings were in good agreement with previous published data, which also supplied us with a good understanding of the flow across cylinders of different high Reynolds numbers. Meanwhile, an effective measure was presented to control the lift force on a cylinder, which points the way to decrease the vortex induced vibration of marine structure in future.
文摘Ground subsidence in a Chinese underground gold mine is remarkable. To find out reasons and regularities of the subsidence, following research work was carried out: (1) systemetical investigations of engineering geological conditions, including in situ stress sta- te, locstion and size of old river beds, ponds and unfilled mined-out areas, (2) in situ monitoring of strata movement by multi-point ex tensometers in 3 vertical boreholes; (3) FEM (Finite Element Method) analysis to study the relationship between the ground subsidence and mining excavation, especially to inspect the influence of unfilled mined-out areas at shallow depth on the subsidence. Based on the research results, measures to control the ground subsidence and to prevent buildings from damage are provided.
文摘The East Open Pits of Daye Iron Mine were closed in year 2000 and the ore beyond the pit limit was planned to be mined by underground ways. In order to facilitate the smooth transition to underground mining, hanging-wall ores in the old pits were scheduled to be mined. Xiangbishan pit is one of the four mining spots selected. In 1979 when the pit was mined to around 36 m a.s.l., a landside of around 70000 m3 occurred in its North Slope, leading to the closure of the pit. The pit was then backfilled to 60 m a.s.l. to maintain the slope stability. The hanging-wall ore to be mined is just located below the old slide, so whether the slide will be reactivated and how to control its deformation and stability are the key issues concerned. Based on geological investigation and numerical analysis, it was predicted that the slide would be reactivated and a control measure using the intact ore body as a retaining wall was thus suggested. During mining, displacements were monitored to assure safety. By July, 2003, 383000 tons of ore were successfully mined. Though the observed displacement reached 8795 mm, no major failure happened. The final slope is 110 m high with an angle of 70°.