CO2 emission levels of copper and zinc mines from which Japanese smelters import ore concentrates into Japan,were estimated by using a database called MLED. Eleven copper mines selected from data availability of mine ...CO2 emission levels of copper and zinc mines from which Japanese smelters import ore concentrates into Japan,were estimated by using a database called MLED. Eleven copper mines selected from data availability of mine site covered 84% of the total imported concentrates. Adding inventories of sea transportation and smelting processes to mine development process,total CO2 emission level for copper and zinc ingots produced in Japan were calculated. The results show that the emission share of mining and mineral processing processes for each mine is indicated around 30%-70% of total emission for ingots,which implies the importance of including the mining activities to the inventory of upper stream products.展开更多
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco...This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.展开更多
First the different anti-tank mines laying possibilities are shortly summarized: hand emplaced, with mine layers, ground or helicopter relatively topographical well defined, and with cluster systems of projectiles, ro...First the different anti-tank mines laying possibilities are shortly summarized: hand emplaced, with mine layers, ground or helicopter relatively topographical well defined, and with cluster systems of projectiles, rockets and aircraft dispensers. Then examples of the three generations of anti-tank mines are presented:Ⅰ generation: detonating only beneath the track; Ⅱ generation: detonating beneath the track and belly;Ⅲ generation: mines with off-route actions. Weight and cost comparisons are strongly favoring the off-route Ⅲ-generation mines.展开更多
According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its...According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development.展开更多
The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (...The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (UER) and multivariate linear regression (MLR) were used in this study. Loading equipment parameters such as bucket capacity, machine weight, engine power, boom length, digging depth, and dumping height were considered as variables. The results obtained by models and mean absolute error rate indicate that these models can be applied as the useful tool in determination of overhaul and maintenance cost of loading equipment. The results of this study can be used by the decision-makers for the specific surface mining operations.展开更多
文摘CO2 emission levels of copper and zinc mines from which Japanese smelters import ore concentrates into Japan,were estimated by using a database called MLED. Eleven copper mines selected from data availability of mine site covered 84% of the total imported concentrates. Adding inventories of sea transportation and smelting processes to mine development process,total CO2 emission level for copper and zinc ingots produced in Japan were calculated. The results show that the emission share of mining and mineral processing processes for each mine is indicated around 30%-70% of total emission for ingots,which implies the importance of including the mining activities to the inventory of upper stream products.
基金the Mine Planning Research Group–GIPLAMIN-of the Mines Faculty,National University of Colombia
文摘This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.
文摘First the different anti-tank mines laying possibilities are shortly summarized: hand emplaced, with mine layers, ground or helicopter relatively topographical well defined, and with cluster systems of projectiles, rockets and aircraft dispensers. Then examples of the three generations of anti-tank mines are presented:Ⅰ generation: detonating only beneath the track; Ⅱ generation: detonating beneath the track and belly;Ⅲ generation: mines with off-route actions. Weight and cost comparisons are strongly favoring the off-route Ⅲ-generation mines.
文摘According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development.
文摘The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (UER) and multivariate linear regression (MLR) were used in this study. Loading equipment parameters such as bucket capacity, machine weight, engine power, boom length, digging depth, and dumping height were considered as variables. The results obtained by models and mean absolute error rate indicate that these models can be applied as the useful tool in determination of overhaul and maintenance cost of loading equipment. The results of this study can be used by the decision-makers for the specific surface mining operations.