In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strat...In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strategy is proposed.Firstly,the construction of the hybrid regenerative braking energy recovery system is explained.Then,based on the power demand of low-voltage load in metro stations,a dual-mode power management strategy is proposed to allocate the reference power of each system according to the different working conditions,and the control methods of each system are set.Finally,the correctness and effectiveness of the dual-mode strategy are verified through simulation,and the proposed braking energy utilization scheme is compared with other singleform utilization schemes.The results illustrate that the hybrid system with the dual-mode strategy can effectively recycle the regenerative braking energy of metro train and inhibit the busbar voltage fluctuation;the proposed braking energy utilization scheme has certain advantages on energy recovery and DC bus voltage stabilization compared with other single-form schemes;the proposed power management strategy can correctly allocate the reference power of each system with a lower construction cost.展开更多
To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and str...To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and stress variation of the existing structure and the effect of underground carriageway structures on the surface subsidence.The curves of the maximum differential subsidence,torsion angle,and distortion of the cross-section of the existing structure show two peaks in succession during traversing of two metro tunnels beneath it.The torsion angle of the existing structure changes when the two tunnels traverse beneath it in opposite directions.The first traversing of the shield tunnel mainly induces the magnitude variation in torsional deformation of the existing structure,but the second traversing of the subsurface tunnel may cause a dynamic change in the magnitude and form of torsional deformation in the existing structure.The shielding effect can reduce the surface subsidence caused by metro tunnel excavation to a certain extent,and the development trend of subsidence becomes slower as the excavation continues.展开更多
The advent of the big data era has provided many types of transportation datasets,such as metro smart card data,for studying residents’mobility and understanding how their mobility has been shaped and is shaping the ...The advent of the big data era has provided many types of transportation datasets,such as metro smart card data,for studying residents’mobility and understanding how their mobility has been shaped and is shaping the urban space.In this paper,we use metro smart card data from two Chinese metropolises,Shanghai and Shenzhen.Five metro mobility indicators are introduced,and association rules are established to explore the mobility patterns.The proportion of people entering and exiting the station is used to measure the jobs-housing balance.It is found that the average travel distance and duration of Shanghai passengers are higher than those of Shenzhen,and the proportion of metro commuters in Shanghai is higher than that of Shenzhen.The jobs-housing spatial relationship in Shenzhen based on metro travel is more balanced than that in Shanghai.The fundamental reason for the differences between the two cities is the difference in urban morphology.Compared with the monocentric structure of Shanghai,the polycentric structure of Shenzhen results in more scattered travel hotspots and more diverse travel routes,which helps Shenzhen to have a better jobs-housing balance.This paper fills a gap in comparative research among Chinese cities based on transportation big data analysis.The results provide support for planning metro routes,adjusting urban structure and land use to form a more reasonable metro network,and balancing the jobs-housing spatial relationship.展开更多
Purpose–The principle of infinite life design currently directs fatigue resistance strategies for metro car bodies.However,this principle might not fully account for the dynamic influence of operational loads and the...Purpose–The principle of infinite life design currently directs fatigue resistance strategies for metro car bodies.However,this principle might not fully account for the dynamic influence of operational loads and the inevitable presence of defects.This study aims to integrate methods of service life estimation and residual life assessment,which are based on operational loads,into the existing infinite life verification framework to further ensure the operational safety of subway trains.Design/methodology/approach–Operational loads and fatigue loading spectra were determined through the field test.The material test was conducted to investigate characteristics of the fracture toughness and the crack growth rate.The fatigue strength of the metro car body was first verified using the finite element method and Moore–Kommers–Japer diagrams.The service life was then estimated by applying the Miner rule and high-cycle fatigue curves in a modified form of the Basquin equation.Finally,the residual life was assessed utilizing a fracture assessment diagram and a fitted curve of crack growth rate adhered to the Paris formula.Findings–Neither the maximum utilization factor nor the cumulative damage exceeds the threshold value of 1.0,the metro car body could meet the design life requirement of 30 years or 6.6 million km.However,three out of five fatigue key points were significantly influenced by the operational loads,which indicates that a single fatigue strength verification cannot achieve the infinite life design objective of the metro car body.For a projected design life of 30 years,the tolerance depth is 12.2 mm,which can underscore a relatively robust damage tolerance capability.Originality/value–The influence of operational loads on fatigue life was presented by the discrepancy analysis between fatigue strength verification results and service life estimation results.The fracture properties of butt-welded joints were tested and used for the damage tolerance assessment.The damage tolerance life can be effectively related by a newly developed equation in this study.It can be a valuable tool to provide the theoretical guidance and technical support for the structural improvements and maintenance decisions of the metro car body.展开更多
Purpose – The volume of passenger traffic at metro transfer stations serves as a pivotal metric for theorchestration of crowd flow management. Given the intricacies of crowd dynamics within these stations andthe recu...Purpose – The volume of passenger traffic at metro transfer stations serves as a pivotal metric for theorchestration of crowd flow management. Given the intricacies of crowd dynamics within these stations andthe recurrent instances of substantial passenger influxes, a methodology predicated on stochastic processesand the principle of user equilibrium is introduced to facilitate real-time traffic flow estimation within transferstation streamlines.Design/methodology/approach – The synthesis of stochastic process theory with streamline analysisengenders a probabilistic model of intra-station pedestrian traffic dynamics. Leveraging real-time passengerflow data procured from monitoring systems within the transfer station, a gradient descent optimizationtechnique is employed to minimize the cost function, thereby deducing the dynamic distribution of categorizedpassenger flows. Subsequently, adhering to the tenets of user equilibrium, the Frank–Wolfe algorithm isimplemented to allocate the intra-station categorized passenger flows across various streamlines, ascertainingthe traffic volume for each.Findings – Utilizing the Xiaozhai Station of the Xi’an Metro as a case study, the Anylogic simulation softwareis engaged to emulate the intra-station crowd dynamics, thereby substantiating the efficacy of the proposedpassenger flow estimation model. The derived solutions are instrumental in formulating a crowd controlstrategy for Xiaozhai Station during the peak interval from 17:30 to 18:00 on a designated day, yielding crowdmanagement interventions that offer insights for the orchestration of passenger flow and operationalgovernance within metro stations.Originality/value – The construction of an estimation methodology for the real-time streamline traffic flowaugments the model’s dataset, supplanting estimated values derived from surveys or historical datasets withreal-time computed traffic data, thereby enhancing the precision and immediacy of crowd flow managementwithin metro stations.展开更多
As a key node for the surrounding area,metro stations are closely connected with the surrounding urban space and develop cooperatively.Different types of metro stations have differences in land use and functional posi...As a key node for the surrounding area,metro stations are closely connected with the surrounding urban space and develop cooperatively.Different types of metro stations have differences in land use and functional positioning.This paper mainly used the methods of Tyson polygon,kernel density analysis and correlation analysis,based on POI data,to classify the stations of Beijing Metro Line 7.This paper made a detailed analysis of commercial subway stations,and analyzed the distribution characteristics of commercial metro stations on Line 7.展开更多
This study explores the factors influencing metro passengers’ arrival volume in Wuhan, China, and Lagos, Nigeria, by examining weather, time of day, waiting time, travel behavior, arrival patterns, and metro satisfac...This study explores the factors influencing metro passengers’ arrival volume in Wuhan, China, and Lagos, Nigeria, by examining weather, time of day, waiting time, travel behavior, arrival patterns, and metro satisfaction. It addresses a significant research gap in understanding metro passengers’ dynamics across cultural and geographical contexts. It employs questionnaires, field observations, and advanced data analysis techniques like association rule mining and neural network modeling. Key findings include a correlation between rainy weather, shorter waiting times, and higher arrival volumes. Neural network models showed high predictive accuracy, with waiting time, metro satisfaction, and weather being significant factors in Lagos Light Rail Blue Line Metro. In contrast, arrival patterns, weather, and time of day were more influential in Wuhan Metro Line 5. Results suggest that improving metro satisfaction and reducing waiting times could increase arrival volumes in Lagos Metro while adjusting schedules for weather and peak times could optimize flow in Wuhan Metro. These insights are valuable for transportation planning, passenger arrival volume management, and enhancing user experiences, potentially benefiting urban transportation sustainability and development goals.展开更多
Seoul Metro is Seoul’s leading metro company, transporting up to 3 billion people annually. However, future ridership is expected to plummet due to an aging and shrinking population with one of the fastest declining ...Seoul Metro is Seoul’s leading metro company, transporting up to 3 billion people annually. However, future ridership is expected to plummet due to an aging and shrinking population with one of the fastest declining total fertility rates in the world. The COVID-19 pandemic in 2019 accelerated this phenomenon. On the contrary, the e-commerce and home delivery industries have developed significantly since COVID-19. Seoul’s current logistics infrastructure cannot handle it. Under the inflection point of declining passenger transportation demand and increasing urban logistics demand, urban rail operators need new growth engines. Therefore, it is necessary to consider the introduction of an UULS (underground urban logistics system) that transports parcels instead of passengers through urban railways. If the UULS becomes a reality, it can be expected to secure scarce logistics land in cities, protect the environment and prevent traffic congestion by operating eco-friendly mass urban transportation, and acquire new revenue sources for urban rail operators. The UULS’s B/C ratio is 1.32. The sensitivity analysis shows that the ratio is above 1 in most cases where the unit cost of transportation is not significantly reduced.展开更多
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in...Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.展开更多
This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Da...This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Dalian,China.Due to the large error between the initial geological exploration data and real strata,the project construction is extremely difficult.In view of the current situation regarding the project,a quantitative method for evaluating the tunneling efficiency was proposed using cutterhead rotation(R),advance speed(S),total thrust(F)and torque(T).A total of 80 datasets with three input parameters and one output variable(F or T)were collected from this project,and a prediction framework based gray system model was established.Based on the prediction model,five prediction schemes were set up.Through error analysis,the optimal prediction scheme was obtained from the five schemes.The parametric investigation performed indicates that the relationships between F and the three input variables in the gray system model harmonize with the theoretical explanation.The case shows that the shield tunneling performance and efficiency are improved by the tunneling parameter prediction model based on the gray system model.展开更多
With advantages of strong drive capability,nested-loop secondary linear machine(NLS-LM)has great potentiality in linear metro.For its secondary structure with multiple loops,it is difficult to calculate the electromag...With advantages of strong drive capability,nested-loop secondary linear machine(NLS-LM)has great potentiality in linear metro.For its secondary structure with multiple loops,it is difficult to calculate the electromagnetic thrust of NLS-LM reasonably.Hence,in this paper,one thrust calculation method is proposed considering variable loop inductance and transient loop current.Firstly,to establish the secondary winding function,the modeling domain is confined to a limited range,and the equivalent loop span is employed by analyzing the coupling relationship between primary and secondary.Then,in order to obtain the secondary flux density,the transient secondary current is solved based on the loop impedance and induced voltage.Finally,the electromagnetic thrust can be calculated reasonably by the given primary current sheet and the calculated secondary flux density.Comprehensive simulations and experiments have demonstrated the effectiveness of the proposed method.展开更多
Railway turnout is one of the critical equipment of Switch&Crossing(S&C)Systems in railway,related to the train’s safety and operation efficiency.With the advancement of intelligent sensors,data-driven fault ...Railway turnout is one of the critical equipment of Switch&Crossing(S&C)Systems in railway,related to the train’s safety and operation efficiency.With the advancement of intelligent sensors,data-driven fault detection technology for railway turnout has become an important research topic.However,little research in the literature has investigated the capability of data-driven fault detection technology for metro railway turnout.This paper presents a convolutional autoencoder-based fault detection method for the metro railway turnout considering human field inspection scenarios.First,the one-dimensional original time-series signal is converted into a twodimensional image by data pre-processing and 2D representation.Next,a binary classification model based on the convolutional autoencoder is developed to implement fault detection.The profile and structure information can be captured by processing data as images.The performance of our method is evaluated and tested on real-world operational current data in themetro stations.Experimental results show that the proposedmethod achieves better performance,especially in terms of error rate and specificity,and is robust in practical engineering applications.展开更多
The high reliability of the communication system is critical in metro and mining applications for personal safety,channel optimization,and improving operational performance.This paper surveys the progress of wireless ...The high reliability of the communication system is critical in metro and mining applications for personal safety,channel optimization,and improving operational performance.This paper surveys the progress of wireless communication systems in underground environments such as tunnels and mines from 1920 to 2022,including the evolution of primitive technology,advancements in channel modelling,and realization of various wireless propagation channels.In addition,the existing and advanced channel modeling strategies,which include the evolution of different technologies and their applications;mathematical,analytical,and experimental techniques for radio propagation;and significance of the radiation characteristics,antenna placement,and physical environment of multiple-input multiple-output(MIMO)communication systems,are analyzed.The given study introduces leaky coaxial cable(LCX)and distributed antenna system(DAS)designs for improving narrowband and wideband channel capacity.The paper concludes by figuring out open research areas for the future technologies.展开更多
Purpose–To address the problem that the current train operation mode that train selects one of several offline pre-generated control schemes before the departure and operates following the scheme after the departure,...Purpose–To address the problem that the current train operation mode that train selects one of several offline pre-generated control schemes before the departure and operates following the scheme after the departure,energy-saving performance of the whole metro system cannot be guaranteed.Design/methodology/approach–A cooperative train control framework is formulated to regulate a novel train operation mode.The classic train four-phase control strategy is improved for generating specific energy-efficient control schemes for each train.An improved brute force(BF)algorithm with a two-layer searching idea is designed to solve the optimisation model of energy-efficient train control schemes.Findings–Case studies on the actual metro line in Guangzhou,China verify the effectiveness of the proposed train control methods compared with four-phase control strategy under different kinds of train operation scenarios and calculation parameters.The verification on the computation efficiency as well as accuracy of the proposed algorithm indicates that it meets the requirement of online optimisation.Originality/value–Most existing studies optimised energy-efficient train timetable or train control strategies through an offline process,which has a defect in coping with the disturbance or delays effectively and promptly during real-time train operation.This paper studies an online optimisation of cooperative train control based on the rolling optimisation idea,where energy-efficient train operation can be realised once train running time is determined,thus mitigating the impact of unpredictable operation situations on the energy-saving performance of trains.展开更多
Guangzhou and Foshan enjoy relatively mature metro network.However,some names of metro stations are over-transliterated in Pinyin.Such a translation method is used in translating general names,nouns of locality and so...Guangzhou and Foshan enjoy relatively mature metro network.However,some names of metro stations are over-transliterated in Pinyin.Such a translation method is used in translating general names,nouns of locality and some names of tourist destinations.With translation landscape and linguistic landscape theories,the reasons and impacts of over-transliteration in Guangzhou and Foshan metro will be discussed from the perspective of symbolic function.English names of Metro stations in other cities serve as a reference so as to appropriate solutions.展开更多
Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optim...Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.展开更多
Purpose–This study purposes to study the influence of artificial freezing on the liquefaction characteristics of Nanjing sand,as well as its mechanism.Design/methodology/approach–was studied through dynamic triaxial...Purpose–This study purposes to study the influence of artificial freezing on the liquefaction characteristics of Nanjing sand,as well as its mechanism.Design/methodology/approach–was studied through dynamic triaxial tests by means of the GDS dynamic triaxial system on Nanjing sand extensively discovered in the middle and lower reaches of the Yangtze River under seismic load and metro train vibration load,respectively,and potential hazards of the two loads to the freezing construction of Nanjing sand were also identified in the tests.Findings–The results show that under both seismic load and metro train vibration load,freeze-thaw cycles will significantly reduce the stiffness and liquefaction resistance of Nanjing sand,especially in the first freezethaw cycle;the more freeze-thaw cycles,the worse structural behaviors of silty-fine sand,and the easier to liquefy;freeze-thaw cycles will increase the sensitivity of Nanjing sand’s dynamic pore pressure to dynamic load response;the lower the freezing temperature and the effective confining pressure,the worse the liquefaction resistance of Nanjing sand after freeze-thaw cycles;compared to the metro train vibration load,the seismic load in Nanjing is potentially less dangerous to freezing construction of Nanjing sand.Originality/value–The research results are helpful to the construction of the artificial ground freezing of the subway crossing passage in the lower reaches of the Yangtze River and to ensure the construction safety of the subway tunnel and its crossing passage.展开更多
基金funded by Project supported by the Natural Science Foundation of Gansu Province,China(Grant No.22JR5RA318).
文摘In order to fully utilize the regenerative braking energy of metro trains and stabilize the metro DC traction busbar voltage,a hybrid regenerative braking energy recovery system with a dual-mode power management strategy is proposed.Firstly,the construction of the hybrid regenerative braking energy recovery system is explained.Then,based on the power demand of low-voltage load in metro stations,a dual-mode power management strategy is proposed to allocate the reference power of each system according to the different working conditions,and the control methods of each system are set.Finally,the correctness and effectiveness of the dual-mode strategy are verified through simulation,and the proposed braking energy utilization scheme is compared with other singleform utilization schemes.The results illustrate that the hybrid system with the dual-mode strategy can effectively recycle the regenerative braking energy of metro train and inhibit the busbar voltage fluctuation;the proposed braking energy utilization scheme has certain advantages on energy recovery and DC bus voltage stabilization compared with other single-form schemes;the proposed power management strategy can correctly allocate the reference power of each system with a lower construction cost.
基金National Natural Science Foundation of China,Grant/Award Numbers:51878060,52078046。
文摘To understand the mechanical response pattern of the existing structure and ground due to the construction of metro tunnels underneath,the finite difference method is adopted to study the torsional deformation and stress variation of the existing structure and the effect of underground carriageway structures on the surface subsidence.The curves of the maximum differential subsidence,torsion angle,and distortion of the cross-section of the existing structure show two peaks in succession during traversing of two metro tunnels beneath it.The torsion angle of the existing structure changes when the two tunnels traverse beneath it in opposite directions.The first traversing of the shield tunnel mainly induces the magnitude variation in torsional deformation of the existing structure,but the second traversing of the subsurface tunnel may cause a dynamic change in the magnitude and form of torsional deformation in the existing structure.The shielding effect can reduce the surface subsidence caused by metro tunnel excavation to a certain extent,and the development trend of subsidence becomes slower as the excavation continues.
基金National Key R&D Program of China(No.2019YFB2103102)Hong Kong Polytechnic University(No.CD06,P0042540)。
文摘The advent of the big data era has provided many types of transportation datasets,such as metro smart card data,for studying residents’mobility and understanding how their mobility has been shaped and is shaping the urban space.In this paper,we use metro smart card data from two Chinese metropolises,Shanghai and Shenzhen.Five metro mobility indicators are introduced,and association rules are established to explore the mobility patterns.The proportion of people entering and exiting the station is used to measure the jobs-housing balance.It is found that the average travel distance and duration of Shanghai passengers are higher than those of Shenzhen,and the proportion of metro commuters in Shanghai is higher than that of Shenzhen.The jobs-housing spatial relationship in Shenzhen based on metro travel is more balanced than that in Shanghai.The fundamental reason for the differences between the two cities is the difference in urban morphology.Compared with the monocentric structure of Shanghai,the polycentric structure of Shenzhen results in more scattered travel hotspots and more diverse travel routes,which helps Shenzhen to have a better jobs-housing balance.This paper fills a gap in comparative research among Chinese cities based on transportation big data analysis.The results provide support for planning metro routes,adjusting urban structure and land use to form a more reasonable metro network,and balancing the jobs-housing spatial relationship.
基金the CRRC Zhuzhou Locomotive Co.,Ltd.and Shanghai Railway Certification(Group)Co.,Ltd.This research was funded by the Major Research Project of CRRC(No.2022CYY007 and No.2020CCA094).
文摘Purpose–The principle of infinite life design currently directs fatigue resistance strategies for metro car bodies.However,this principle might not fully account for the dynamic influence of operational loads and the inevitable presence of defects.This study aims to integrate methods of service life estimation and residual life assessment,which are based on operational loads,into the existing infinite life verification framework to further ensure the operational safety of subway trains.Design/methodology/approach–Operational loads and fatigue loading spectra were determined through the field test.The material test was conducted to investigate characteristics of the fracture toughness and the crack growth rate.The fatigue strength of the metro car body was first verified using the finite element method and Moore–Kommers–Japer diagrams.The service life was then estimated by applying the Miner rule and high-cycle fatigue curves in a modified form of the Basquin equation.Finally,the residual life was assessed utilizing a fracture assessment diagram and a fitted curve of crack growth rate adhered to the Paris formula.Findings–Neither the maximum utilization factor nor the cumulative damage exceeds the threshold value of 1.0,the metro car body could meet the design life requirement of 30 years or 6.6 million km.However,three out of five fatigue key points were significantly influenced by the operational loads,which indicates that a single fatigue strength verification cannot achieve the infinite life design objective of the metro car body.For a projected design life of 30 years,the tolerance depth is 12.2 mm,which can underscore a relatively robust damage tolerance capability.Originality/value–The influence of operational loads on fatigue life was presented by the discrepancy analysis between fatigue strength verification results and service life estimation results.The fracture properties of butt-welded joints were tested and used for the damage tolerance assessment.The damage tolerance life can be effectively related by a newly developed equation in this study.It can be a valuable tool to provide the theoretical guidance and technical support for the structural improvements and maintenance decisions of the metro car body.
文摘Purpose – The volume of passenger traffic at metro transfer stations serves as a pivotal metric for theorchestration of crowd flow management. Given the intricacies of crowd dynamics within these stations andthe recurrent instances of substantial passenger influxes, a methodology predicated on stochastic processesand the principle of user equilibrium is introduced to facilitate real-time traffic flow estimation within transferstation streamlines.Design/methodology/approach – The synthesis of stochastic process theory with streamline analysisengenders a probabilistic model of intra-station pedestrian traffic dynamics. Leveraging real-time passengerflow data procured from monitoring systems within the transfer station, a gradient descent optimizationtechnique is employed to minimize the cost function, thereby deducing the dynamic distribution of categorizedpassenger flows. Subsequently, adhering to the tenets of user equilibrium, the Frank–Wolfe algorithm isimplemented to allocate the intra-station categorized passenger flows across various streamlines, ascertainingthe traffic volume for each.Findings – Utilizing the Xiaozhai Station of the Xi’an Metro as a case study, the Anylogic simulation softwareis engaged to emulate the intra-station crowd dynamics, thereby substantiating the efficacy of the proposedpassenger flow estimation model. The derived solutions are instrumental in formulating a crowd controlstrategy for Xiaozhai Station during the peak interval from 17:30 to 18:00 on a designated day, yielding crowdmanagement interventions that offer insights for the orchestration of passenger flow and operationalgovernance within metro stations.Originality/value – The construction of an estimation methodology for the real-time streamline traffic flowaugments the model’s dataset, supplanting estimated values derived from surveys or historical datasets withreal-time computed traffic data, thereby enhancing the precision and immediacy of crowd flow managementwithin metro stations.
基金Beijing Municipal Social Science Foundation(22GLC062).
文摘As a key node for the surrounding area,metro stations are closely connected with the surrounding urban space and develop cooperatively.Different types of metro stations have differences in land use and functional positioning.This paper mainly used the methods of Tyson polygon,kernel density analysis and correlation analysis,based on POI data,to classify the stations of Beijing Metro Line 7.This paper made a detailed analysis of commercial subway stations,and analyzed the distribution characteristics of commercial metro stations on Line 7.
文摘This study explores the factors influencing metro passengers’ arrival volume in Wuhan, China, and Lagos, Nigeria, by examining weather, time of day, waiting time, travel behavior, arrival patterns, and metro satisfaction. It addresses a significant research gap in understanding metro passengers’ dynamics across cultural and geographical contexts. It employs questionnaires, field observations, and advanced data analysis techniques like association rule mining and neural network modeling. Key findings include a correlation between rainy weather, shorter waiting times, and higher arrival volumes. Neural network models showed high predictive accuracy, with waiting time, metro satisfaction, and weather being significant factors in Lagos Light Rail Blue Line Metro. In contrast, arrival patterns, weather, and time of day were more influential in Wuhan Metro Line 5. Results suggest that improving metro satisfaction and reducing waiting times could increase arrival volumes in Lagos Metro while adjusting schedules for weather and peak times could optimize flow in Wuhan Metro. These insights are valuable for transportation planning, passenger arrival volume management, and enhancing user experiences, potentially benefiting urban transportation sustainability and development goals.
基金the Ministry of Land,Infrastructure and Transport and Korea Agency for Infrastructure Technology Advancement(22HCLP-C163194-02)。
文摘Seoul Metro is Seoul’s leading metro company, transporting up to 3 billion people annually. However, future ridership is expected to plummet due to an aging and shrinking population with one of the fastest declining total fertility rates in the world. The COVID-19 pandemic in 2019 accelerated this phenomenon. On the contrary, the e-commerce and home delivery industries have developed significantly since COVID-19. Seoul’s current logistics infrastructure cannot handle it. Under the inflection point of declining passenger transportation demand and increasing urban logistics demand, urban rail operators need new growth engines. Therefore, it is necessary to consider the introduction of an UULS (underground urban logistics system) that transports parcels instead of passengers through urban railways. If the UULS becomes a reality, it can be expected to secure scarce logistics land in cities, protect the environment and prevent traffic congestion by operating eco-friendly mass urban transportation, and acquire new revenue sources for urban rail operators. The UULS’s B/C ratio is 1.32. The sensitivity analysis shows that the ratio is above 1 in most cases where the unit cost of transportation is not significantly reduced.
基金National Natural Science Foundation of China (Grant No.52178393)the Science and Technology Innovation Team of Shaanxi Innovation Capability Support Plan (Grant No.2020TD005)Science and Technology Innovation Project of China Railway Construction Bridge Engineering Bureau Group Co.,Ltd.(Grant No.DQJ-2020-B07)。
文摘Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.
基金support by the National Natural Science Foundation of China(Grant Nos.52108377,52090084,and 51938008).
文摘This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Dalian,China.Due to the large error between the initial geological exploration data and real strata,the project construction is extremely difficult.In view of the current situation regarding the project,a quantitative method for evaluating the tunneling efficiency was proposed using cutterhead rotation(R),advance speed(S),total thrust(F)and torque(T).A total of 80 datasets with three input parameters and one output variable(F or T)were collected from this project,and a prediction framework based gray system model was established.Based on the prediction model,five prediction schemes were set up.Through error analysis,the optimal prediction scheme was obtained from the five schemes.The parametric investigation performed indicates that the relationships between F and the three input variables in the gray system model harmonize with the theoretical explanation.The case shows that the shield tunneling performance and efficiency are improved by the tunneling parameter prediction model based on the gray system model.
基金supported in part by the National Natural Science Foundation of China under Grants 52277050the Shenzhen International Collaboration under Grant GJHZ20210705142539007。
文摘With advantages of strong drive capability,nested-loop secondary linear machine(NLS-LM)has great potentiality in linear metro.For its secondary structure with multiple loops,it is difficult to calculate the electromagnetic thrust of NLS-LM reasonably.Hence,in this paper,one thrust calculation method is proposed considering variable loop inductance and transient loop current.Firstly,to establish the secondary winding function,the modeling domain is confined to a limited range,and the equivalent loop span is employed by analyzing the coupling relationship between primary and secondary.Then,in order to obtain the secondary flux density,the transient secondary current is solved based on the loop impedance and induced voltage.Finally,the electromagnetic thrust can be calculated reasonably by the given primary current sheet and the calculated secondary flux density.Comprehensive simulations and experiments have demonstrated the effectiveness of the proposed method.
基金supported in part by the National Natural Science Foundation of China under Grant U1734211.
文摘Railway turnout is one of the critical equipment of Switch&Crossing(S&C)Systems in railway,related to the train’s safety and operation efficiency.With the advancement of intelligent sensors,data-driven fault detection technology for railway turnout has become an important research topic.However,little research in the literature has investigated the capability of data-driven fault detection technology for metro railway turnout.This paper presents a convolutional autoencoder-based fault detection method for the metro railway turnout considering human field inspection scenarios.First,the one-dimensional original time-series signal is converted into a twodimensional image by data pre-processing and 2D representation.Next,a binary classification model based on the convolutional autoencoder is developed to implement fault detection.The profile and structure information can be captured by processing data as images.The performance of our method is evaluated and tested on real-world operational current data in themetro stations.Experimental results show that the proposedmethod achieves better performance,especially in terms of error rate and specificity,and is robust in practical engineering applications.
文摘The high reliability of the communication system is critical in metro and mining applications for personal safety,channel optimization,and improving operational performance.This paper surveys the progress of wireless communication systems in underground environments such as tunnels and mines from 1920 to 2022,including the evolution of primitive technology,advancements in channel modelling,and realization of various wireless propagation channels.In addition,the existing and advanced channel modeling strategies,which include the evolution of different technologies and their applications;mathematical,analytical,and experimental techniques for radio propagation;and significance of the radiation characteristics,antenna placement,and physical environment of multiple-input multiple-output(MIMO)communication systems,are analyzed.The given study introduces leaky coaxial cable(LCX)and distributed antenna system(DAS)designs for improving narrowband and wideband channel capacity.The paper concludes by figuring out open research areas for the future technologies.
基金This research was supported by the National Natural Science Foundation of China(Grant No.71971016).On behalf of all co-authors,the corresponding author states that there is no conflict of interest.
文摘Purpose–To address the problem that the current train operation mode that train selects one of several offline pre-generated control schemes before the departure and operates following the scheme after the departure,energy-saving performance of the whole metro system cannot be guaranteed.Design/methodology/approach–A cooperative train control framework is formulated to regulate a novel train operation mode.The classic train four-phase control strategy is improved for generating specific energy-efficient control schemes for each train.An improved brute force(BF)algorithm with a two-layer searching idea is designed to solve the optimisation model of energy-efficient train control schemes.Findings–Case studies on the actual metro line in Guangzhou,China verify the effectiveness of the proposed train control methods compared with four-phase control strategy under different kinds of train operation scenarios and calculation parameters.The verification on the computation efficiency as well as accuracy of the proposed algorithm indicates that it meets the requirement of online optimisation.Originality/value–Most existing studies optimised energy-efficient train timetable or train control strategies through an offline process,which has a defect in coping with the disturbance or delays effectively and promptly during real-time train operation.This paper studies an online optimisation of cooperative train control based on the rolling optimisation idea,where energy-efficient train operation can be realised once train running time is determined,thus mitigating the impact of unpredictable operation situations on the energy-saving performance of trains.
文摘Guangzhou and Foshan enjoy relatively mature metro network.However,some names of metro stations are over-transliterated in Pinyin.Such a translation method is used in translating general names,nouns of locality and some names of tourist destinations.With translation landscape and linguistic landscape theories,the reasons and impacts of over-transliteration in Guangzhou and Foshan metro will be discussed from the perspective of symbolic function.English names of Metro stations in other cities serve as a reference so as to appropriate solutions.
基金supported by Talents Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021RC228)Special Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021YJS103).
文摘Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.
基金supported by the National Natural Science Foundation of China(Grant No.U41702299).
文摘Purpose–This study purposes to study the influence of artificial freezing on the liquefaction characteristics of Nanjing sand,as well as its mechanism.Design/methodology/approach–was studied through dynamic triaxial tests by means of the GDS dynamic triaxial system on Nanjing sand extensively discovered in the middle and lower reaches of the Yangtze River under seismic load and metro train vibration load,respectively,and potential hazards of the two loads to the freezing construction of Nanjing sand were also identified in the tests.Findings–The results show that under both seismic load and metro train vibration load,freeze-thaw cycles will significantly reduce the stiffness and liquefaction resistance of Nanjing sand,especially in the first freezethaw cycle;the more freeze-thaw cycles,the worse structural behaviors of silty-fine sand,and the easier to liquefy;freeze-thaw cycles will increase the sensitivity of Nanjing sand’s dynamic pore pressure to dynamic load response;the lower the freezing temperature and the effective confining pressure,the worse the liquefaction resistance of Nanjing sand after freeze-thaw cycles;compared to the metro train vibration load,the seismic load in Nanjing is potentially less dangerous to freezing construction of Nanjing sand.Originality/value–The research results are helpful to the construction of the artificial ground freezing of the subway crossing passage in the lower reaches of the Yangtze River and to ensure the construction safety of the subway tunnel and its crossing passage.