期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
General Consideration of Measuring System for Operational Test of Thyristor Valves of Ultra High Voltage DC Power Transmission 被引量:1
1
作者 ZHOU Hui-gao XU Fan +2 位作者 ZHANG Chang-chun HU Zhi-long LIU Pu 《高压电器》 CAS CSCD 北大核心 2011年第9期1-5,共5页
Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their oper... Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers. 展开更多
关键词 UHVDC thyristor valves operational test synthetic test circuit measuring system planning
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部