A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project...A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project has been lifted from the upstream channel to supplement water to the downstream lake inside the city.Through preliminary geological survey data,site topographic and geomorphic survey,urban construction,as well as the requirements of the construction party,the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed.Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking.Through detailed survey,the rock and soil change section as well as gradual change conditions have been determined,the accuracy of construction mechanics calculation and construction operation control have improved,the basis and analysis basis are provided,and some experiences in construction operation are summarized.展开更多
A semi-analytical form of complex modal analysis is proposed for the time-variant dynamical problem of rotating pipe conveying fluid system.The complex mode superposition method is introduced for the dynamic analysis ...A semi-analytical form of complex modal analysis is proposed for the time-variant dynamical problem of rotating pipe conveying fluid system.The complex mode superposition method is introduced for the dynamic analysis in the time and frequency domains,in which appropriate orthogonality conditions are constructed to decouple the time-variant equation of motion.Consequently,complex frequencies and modes of vibration are analytically formulated and the variations of frequencies and damping of the system are evaluated.Numerical time-variant example of rotating pipe conveying fluid illustrates the effectiveness and accuracy of this method.Furthermore,the proposed solution scheme is also applicable to other similar time-variant dynamical problems.展开更多
Based on the analysis for the situation about heat pipe,this paper points out that high efficiency micro heat pipe,high temperaturelarge heat pipe,high efficiency heat pipe reaction equipment and high efficiency heat ...Based on the analysis for the situation about heat pipe,this paper points out that high efficiency micro heat pipe,high temperaturelarge heat pipe,high efficiency heat pipe reaction equipment and high efficiency heat pipe heat exchange equipment are the developing di-rection of the heat pipe,and the complex heat pipe system is a new heat pipe idea that can satisfy the modern large heat pipe heat exchangeequipment and the high efficiency heat pipe heat exchange equipment.A new complex heat pipe system that is called double circulation con-trollable heat pipe system is advanced and several basic structure modes are given in this paper.The working principle and the basic character-istics about this special heat pipe system are also introduced and analyzed.展开更多
文摘A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project has been lifted from the upstream channel to supplement water to the downstream lake inside the city.Through preliminary geological survey data,site topographic and geomorphic survey,urban construction,as well as the requirements of the construction party,the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed.Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking.Through detailed survey,the rock and soil change section as well as gradual change conditions have been determined,the accuracy of construction mechanics calculation and construction operation control have improved,the basis and analysis basis are provided,and some experiences in construction operation are summarized.
基金supported by National Natural Science Foundation of China(Project No.11572229)Shanghai Chenguang Plan(Project No.14CG18)Fundamental Research Funds for the Central Universities(Project No.22120180063).
文摘A semi-analytical form of complex modal analysis is proposed for the time-variant dynamical problem of rotating pipe conveying fluid system.The complex mode superposition method is introduced for the dynamic analysis in the time and frequency domains,in which appropriate orthogonality conditions are constructed to decouple the time-variant equation of motion.Consequently,complex frequencies and modes of vibration are analytically formulated and the variations of frequencies and damping of the system are evaluated.Numerical time-variant example of rotating pipe conveying fluid illustrates the effectiveness and accuracy of this method.Furthermore,the proposed solution scheme is also applicable to other similar time-variant dynamical problems.
文摘Based on the analysis for the situation about heat pipe,this paper points out that high efficiency micro heat pipe,high temperaturelarge heat pipe,high efficiency heat pipe reaction equipment and high efficiency heat pipe heat exchange equipment are the developing di-rection of the heat pipe,and the complex heat pipe system is a new heat pipe idea that can satisfy the modern large heat pipe heat exchangeequipment and the high efficiency heat pipe heat exchange equipment.A new complex heat pipe system that is called double circulation con-trollable heat pipe system is advanced and several basic structure modes are given in this paper.The working principle and the basic character-istics about this special heat pipe system are also introduced and analyzed.