Freeze-sealing pipe roof method is applied in the Gongbei tunnel,which causes the ground surface uplift induced by frost heave.A frost heaving prediction approach based on the coefficient of cold expansion is proposed...Freeze-sealing pipe roof method is applied in the Gongbei tunnel,which causes the ground surface uplift induced by frost heave.A frost heaving prediction approach based on the coefficient of cold expansion is proposed to simulate the ground deformation of the Gongbei tunnel.The coefficient of cold expansion in the model and the frost heaving rate from the frost heave test under the hydration condition can achieve a good correspondence making the calculation result closer to the actual engineering.The ground surface uplift along the lateral and longitudinal direction are respectively analyzed and compared with the field measured data to validate the model.The results show that a good agreement between the frost heaving prediction model and the field measured data verifies the rationality and applicability of the proposed model.The maximum uplift of the Gongbei tunnel appears at the center of the model,gradually decreasing along with the lateral and longitudinal directions.The curve in the lateral direction presents a normal distribution due to the influence of the constraint of two sides,while the one along the lateral direction shapes like a parabola with the opening downward due to the temperature field distribution.The model provides a reference for frost heaving engineering calculation.展开更多
In recent years, in reaction to the increasing usage of urban areas, the excavation of underground spaces has been developed. One of the most challenging issues encountered by engineers is the construction of subway s...In recent years, in reaction to the increasing usage of urban areas, the excavation of underground spaces has been developed. One of the most challenging issues encountered by engineers is the construction of subway stations as large underground spaces at shallow depth with soft surrounding soils. In this paper, Naghshe Jahan Square subway station located in Isfahan, Iran, has been simulated by geomechanical fnite difference method(FDM). This station is located under important historical structures. Therefore, the ground displacement and surface settlement induced by the excavation of the subway station should be strictly controlled. Many of such problems are affected by selected excavation method. For these reasons, different underground excavation methods associated with construction have been studied. In this study, sequential excavation method and large-diameter curved pipe roofng method are used and the numerical results of the two methods are compared. The presence of groundwater table obliges us to choose special techniques for the stability of the ground around the subway station during construction; hence compressed air and ground freezing techniques are utilized in the simulations of the subway station. Finally, after choosing appropriate support systems, the large-diameter curved pipe roofng method with 1.5 m spacing between curved pipes is proposed.展开更多
针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示...针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示原矿山法设计施工方案存在的不足,并基于此提出“矿山法结合地层冻结加固方案”和“机械顶管法施工方案”2种优化方案;随后在安全性、经济性、施工工期等方面对不同工法进行综合优选分析,同时引入碳排放指标进行绿色低碳评估。研究结果表明:1)机械顶管法在安全性和施工效率上优于其他方案,能够显著缩短施工周期;2)相比矿山法结合地层冻结加固方案,机械顶管法方案碳排放量减少了2 747.51 t CO_(2e)。展开更多
基金supported by the financial support from National Natural Science Foundation of China(No.51478340)Natural Science Foundation of Jiangsu Province(No.BK20200707)+4 种基金The Natural Science Foundation of the Jiangsu Higher Education Institutions of China(No.20KJB560029)China Postdoctoral Science Foundation(No.2020M671670)Key Laboratory of Soft Soils and Geoenvironmental Engineering(Zhejiang University)Ministry of Education(No.2020P04)the support above is gratefully acknowledged.
文摘Freeze-sealing pipe roof method is applied in the Gongbei tunnel,which causes the ground surface uplift induced by frost heave.A frost heaving prediction approach based on the coefficient of cold expansion is proposed to simulate the ground deformation of the Gongbei tunnel.The coefficient of cold expansion in the model and the frost heaving rate from the frost heave test under the hydration condition can achieve a good correspondence making the calculation result closer to the actual engineering.The ground surface uplift along the lateral and longitudinal direction are respectively analyzed and compared with the field measured data to validate the model.The results show that a good agreement between the frost heaving prediction model and the field measured data verifies the rationality and applicability of the proposed model.The maximum uplift of the Gongbei tunnel appears at the center of the model,gradually decreasing along with the lateral and longitudinal directions.The curve in the lateral direction presents a normal distribution due to the influence of the constraint of two sides,while the one along the lateral direction shapes like a parabola with the opening downward due to the temperature field distribution.The model provides a reference for frost heaving engineering calculation.
文摘In recent years, in reaction to the increasing usage of urban areas, the excavation of underground spaces has been developed. One of the most challenging issues encountered by engineers is the construction of subway stations as large underground spaces at shallow depth with soft surrounding soils. In this paper, Naghshe Jahan Square subway station located in Isfahan, Iran, has been simulated by geomechanical fnite difference method(FDM). This station is located under important historical structures. Therefore, the ground displacement and surface settlement induced by the excavation of the subway station should be strictly controlled. Many of such problems are affected by selected excavation method. For these reasons, different underground excavation methods associated with construction have been studied. In this study, sequential excavation method and large-diameter curved pipe roofng method are used and the numerical results of the two methods are compared. The presence of groundwater table obliges us to choose special techniques for the stability of the ground around the subway station during construction; hence compressed air and ground freezing techniques are utilized in the simulations of the subway station. Finally, after choosing appropriate support systems, the large-diameter curved pipe roofng method with 1.5 m spacing between curved pipes is proposed.
文摘针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示原矿山法设计施工方案存在的不足,并基于此提出“矿山法结合地层冻结加固方案”和“机械顶管法施工方案”2种优化方案;随后在安全性、经济性、施工工期等方面对不同工法进行综合优选分析,同时引入碳排放指标进行绿色低碳评估。研究结果表明:1)机械顶管法在安全性和施工效率上优于其他方案,能够显著缩短施工周期;2)相比矿山法结合地层冻结加固方案,机械顶管法方案碳排放量减少了2 747.51 t CO_(2e)。