期刊文献+
共找到94,819篇文章
< 1 2 250 >
每页显示 20 50 100
Functional Characteristics of Beijing Subway Stations Based on POI Data:Taking Beijing Metro Line 6 as An Example 被引量:1
1
作者 SUN Shuai LIU Ting AI Jie 《Journal of Landscape Research》 2023年第3期27-30,共4页
Urban subway station is a key node related to urban social,political,economic and cultural activities.There are some differences in the location,function orientation,land use and flow characteristics of different type... Urban subway station is a key node related to urban social,political,economic and cultural activities.There are some differences in the location,function orientation,land use and flow characteristics of different types of stations in the city.This paper mainly used Tyson’s edge,kernel density analysis,chart analysis and other methods to classify the functional types of 412,393 POI data of 26 stations along Metro he results showed that the spatial distribution of Beijing Metro Line 6 was mainly divided into 3 categories,subway stations were divided into 4 categories.Among them,type A sites were divided into composite and single types,and the distribution characteristics of the 6 types of sites were quite different.Based on the qualitative and quantitative analysis of POI point data,this method can quickly classify and analyze the characteristics of stations along Line 6 in Beijing,which also has theoretical and practical value for the planning of urban subway lines. 展开更多
关键词 Urban functional areas Subway station POI data
下载PDF
Translation of Metro Station Names in Guangzhou and Foshan from the Perspective of Symbolic Function of Translation Landscape
2
作者 LUO Yu LI Xiao-yun 《Journal of Literature and Art Studies》 2023年第4期304-310,共7页
Guangzhou and Foshan enjoy relatively mature metro network.However,some names of metro stations are over-transliterated in Pinyin.Such a translation method is used in translating general names,nouns of locality and so... Guangzhou and Foshan enjoy relatively mature metro network.However,some names of metro stations are over-transliterated in Pinyin.Such a translation method is used in translating general names,nouns of locality and some names of tourist destinations.With translation landscape and linguistic landscape theories,the reasons and impacts of over-transliteration in Guangzhou and Foshan metro will be discussed from the perspective of symbolic function.English names of Metro stations in other cities serve as a reference so as to appropriate solutions. 展开更多
关键词 names of metro stations translation landscape linguistic landscape Pinyin transliteration
下载PDF
Models to Simulate Effective Coverage of Fire Station Based on Real-Time Travel Times
3
作者 Sicheng Zhu Dingli Liu +2 位作者 Weijun Liu Ying Li Tian Zhou 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第4期483-513,共31页
In recent years,frequent fire disasters have led to enormous damage in China.Effective firefighting rescues can minimize the losses caused by fires.During the rescue processes,the travel time of fire trucks can be sev... In recent years,frequent fire disasters have led to enormous damage in China.Effective firefighting rescues can minimize the losses caused by fires.During the rescue processes,the travel time of fire trucks can be severely affected by traffic conditions,changing the effective coverage of fire stations.However,it is still challenging to determine the effective coverage of fire stations considering dynamic traffic conditions.This paper addresses this issue by combining the traveling time calculationmodelwith the effective coverage simulationmodel.In addition,it proposes a new index of total effective coverage area(TECA)based on the time-weighted average of the effective coverage area(ECA)to evaluate the urban fire services.It also selects China as the case study to validate the feasibility of the models,a fire station(FS-JX)in Changsha.FS-JX station and its surrounding 9,117 fire risk points are selected as the fire service supply and demand points,respectively.A total of 196 simulation scenarios throughout a consecutiveweek are analyzed.Eventually,1,933,815 sets of valid sample data are obtained.The results showed that the TECA of FS-JX is 3.27 km^(2),which is far below the standard requirement of 7.00 km^(2) due to the traffic conditions.The visualization results showed that three rivers around FS-JX interrupt the continuity of its effective coverage.The proposed method can provide data support to optimize the locations of fire stations by accurately and dynamically determining the effective coverage of fire stations. 展开更多
关键词 Fire services fire station effective coverage real-time traffic SIMULATION
下载PDF
Regenerative Braking Energy Recovery System ofMetro Train Based on Dual-Mode PowerManagement
4
作者 Feng Zhao Xiaotong Zhu +1 位作者 Xiaoqiang Chen Ying Wang 《Energy Engineering》 EI 2024年第9期2585-2601,共17页
In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strat... In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strategy is proposed.Firstly,the construction of the hybrid regenerative braking energy recovery system is explained.Then,based on the power demand of low-voltage load in metro stations,a dual-mode power management strategy is proposed to allocate the reference power of each system according to the different working conditions,and the control methods of each system are set.Finally,the correctness and effectiveness of the dual-mode strategy are verified through simulation,and the proposed braking energy utilization scheme is compared with other singleform utilization schemes.The results illustrate that the hybrid system with the dual-mode strategy can effectively recycle the regenerative braking energy of metro train and inhibit the busbar voltage fluctuation;the proposed braking energy utilization scheme has certain advantages on energy recovery and DC bus voltage stabilization compared with other single-form schemes;the proposed power management strategy can correctly allocate the reference power of each system with a lower construction cost. 展开更多
关键词 metro train regenerative braking energy energy feed-back system energy storage system power management
下载PDF
Evaluation of a Wireless Solar Powered Personal Weather Station
5
作者 Robert J. Lascano Timothy S. Goebel +1 位作者 Dennis C. Gitz III John E. Stout 《Agricultural Sciences》 2024年第1期36-53,共18页
We are evaluating dryland cotton production in Martin County, Texas, measuring cotton lint yield per unit of rainfall. Our goal is to collect rainfall data per 250 - 400 ha. Upon selection of a rainfall gauge, we real... We are evaluating dryland cotton production in Martin County, Texas, measuring cotton lint yield per unit of rainfall. Our goal is to collect rainfall data per 250 - 400 ha. Upon selection of a rainfall gauge, we realized that the cost of using, for example, a tipping bucket-type rain gauge would be too expensive and thus searched for an alternative method. We selected an all-in-one commercially available weather station;hereafter, referred to as a Personal Weather Station (PWS) that is both wireless and solar powered. Our objective was to evaluate average measurements of rainfall obtained with the PWS and to compare these to measurements obtained with an automatic weather station (AWS). For this purpose, we installed four PWS deployed within 20 m of the Plant Stress and Water Conservation Meteorological Tower that was used as our AWS, located at USDA-ARS Cropping Systems Research Laboratory, Lubbock, TX. In addition, we measured and compared hourly average values of short-wave irradiance (R<sub>g</sub>), air temperature (T<sub>air</sub>) and relative humidity (RH), and wind speed (WS), and calculated values of dewpoint temperature (T<sub>dew</sub>). This comparison was done over a 242-day period (1 October 2022-31 May 2023) and results indicated that there was no statistical difference in measurements of rainfall between the PWS and AWS. Hourly average values of R<sub>g</sub> measured with the PWS and AWS agreed on clear days, but PWS measurements were higher on cloudy days. There was no statistical difference between PWS and AWS hourly average measurements of T<sub>air</sub>, RH, and calculated T<sub>dew</sub>. Hourly average measurements of R<sub>g</sub> and WS were more variable. We concluded that the PWS we selected will provide adequate values of rainfall and other weather variables to meet our goal of evaluating dryland cotton lint yield per unit rainfall. 展开更多
关键词 AUTOMATION Sensors Citizen Weather station Mesonet RAINFALL Weather Variables
下载PDF
Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling
6
作者 Peng Qiao Shuangshuang Lan +1 位作者 Hongbiao Gu Zhengtan Mao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第5期1381-1399,共19页
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co... Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state. 展开更多
关键词 Underground reservoir fluid-structure coupling numerical simulation pumped storage power station filling and discharge
下载PDF
Strategic Placement of Charging Stations for Enhanced Electric Vehicle Adoption in San Diego, California
7
作者 Kajal Sheth Dhvanil Patel 《Journal of Transportation Technologies》 2024年第1期64-81,共18页
California mandated that 100% of vehicles sold must be electric by 2035. As electric vehicles (EVs) reach a higher penetration of the car sector, cities will need to provide publicly accessible charging stations to me... California mandated that 100% of vehicles sold must be electric by 2035. As electric vehicles (EVs) reach a higher penetration of the car sector, cities will need to provide publicly accessible charging stations to meet the charging demand of people who do not have access to a private charging spot like a personal garage. We have chosen to limit our scope to San Diego County due to its non-trivial size, well-defined shape, and dependence on personal vehicles;this project models 100% of current vehicles as electric, roughly 2.5 million. By planning for the future, our model becomes more useful as well as more equitable. We anticipate that our model will find locations that can service multiple population centers, while also maximizing distance to other stations. Sensitivity analysis and testing of our algorithms are conducted for Coronado Island, an island with 24,697 residents. Our formulation is then scaled to set the parameters for the whole county. 展开更多
关键词 Electric Vehicles Charging stations Energy Policy Infrastructure Planning Environmental Sustainability
下载PDF
Mechanical responses of underground carriageway structures due to construction of metro tunnels beneath the existing structure:A case study
8
作者 Xin Han Fei Ye +3 位作者 Xingbo Han Chao Ren Jing Song Ruliang Zhao 《Deep Underground Science and Engineering》 2024年第2期231-246,共16页
To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and str... To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and stress variation of the existing structure and the effect of underground carriageway structures on the surface subsidence.The curves of the maximum differential subsidence,torsion angle,and distortion of the cross-section of the existing structure show two peaks in succession during traversing of two metro tunnels beneath it.The torsion angle of the existing structure changes when the two tunnels traverse beneath it in opposite directions.The first traversing of the shield tunnel mainly induces the magnitude variation in torsional deformation of the existing structure,but the second traversing of the subsurface tunnel may cause a dynamic change in the magnitude and form of torsional deformation in the existing structure.The shielding effect can reduce the surface subsidence caused by metro tunnel excavation to a certain extent,and the development trend of subsidence becomes slower as the excavation continues. 展开更多
关键词 metro tunnel numerical simulation structural deformation surface subsidence underground carriageway structure
下载PDF
A Multi-Objective Optimization for Locating Maintenance Stations and Operator Dispatching of Corrective Maintenance
9
作者 Chao-Lung Yang Melkamu Mengistnew Teshome +1 位作者 Yu-Zhen Yeh Tamrat Yifter Meles 《Computers, Materials & Continua》 SCIE EI 2024年第6期3519-3547,共29页
In this study,we introduce a novel multi-objective optimization model tailored for modern manufacturing,aiming to mitigate the cost impacts of operational disruptions through optimized corrective maintenance.Central t... In this study,we introduce a novel multi-objective optimization model tailored for modern manufacturing,aiming to mitigate the cost impacts of operational disruptions through optimized corrective maintenance.Central to our approach is the strategic placement of maintenance stations and the efficient allocation of personnel,addressing a crucial gap in the integration of maintenance personnel dispatching and station selection.Our model uniquely combines the spatial distribution of machinery with the expertise of operators to achieve a harmonious balance between maintenance efficiency and cost-effectiveness.The core of our methodology is the NSGA Ⅲ+Dispatch,an advanced adaptation of the Non-Dominated Sorting Genetic Algorithm Ⅲ(NSGA-Ⅲ),meticulously designed for the selection of maintenance stations and effective operator dispatching.This method integrates a comprehensive coding process,crossover operator,and mutation operator to efficiently manage multiple objectives.Rigorous empirical testing,including a detailed analysis from a taiwan region electronic equipment manufacturer,validated the effectiveness of our approach across various scenarios of machine failure frequencies and operator configurations.The findings reveal that the proposed model significantly outperforms current practices by reducing response times by up to 23%in low-frequency and 28.23%in high-frequency machine failure scenarios,leading to notable improvements in efficiency and cost reduction.Additionally,it demonstrates significant improvements in oper-ational efficiency,particularly in selective high-frequency failure contexts,while ensuring substantial manpower cost savings without compromising on operational effectiveness.This research significantly advances maintenance strategies in production environments,providing the manufacturing industry with practical,optimized solutions for diverse machine malfunction situations.Furthermore,the methodologies and principles developed in this study have potential applications in various other sectors,including healthcare,transportation,and energy,where maintenance efficiency and resource optimization are equally critical. 展开更多
关键词 Corrective maintenance multi-objective optimization non-dominated sorting genetic algorithmⅢ operator allocation maintenance station location
下载PDF
Research and exploration of direct current power supply and distribution systems for Antarctic research stations
10
作者 WANG Lei 《Advances in Polar Science》 CSCD 2024年第2期228-237,共10页
The power supply and distribution systems for Antarctic research stations have special characteristics.In light of a worldwide trend toward a gradual increase in the application of renewable energy,an analysis was per... The power supply and distribution systems for Antarctic research stations have special characteristics.In light of a worldwide trend toward a gradual increase in the application of renewable energy,an analysis was performed to assess the feasibility of achieving a direct current power supply and distribution at Antarctic research stations by comparing the characteristics of direct current and alternating current electricity.Research was also performed on the status quo and future trends in direct current power supply and distribution systems in Antarctica research stations in combination with case studies. 展开更多
关键词 direct current alternating current renewable energy ANTARCTIC research station
下载PDF
Research on Operation Optimization of Energy Storage Power Station and Integrated Energy Microgrid Alliance Based on Stackelberg Game
11
作者 Yu Zhang Lianmin Li +1 位作者 Zhongxiang Liu Yuhu Wu 《Energy Engineering》 EI 2024年第5期1209-1221,共13页
With the development of renewable energy technologies such as photovoltaics and wind power,it has become a research hotspot to improve the consumption rate of new energy and reduce energy costs through the deployment ... With the development of renewable energy technologies such as photovoltaics and wind power,it has become a research hotspot to improve the consumption rate of new energy and reduce energy costs through the deployment of energy storage.To solve the problem of the interests of different subjects in the operation of the energy storage power stations(ESS)and the integrated energy multi-microgrid alliance(IEMA),this paper proposes the optimization operation method of the energy storage power station and the IEMA based on the Stackelberg game.In the upper layer,ESS optimizes charging and discharging decisions through a dynamic pricing mechanism.In the lower layer,IEMA optimizes the output of various energy conversion coupled devices within the IEMA,as well as energy interaction and demand response(DR),based on the energy interaction prices provided by ESS.The results demonstrate that the optimization strategy proposed in this paper not only effectively balances the benefits of the IEMA and ESS but also enhances energy consumption rates and reduces IEMA energy costs. 展开更多
关键词 Energy storage station dynamic pricing mechanism stackelberg game integrated energy multi-microgrid alliance demand response
下载PDF
Optimal Scheduling of Multiple Rail Cranes in Rail Stations with Interference Crane Areas
12
作者 Nguyen Vu Anh Duy Nguyen Le Thai Nguyen Huu Tho 《Intelligent Automation & Soft Computing》 2024年第1期15-31,共17页
In this paper,we consider a multi-crane scheduling problem in rail stations because their operations directly influence the throughput of the rail stations.In particular,the job is not only assigned to cranes but also... In this paper,we consider a multi-crane scheduling problem in rail stations because their operations directly influence the throughput of the rail stations.In particular,the job is not only assigned to cranes but also the job sequencing is implemented for each crane to minimize the makespan of cranes.A dual cycle of cranes is used to minimize the number of working cycles of cranes.The rail crane scheduling problems in this study are based on the movement of containers.We consider not only the gantry moves,but also the trolley moves as well as the rehandle cases are also included.A mathematical model of multi-crane scheduling is developed.The traditional and parallel simulated annealing(SA)are adapted to determine the optimal scheduling solutions.Numerical examples are conducted to evaluate the applicability of the proposed algorithms.Verification of the proposed parallel SA is done by comparing it to existing previous works.Results of numerical computation highlighted that the parallel SA algorithm outperformed the SA and gave better solutions than other considered algorithms. 展开更多
关键词 Multi-crane scheduling logistics containers MAKESPAN rail stations
下载PDF
Study on site selection planning of urban electric vehicle charging station
13
作者 刘娜 CHENG Jiaxin DUAN Yukai 《High Technology Letters》 EI CAS 2024年第1期75-84,共10页
The large-scale development of electric vehicles(EVs)requires numerous charging stations to serve them,and the charging stations should be reasonably laid out and planned according to the charging demand of electric v... The large-scale development of electric vehicles(EVs)requires numerous charging stations to serve them,and the charging stations should be reasonably laid out and planned according to the charging demand of electric vehicles.Considering the costs of both operators and users,a site selection model for optimal layout planning of charging stations is constructed,and a queuing theory approach is used to determine the charging pile configuration to meet the charging demand in the planning area.To solve the difficulties of particle swarm global optimization search,the improved random drift particle swarm optimization(IRDPSO)and Voronoi diagram are used to jointly solve for the optimal layout of electric vehicles.The final arithmetic analysis verifies the feasibility and practicality of the model and algorithm,and the results show that the total social cost is minimized when the charging station is 9,the location of the charging station is close to the center of gravity and the layout is reasonable. 展开更多
关键词 charging station electric vehicle(EV) improved random drift particle swarm optimization(IRDPSO) optimal planning
下载PDF
Estimation of Daily Global Solar Radiation with Different Sunshine-Based Models for Some Burundian Stations
14
作者 Mathias Bashahu Gratien Ndacayisaba 《Energy and Power Engineering》 2024年第1期1-20,共20页
Sunshine duration (S) based empirical equations have been employed in this study to estimate the daily global solar radiation on a horizontal surface (G) for six meteorological stations in Burundi. Those equations inc... Sunshine duration (S) based empirical equations have been employed in this study to estimate the daily global solar radiation on a horizontal surface (G) for six meteorological stations in Burundi. Those equations include the Ångström-Prescott linear model and four amongst its derivatives, i.e. logarithmic, exponential, power and quadratic functions. Monthly mean values of daily global solar radiation and sunshine duration data for a period of 20 to 23 years, from the Geographical Institute of Burundi (IGEBU), have been used. For any of the six stations, ten single or double linear regressions have been developed from the above-said five functions, to relate in terms of monthly mean values, the daily clearness index () to each of the next two kinds of relative sunshine duration (RSD): and . In those ratios, G<sub>0</sub>, S<sub>0 </sub>and stand for the extraterrestrial daily solar radiation on a horizontal surface, the day length and the modified day length taking into account the natural site’s horizon, respectively. According to the calculated mean values of the clearness index and the RSD, each station experiences a high number of fairly clear (or partially cloudy) days. Estimated values of the dependent variable (y) in each developed linear regression, have been compared to measured values in terms of the coefficients of correlation (R) and of determination (R<sub>2</sub>), the mean bias error (MBE), the root mean square error (RMSE) and the t-statistics. Mean values of these statistical indicators have been used to rank, according to decreasing performance level, firstly the ten developed equations per station on account of the overall six stations, secondly the six stations on account of the overall ten equations. Nevertheless, the obtained values of those indicators lay in the next ranges for all the developed sixty equations:;;;, with . These results lead to assert that any of the sixty developed linear regressions (and thus equations in terms of and ), fits very adequately measured data, and should be used to estimate monthly average daily global solar radiation with sunshine duration for the relevant station. It is also found that using as RSD, is slightly more advantageous than using for estimating the monthly average daily clearness index, . Moreover, values of statistical indicators of this study match adequately data from other works on the same kinds of empirical equations. 展开更多
关键词 Clearness Index Two Kinds of Relative Sunshine Duration Ångström-Prescott Linear Model and Four Derivatives Statistical Tests Six Burundian stations
下载PDF
Discussion on Dust Removal(Suppression)System of Crushing Station in Open-Pit Coal Mine
15
作者 Hong ZHANG Lin LIN Bo CAO 《Asian Agricultural Research》 2024年第2期18-21,共4页
This paper introduces the method of coal dust treatment in crushing station and the present situation of dust removal system in typical open-pit coal mine crushing station in China,and expounds the research idea of de... This paper introduces the method of coal dust treatment in crushing station and the present situation of dust removal system in typical open-pit coal mine crushing station in China,and expounds the research idea of determining comprehensive dust removal(suppression)system in crushing station inspired by the working principle of"range hood".Based on the design example and link optimization of the crush-ing station of open-pit coal mine I of Thar coalfield,this paper finally draws some conclusions on the key technologies of dust removal(suppression)system of open-pit coal mine crushing station.This study has certain reference value for the technical innovation of dust removal(suppression)system in crushing station,the realization of green mining in"crushing link",and the reduction and avoidance of ecological environment pollution in mining area. 展开更多
关键词 Crushing station Closed dust cover Wind curtain wall Air volume simulation Dust suppression by spraying
下载PDF
Optimization study of station track utilization in high-speed railroad based on constraints of control in random origin and process
16
作者 Yajing Zheng Dekun Zhang 《Railway Sciences》 2024年第3期332-343,共12页
Purpose-The purpose of this paper is to eliminate the fluctuations in train arrival and departure times caused by skewed distributions in interval operation times.These fluctuations arise from random origin and proces... Purpose-The purpose of this paper is to eliminate the fluctuations in train arrival and departure times caused by skewed distributions in interval operation times.These fluctuations arise from random origin and process factors during interval operations and can accumulate over multiple intervals.The aim is to enhance the robustness of high-speed rail station arrival and departure track utilization schemes.Design/methodologylapproach-To achieve this objective,the paper simulates actual train operations,incorporating the fluctuations in interval operation times into the utilization of arrival and departure tracks at the station.The Monte Carlo simulation method is adopted to solve this problem.This approach transforms a nonlinear model,which includes constraints from probability distribution functions and is difficult to solve directly,into a linear programming model that is easier to handle.The method then linearly weights two objectives to optimize the solution.Findings-Through the application of Monte Carlo simulation,the study successfully converts the complex nonlinear model with probability distribution function constraints into a manageable linear programming model.By continuously adjusting the weighting coefficients of the linear objectives,the method is able to optimize the Pareto solution.Notably,this approach does not require extensive scene data to obtain a satisfactory Pareto solution set.Originality/value-The paper contributes to the field by introducing a novel method for optimizing high-speed rail station arrival and departure track utilization in the presence of fluctuations in interval operation times.The use of Monte Carlo simulation to transform the problem into a tractable linear programming model represents a significant advancement.Furthermore,the method's ability to produce satisfactory Pareto solutions without relying on extensive data sets adds to its practical value and applicability in real-world scenarios. 展开更多
关键词 Control in random origin Control in random process High-speed railroad station Arrival and departure track utilization Optimization Paper type Research paper
下载PDF
Research on the Practice of Cross-Border E-Commerce Strategies: Taking Alibaba International Station as an Example
17
作者 Jiong’en Xiao Xiaosha He Yiyang Lu 《Journal of Electronic Research and Application》 2024年第4期168-173,共6页
Currently,Alibaba International Station,as an emerging e-commerce platform in recent years,plays a crucial role in cross-border e-commerce trade.This article describes an overview of Alibaba International Station,as w... Currently,Alibaba International Station,as an emerging e-commerce platform in recent years,plays a crucial role in cross-border e-commerce trade.This article describes an overview of Alibaba International Station,as well as the methods of attracting traffic and some current problems encountered.Simultaneously,relevant suggestions are provided based on the problems. 展开更多
关键词 Alibaba International station Drainage USER
下载PDF
《In a station of the Metro》在中国的翻译与阐释 被引量:2
18
作者 王琳 《株洲师范高等专科学校学报》 2006年第4期100-102,共3页
庞德的《In a station of the Metro》一诗在中国的翻译与阐释存在很多不足,甚至出现了误读。这种误读有深刻的动因:中国古典诗歌及诗论影响了庞德诗歌及诗论.这种影响反过来左右着中国读者对意象派诗歌的理解。
关键词 庞德 意象派诗歌 In a station of the metro 翻译 误读
下载PDF
Risk identification and risk mitigation during metro station construction by enlarging shield tunnel combined with cut-and-cover method 被引量:3
19
作者 Zhang, Xinjin Liu, Weining Lu, Meili 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期142-146,共5页
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n... Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method. 展开更多
关键词 shield tunnel cut-and-cover method metro station risk identification risk mitigation
下载PDF
Metro passenger flow control with station-to-station cooperation based on stop-skipping and boarding limiting 被引量:11
20
作者 姜曼 李海鹰 +2 位作者 许心越 徐仕鹏 苗建瑞 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第1期236-244,共9页
Metro passenger flow control problem is studied under given total inbound demand in this work,which considers passenger demand control and train capacity supply.Relevant connotations are analyzed and a mathematical mo... Metro passenger flow control problem is studied under given total inbound demand in this work,which considers passenger demand control and train capacity supply.Relevant connotations are analyzed and a mathematical model is developed.The decision variables are boarding limiting and stop-skipping strategies and the objective is the maximal passenger profit.And a passenger original station choice model based on utility theory is built to modify the inbound passenger distribution among stations.Algorithm of metro passenger flow control scheme is designed,where two key technologies of stopping-station choice and headway adjustment are given and boarding limiting and train stopping-station scheme are optimized.Finally,a real case of Beijing metro is taken for example to verify validity.The results show that in the three scenarios with different ratios of normal trains to stop-skipping trains,the total limited passenger volume is the smallest and the systematic profit is the largest in scenario 3. 展开更多
关键词 地铁站 流控制 限位 客流分布 协同 最大利润 控制问题 旅客需求
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部