Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag o...Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag of Active Power Filter(APF) in compensating harmonic and reactive current, a novel method based on gray system theory was proposed to predict harmonic current and other distortion component. The mathematical model of component to be compensated was constructed by data sequence of distortion component, which could exactly forecast compensation signal of next period. The optimal control strategy was selected according to the principle of output signal approaching component to be compensated as near as possible. Before predicating each time the oldest data was eliminated while the latest data was added to data sequence. Then new predication model was established once again. The results show that the method can always construct mathematical model with variation of system parameters, reflect the latest state of system and not increase calculation quantity. The feasible and effective control strategy can improve power quality of coal mine power network.展开更多
结合某煤矿6 k V电网发生的越级跳闸事故,阐述了矿山电网保护配置的缺陷及越级跳闸的原因,利用仿真平台对事故现象进行还原仿真;然后结合煤矿电网线路较短以及井下电缆发生短路概率高等实际情况,给出防止越级跳闸的措施,基于PSCAD/EMTD...结合某煤矿6 k V电网发生的越级跳闸事故,阐述了矿山电网保护配置的缺陷及越级跳闸的原因,利用仿真平台对事故现象进行还原仿真;然后结合煤矿电网线路较短以及井下电缆发生短路概率高等实际情况,给出防止越级跳闸的措施,基于PSCAD/EMTDC搭建矿山电网越级跳闸仿真试验平台,并在该平台上仿真验证措施的有效性。该平台可使理论教学与实验教学有机结合,学生可在仿真平台上通过改变线路和保护参数观察矿山电网越级跳闸的现象,以及采取不同措施防止越级跳闸,既保证了学生对基本理论知识的理解,满足教学效果,又能为创新型、综合性实验的开设提供理想平台。展开更多
文摘Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag of Active Power Filter(APF) in compensating harmonic and reactive current, a novel method based on gray system theory was proposed to predict harmonic current and other distortion component. The mathematical model of component to be compensated was constructed by data sequence of distortion component, which could exactly forecast compensation signal of next period. The optimal control strategy was selected according to the principle of output signal approaching component to be compensated as near as possible. Before predicating each time the oldest data was eliminated while the latest data was added to data sequence. Then new predication model was established once again. The results show that the method can always construct mathematical model with variation of system parameters, reflect the latest state of system and not increase calculation quantity. The feasible and effective control strategy can improve power quality of coal mine power network.
文摘结合某煤矿6 k V电网发生的越级跳闸事故,阐述了矿山电网保护配置的缺陷及越级跳闸的原因,利用仿真平台对事故现象进行还原仿真;然后结合煤矿电网线路较短以及井下电缆发生短路概率高等实际情况,给出防止越级跳闸的措施,基于PSCAD/EMTDC搭建矿山电网越级跳闸仿真试验平台,并在该平台上仿真验证措施的有效性。该平台可使理论教学与实验教学有机结合,学生可在仿真平台上通过改变线路和保护参数观察矿山电网越级跳闸的现象,以及采取不同措施防止越级跳闸,既保证了学生对基本理论知识的理解,满足教学效果,又能为创新型、综合性实验的开设提供理想平台。