Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accor...Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accordingly,collaborative optimization in power generation expansion planning(GEP)simultaneously considering economic,environmental,and technological concerns as carbon emissions is necessary.This paper proposes a collaborative mixedinteger linear programming optimization approach for GEP.This minimizes the power system’s operating cost to resolve emission concerns considering energy development strategies,flexible generation,and resource limitations constraints.This research further analyzes the advantages and disadvantages of current GEP techniques.Results show that the main determinants of new investment decisions are carbon emissions,reserve margins,resource availability,fuel consumption,and fuel price.The proposed optimization method is simulated and validated based on China’s power system data.Finally,this study provides policy recommendations on the flexible management of traditional power sources,the market-oriented mechanism of new energy sources,and the integration of new technology to support the attainment of carbon-neutral targets in the current energy transition process.展开更多
The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, ...The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, discrete investment costs, various operating conditions are considered in the model. The model is a mixed-integer linear programming formulation for a static TEP in the competitive environment. The presented methodology is applied to six-node system. In order to point out efficiency of the model the results obtained are compared with traditional problem solution.展开更多
The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast ne...The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast new worldfor the development of China’s food industry.The food industry should seize the opportunityto strengthen itself and speed up itsdevelopment for meeting the needs ofimproving the people’s living standards andperform well in modernized socialistconstruction.展开更多
A number of piping components in the secondary system of nuclear power plants are exposed to aging mechanisms such as FAC (Flow-Accelerated Corrosion), cavitation, flashing, SPE (Solid Particle Erosion), LDIE (Liquid ...A number of piping components in the secondary system of nuclear power plants are exposed to aging mechanisms such as FAC (Flow-Accelerated Corrosion), cavitation, flashing, SPE (Solid Particle Erosion), LDIE (Liquid Droplet Impingement Erosion), etc. Those mechanisms may lead to thinning, leak, or rupture of the components. Due to the pipe ruptures caused by wall thinning in Surry unit 2 of USA in 1986 and in Mihama unit 3 of Japan in 1994, the pipe wall thinning management has emerged as one of the most important issues in nuclear power plants. To manage the pipe wall thinning in the secondary system, Korea has used a foreign program since 1996. As using the foreign country’s program for long term, it was necessary to improve from the perspective of the users. Accordingly, KEPCO-E & C has started to develop the 3D-based pipe wall thinning management program (ToSPACE, Total Solution for Piping And Component Engineering management) from eight years ago, and the development was successful. This paper describes the major functions included in ToSPACE program, such as 3D-based DB (Database) buildup, development of FAC and erosion evaluation theories, UT (Ultra-sonic Test) data reliability analysis, field connection with 3D, automatic establishment of long-term inspection plan, etc. ToSPACE program was developed to allow site engineers performing the selection of inspection quantity at each refueling outage, UT data reliability analysis, UT evaluation, determination of next inspection timing, identification of the inspecting and replacing components in 3D drawings, etc., to access easily.展开更多
基金supported by the Natural Science Foundation of Shandong Province (No.ZR2019MEE078)Education and Teaching Reform Research Project of Shandong University (“Development of an experiment platform to support the intelligent energy courses”)。
文摘Decarbonization of the power sector in China is an essential aspect of the energy transition process to achieve carbon neutrality.The power sector accounts for approximately 40%of China’s total CO_(2) emissions.Accordingly,collaborative optimization in power generation expansion planning(GEP)simultaneously considering economic,environmental,and technological concerns as carbon emissions is necessary.This paper proposes a collaborative mixedinteger linear programming optimization approach for GEP.This minimizes the power system’s operating cost to resolve emission concerns considering energy development strategies,flexible generation,and resource limitations constraints.This research further analyzes the advantages and disadvantages of current GEP techniques.Results show that the main determinants of new investment decisions are carbon emissions,reserve margins,resource availability,fuel consumption,and fuel price.The proposed optimization method is simulated and validated based on China’s power system data.Finally,this study provides policy recommendations on the flexible management of traditional power sources,the market-oriented mechanism of new energy sources,and the integration of new technology to support the attainment of carbon-neutral targets in the current energy transition process.
文摘The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, discrete investment costs, various operating conditions are considered in the model. The model is a mixed-integer linear programming formulation for a static TEP in the competitive environment. The presented methodology is applied to six-node system. In order to point out efficiency of the model the results obtained are compared with traditional problem solution.
文摘The"Ninth Five-Year Plan for theNational Economy and SocialDevelopment and the Long-TermTarget by the Year 2010" adopted at theFourth Session of the Eighth National People’sCongress have opened up a vast new worldfor the development of China’s food industry.The food industry should seize the opportunityto strengthen itself and speed up itsdevelopment for meeting the needs ofimproving the people’s living standards andperform well in modernized socialistconstruction.
文摘A number of piping components in the secondary system of nuclear power plants are exposed to aging mechanisms such as FAC (Flow-Accelerated Corrosion), cavitation, flashing, SPE (Solid Particle Erosion), LDIE (Liquid Droplet Impingement Erosion), etc. Those mechanisms may lead to thinning, leak, or rupture of the components. Due to the pipe ruptures caused by wall thinning in Surry unit 2 of USA in 1986 and in Mihama unit 3 of Japan in 1994, the pipe wall thinning management has emerged as one of the most important issues in nuclear power plants. To manage the pipe wall thinning in the secondary system, Korea has used a foreign program since 1996. As using the foreign country’s program for long term, it was necessary to improve from the perspective of the users. Accordingly, KEPCO-E & C has started to develop the 3D-based pipe wall thinning management program (ToSPACE, Total Solution for Piping And Component Engineering management) from eight years ago, and the development was successful. This paper describes the major functions included in ToSPACE program, such as 3D-based DB (Database) buildup, development of FAC and erosion evaluation theories, UT (Ultra-sonic Test) data reliability analysis, field connection with 3D, automatic establishment of long-term inspection plan, etc. ToSPACE program was developed to allow site engineers performing the selection of inspection quantity at each refueling outage, UT data reliability analysis, UT evaluation, determination of next inspection timing, identification of the inspecting and replacing components in 3D drawings, etc., to access easily.