Being controlled by the gas content of the reservoir, the productivity of CBM well is also mainly determined by its engineering quality and the physical property of the reservoir. In Dafosi mine field, 22 vertical wel...Being controlled by the gas content of the reservoir, the productivity of CBM well is also mainly determined by its engineering quality and the physical property of the reservoir. In Dafosi mine field, 22 vertical wells from the “26 + 1” CBM wells project that was implemented since 2014 showed great difference in productivity after fracturing construction. With the consistent geological condition of coal reservoirs, fracturing construction parameters are suggested as the priority factor that controlling the well productivity. In this study, being combined with historical production and geological data, an optimized designation of fracturing construction parameters was established based on systematically comparative analysis of construction parameters such as discharge, the total volume of fracturing fluid, the quality of sand, sand ratio, which provides engineering basis for further fracturing construction of CBM wells.展开更多
A brief account of the development of the research on mining earthquakes and the general situation of the Mentougou Coal Mine medium scale experiment field for earthquake prediction and the project of monitor and p...A brief account of the development of the research on mining earthquakes and the general situation of the Mentougou Coal Mine medium scale experiment field for earthquake prediction and the project of monitor and prediction is given. The differences of waveforms between mining earthquakes and natural earthquakes is discussed. The magnitude frequency distribution of the 79 000 mining earthquakes of over M L1.0 from 1984 to 1995 is summarized . Finally, taking PH and PV, the principal compressive stress components of the focal mechanism of the mining earthquakes, as the criteria, analyses the stress background of the 12 large mining earthquakes.展开更多
Study on tectonic fractures based on the inversion of tectonic stress fields is an effective method. In this study, a geological model was set up based on geological data from the Hudi Coal Mine, Qinshui Basin, a mech...Study on tectonic fractures based on the inversion of tectonic stress fields is an effective method. In this study, a geological model was set up based on geological data from the Hudi Coal Mine, Qinshui Basin, a mechanical model was established under the condition of rock mechanics and geostress, and the finite element method was used to simulate the paleotectonic stress field. Based on the Griffith and Mohr-Coulomb criterion, the distribution of tectonic fractures in the Shanxi Formation during the Indosinian, Yanshanian, and Himalayan period can be predicted with the index of comprehensive rupture rate. The results show that the acting force of the Pacific Plate and the India Plate to the North China Plate formed the direction of principal stress is N-S, NW - SE, and NE - SW, respectively, in different periods in the study area. Changes in the direction and strength of the acting force led to the regional gradients of tectonic stress magnitude, which resulted in an asymmetrical distribution state of the stress conditions in different periods. It is suggested that the low-stress areas are mainly located in the fault zones and extend along the direction of the fault zones. Furthermore, the high-stress areas are located in the junction of fold belts and the binding site of multiple folds. The development of tectonic fractures was affected by the distribution of stress intensity and the tectonic position of folds and faults, which resulted in some developed areas with level I and II. There are obvious differences in the development of tectonic fractures in the fold and fault zones and the anticline and syncline structure at the same fold zones. The tectonic fractures of the Shanxi Formation during the Himalayan period are more developed than those during the Indosinian and Yanshanian period due to the superposition of the late tectonic movement to the early tectonic movement and the differences in the magnitude and direction of stress intensity.展开更多
文摘Being controlled by the gas content of the reservoir, the productivity of CBM well is also mainly determined by its engineering quality and the physical property of the reservoir. In Dafosi mine field, 22 vertical wells from the “26 + 1” CBM wells project that was implemented since 2014 showed great difference in productivity after fracturing construction. With the consistent geological condition of coal reservoirs, fracturing construction parameters are suggested as the priority factor that controlling the well productivity. In this study, being combined with historical production and geological data, an optimized designation of fracturing construction parameters was established based on systematically comparative analysis of construction parameters such as discharge, the total volume of fracturing fluid, the quality of sand, sand ratio, which provides engineering basis for further fracturing construction of CBM wells.
文摘A brief account of the development of the research on mining earthquakes and the general situation of the Mentougou Coal Mine medium scale experiment field for earthquake prediction and the project of monitor and prediction is given. The differences of waveforms between mining earthquakes and natural earthquakes is discussed. The magnitude frequency distribution of the 79 000 mining earthquakes of over M L1.0 from 1984 to 1995 is summarized . Finally, taking PH and PV, the principal compressive stress components of the focal mechanism of the mining earthquakes, as the criteria, analyses the stress background of the 12 large mining earthquakes.
基金financially supported by the National Natural Science Foundation of China (Nos.41402138, 41330635, and 41272154)Key Laboratory of Coal-based CO2 Capture and Geological Storage, Jiangsu Province (China University of Mining and Technology) (No.2016B04)
文摘Study on tectonic fractures based on the inversion of tectonic stress fields is an effective method. In this study, a geological model was set up based on geological data from the Hudi Coal Mine, Qinshui Basin, a mechanical model was established under the condition of rock mechanics and geostress, and the finite element method was used to simulate the paleotectonic stress field. Based on the Griffith and Mohr-Coulomb criterion, the distribution of tectonic fractures in the Shanxi Formation during the Indosinian, Yanshanian, and Himalayan period can be predicted with the index of comprehensive rupture rate. The results show that the acting force of the Pacific Plate and the India Plate to the North China Plate formed the direction of principal stress is N-S, NW - SE, and NE - SW, respectively, in different periods in the study area. Changes in the direction and strength of the acting force led to the regional gradients of tectonic stress magnitude, which resulted in an asymmetrical distribution state of the stress conditions in different periods. It is suggested that the low-stress areas are mainly located in the fault zones and extend along the direction of the fault zones. Furthermore, the high-stress areas are located in the junction of fold belts and the binding site of multiple folds. The development of tectonic fractures was affected by the distribution of stress intensity and the tectonic position of folds and faults, which resulted in some developed areas with level I and II. There are obvious differences in the development of tectonic fractures in the fold and fault zones and the anticline and syncline structure at the same fold zones. The tectonic fractures of the Shanxi Formation during the Himalayan period are more developed than those during the Indosinian and Yanshanian period due to the superposition of the late tectonic movement to the early tectonic movement and the differences in the magnitude and direction of stress intensity.