Regenerator checkerwork for glass melting furnaces should have high resistance against thermal stress and chemical attack,high mechanical stability,high efficiency to recover the heat from waste gas and low tendency f...Regenerator checkerwork for glass melting furnaces should have high resistance against thermal stress and chemical attack,high mechanical stability,high efficiency to recover the heat from waste gas and low tendency for clogging.This article reviews the innovation of the regenerator checkerwork from the past decades.The state of the art for optimised material choice and optimised checker shapes will be reported.展开更多
JC/T 494-92(96) 1 ScopeThis standard specifies the technical requirements, test methods, inspection rules, marking, packing, transportation, and storage of fused cast alumina refractory products for glass melting furn...JC/T 494-92(96) 1 ScopeThis standard specifies the technical requirements, test methods, inspection rules, marking, packing, transportation, and storage of fused cast alumina refractory products for glass melting furnace. This standard is applicable to the fused cast alumina refractory products for glass melting furnace (called products for short).2 Normative ReferencesGB 2997 Test method for apparent porosity, water absorption, bulk density and true porosity of dense shaped refractory productsGB 5072 Test method for cold crushing strength of dense shaped refractory productsGB 5989 Test method for refractoriness under load of dense shaped refractory products (Differential, with rising temperature)GB 7320 Test method for thermal expansion of refractory productsGB 10204 Test method for corrosion resistance of refractories for glass melting furnace to molten glassGB 10325 Stacking, sampling, acceptance, storage and transportation of shaped refractory productsGB 10326 Inspections of dimension, appearance and section of refractory productsGB/T 14351 Chemical analysis method of fused cast alumina refractoriesYB 4015 Sample preparation for testing of refractory products for glass melting furnaceYB 4016 Sampling and inspection of refractory products for glass melting furnaceJC 493 Fused cast zirconia corundum refractory products for glass melting展开更多
The change of bubbles and the position of the tuyere in an oxygen coal combustion melting and separating furnace affect the flow and splash behavior of the molten pool.To analyze this problem further,a three-dimension...The change of bubbles and the position of the tuyere in an oxygen coal combustion melting and separating furnace affect the flow and splash behavior of the molten pool.To analyze this problem further,a three-dimensional numerical simulation method was used to explore the behavior and change of the flow field inside the molten pool during double-row tuyere injection.In addition,the arrangement of the tuyere was changed for a more detailed understanding of the internal phase distribution and splashing in a molten pool.The results indicated that under three-dimensional numerical simulation conditions,bubbles rise after leaving the tuyere and break on the surface of the molten pool,which results in certain fluctuations in the nearby melt.During the injection process of the tuyere,the meteorological accumulation in the middle part of the molten pool formed part of the foam slag because of the influence of surface tension.When the layout of the upper and lower exhaust tuyeres was changed from staggered to symmetrical,or when the spacing of the upper and lower exhaust tuyeres changed,it had an effect on the phase distribution and splash behavior.展开更多
文摘Regenerator checkerwork for glass melting furnaces should have high resistance against thermal stress and chemical attack,high mechanical stability,high efficiency to recover the heat from waste gas and low tendency for clogging.This article reviews the innovation of the regenerator checkerwork from the past decades.The state of the art for optimised material choice and optimised checker shapes will be reported.
文摘JC/T 494-92(96) 1 ScopeThis standard specifies the technical requirements, test methods, inspection rules, marking, packing, transportation, and storage of fused cast alumina refractory products for glass melting furnace. This standard is applicable to the fused cast alumina refractory products for glass melting furnace (called products for short).2 Normative ReferencesGB 2997 Test method for apparent porosity, water absorption, bulk density and true porosity of dense shaped refractory productsGB 5072 Test method for cold crushing strength of dense shaped refractory productsGB 5989 Test method for refractoriness under load of dense shaped refractory products (Differential, with rising temperature)GB 7320 Test method for thermal expansion of refractory productsGB 10204 Test method for corrosion resistance of refractories for glass melting furnace to molten glassGB 10325 Stacking, sampling, acceptance, storage and transportation of shaped refractory productsGB 10326 Inspections of dimension, appearance and section of refractory productsGB/T 14351 Chemical analysis method of fused cast alumina refractoriesYB 4015 Sample preparation for testing of refractory products for glass melting furnaceYB 4016 Sampling and inspection of refractory products for glass melting furnaceJC 493 Fused cast zirconia corundum refractory products for glass melting
基金supported by the National Key R&D Program of China(2017YFB0603800 and 2017YFB0603802).
文摘The change of bubbles and the position of the tuyere in an oxygen coal combustion melting and separating furnace affect the flow and splash behavior of the molten pool.To analyze this problem further,a three-dimensional numerical simulation method was used to explore the behavior and change of the flow field inside the molten pool during double-row tuyere injection.In addition,the arrangement of the tuyere was changed for a more detailed understanding of the internal phase distribution and splashing in a molten pool.The results indicated that under three-dimensional numerical simulation conditions,bubbles rise after leaving the tuyere and break on the surface of the molten pool,which results in certain fluctuations in the nearby melt.During the injection process of the tuyere,the meteorological accumulation in the middle part of the molten pool formed part of the foam slag because of the influence of surface tension.When the layout of the upper and lower exhaust tuyeres was changed from staggered to symmetrical,or when the spacing of the upper and lower exhaust tuyeres changed,it had an effect on the phase distribution and splash behavior.