The study focuses on the stability control measures for mining roadways in fault zones of deep mines,using Daqiang Coal Mine as a case study.The control system under consideration,referred to as"pre-splitting cut...The study focuses on the stability control measures for mining roadways in fault zones of deep mines,using Daqiang Coal Mine as a case study.The control system under consideration,referred to as"pre-splitting cutting roof+NPR anchor cable"(PSCR-NPR),is subjected to scrutiny through theoretical analysis,numerical modelling,and field trials.Furthermore,a comprehensive analysis is undertaken to evaluate the stability control mechanism of this particular technology.The study provides evidence that the utilization of deep-hole directional energy-concentrated blasting facilitates the attainment of directional roof cutting in roadways.The aforementioned procedure leads to the formation of a uniform structural surface on the roof of the roadway and causes modifications in the surrounding geological formation.The examination of the lateral abutment pressure and shear stress distribution,both prior to and subsequent to roof cutting,indicates that the implementation of pre-splitting techniques leads to a noteworthy reduction in pressure.The proposition of incorporating the safety factor Q for roof cutting height is suggested as a method to augment comprehension of the pressure relief phenomenon in the field of engineering.The analysis of numerical simulation has indicated that the optimal pressure relief effect of a mining roadway in a fault area is attained when the value of Q is 1.8.The NPR anchor cable exhibits noteworthy characteristics,including a high level of prestress,continuous resistance,and substantial deformation.After the excavation of the roadway,a notable reduction in radial stress occurs,leading to the reinstatement of the three-phase stress state in the surrounding rock.This restoration is attributed to the substantial prestress exerted on the radial stress.The termination point of the NPR anchor cable is strategically positioned within a stable rock formation,allowing for the utilization of the mechanical characteristics of the deep stable rock mass.This positioning serves to improve the load-bearing capacity of the surrounding rock.The mining roadway within the fault region of Daqiang Coal Mine is outfitted with the PSCR-NPR technology.The drop in shear stress experienced by the rock surrounding the roadway is estimated to be around 30%,whilst the low-stress region of the mining roadway extends by a factor of approximately 5.5.The magnitude of surface displacement convergence experiences a decrease of approximately 45%-50%.The study’s findings provide useful insights regarding the stable of mining roadway in characterized by fault zones.展开更多
The angle α between the fault strike and the axial direction of the roadway produces different damage characteristics. In this paper, the research methodology includes theoretical analyses, numerical simulations and ...The angle α between the fault strike and the axial direction of the roadway produces different damage characteristics. In this paper, the research methodology includes theoretical analyses, numerical simulations and field experiments in the context of the Daqiang coal mine located in Shenyang, China. The stability control countermeasure of "pre-splitting cutting roof + NPR anchor cable"(PSCR-NPR) is simultaneously proposed. According to the different deformation characteristics of the roadway, the faults are innovatively classified into three types, with α of type I being 0°-30°, α of type II being 30°-60°, and α of type III being 60°-90°. The full-cycle stress evolution paths during mining roadway traverses across different types of faults are investigated by numerical simulation. Different pinch angles α lead to high stress concentration areas at different locations in the surrounding rock. The non-uniform stress field formed in the shallow surrounding rock is an important reason for the instability of the roadway. The pre-cracked cut top shifted the high stress region to the deep rock mass and formed a low stress region in the shallow rock mass. The high prestressing NPR anchor cable transforms the non-uniform stress field of the shallow surrounding rock into a uniform stress field. PSCR-NPR is applied in the fault-through roadway of Daqiang mine. The low stress area of the surrounding rock was enlarged by 3-7 times, and the cumulative convergence was reduced by 45%-50%. It provides a reference for the stability control of the deep fault-through mining roadway.展开更多
Automatic roadway formation by roof cutting is a sustainable nonpillar mining method that has the potential to increase coal recovery,reduce roadway excavation and improve mining safety.In this method,roof cutting is ...Automatic roadway formation by roof cutting is a sustainable nonpillar mining method that has the potential to increase coal recovery,reduce roadway excavation and improve mining safety.In this method,roof cutting is the key process for stress relief,which significantly affects the stability of the formed roadway.This paper presents a directionally single cracking(DSC)technique for roof cutting with considerations of rock properties.The mechanism of the DSC technique was investi-gated by explicit finite element analyses.The DSC technique and roof cutting parameters were evaluated by discrete element simulation and field experiment.On this basis,the optimized DSC technique was tested in the field.The results indicate that the DSC technique could effectively control the blast-induced stress distribution and crack propagation in the roof rock,thus,achieve directionally single cracking on the roadway roof.The DsC technique for roof cutting with optimized parameters could effectively reduce the deformation and improve the stability of the formed roadway.Field engineering application verified the feasibility and effectiveness of the evaluated DSC technique for roof cutting.展开更多
Surrounding rock control in the overlying protective coal seam is a challenging topic for de-stressed mining of multi-seamed coal.Current research findings on roadway control were used in the design of a physical mode...Surrounding rock control in the overlying protective coal seam is a challenging topic for de-stressed mining of multi-seamed coal.Current research findings on roadway control were used in the design of a physical model of a complex textured roof having a varying thickness.The model was used to study roadway instability and collapse caused by dynamic pressure.The results show that when the thickness of the roof exceeds the bolted depth the roadway security is least and the roof has the greatest possibility for collapse.Numerical simulations were also carried out to study stress redistribution before and after roadway excavation during underlying protective seam mining.The evolution of roadway displacement and fracture,as affected by support methods,has been well studied.A series of support principles and technologies for mining affected roadways has been proposed after demonstration of successful practical application in the Huainan Mines.These principles and technologies are of extended value to deep coal mining support in China.展开更多
The rockburst dynamic disasters in the process of deep coal mining become more and more serious.Taking the rockburst occurred in the 23130 working face of Yuejin Coal Mine as the engineering background,we study the ch...The rockburst dynamic disasters in the process of deep coal mining become more and more serious.Taking the rockburst occurred in the 23130 working face of Yuejin Coal Mine as the engineering background,we study the characteristics of mining stress feld around roadway,the plastic failure morphological characteristics of surrounding rock and the accumulation/release law of elastic energy before and after burst.An analysis model quantitatively describing the physical process of rockburst in the mining roadway is established,and the calculation method of dynamic release of elastic energy in the physical process of rockburst is educed.The mechanism of rockburst in mining roadway is revealed.The results show that an“L-shaped”stress concentration zone is formed within 100 m of the 23130 working face,and the principal stress ratio of the surrounding rock of the transportation roadway is 2.59–4.26.The change of the direction of the maximum principal stress has a signifcant efect on the burst appearance characteristics.The failure strength of diferent sections of the mining roadway is characterized by the elastic energy release value.With the increase of the working face distance,the elastic energy released by burst failure and the expansion variation of failure boundary radius show a nonlinear variation law that tends to decrease steadily after sharp fuctuation.The closer to the working face,the higher the burst risk.At a distance of 10 m from the working surface,the maximum principal stress reaches its maximum value.The butterfy-shaped failure system generated by the surrounding rock of the roadway has energy self-sustainability,and the elastic energy released by the sudden expansion of the butterfy leaf is enough to cause a burst damage of 1.9 magnitude.This work could provide theoretical support for the prediction and prevention of rockburst.展开更多
In the traditional mining technology,the coal resources trapped beneath surface buildings,railways,and water bodies cannot be mined massively,thereby causing the lower coal recovery and dynamic disasters.In order to s...In the traditional mining technology,the coal resources trapped beneath surface buildings,railways,and water bodies cannot be mined massively,thereby causing the lower coal recovery and dynamic disasters.In order to solve the aforementioned problems,the roadway backfilling mining technology is developed and the joint bearing mechanism of coal pillar and backfilling body is presented in this paper.The mechanical model of bearing system of coal pillar and backfilling body is established,by analyzing the basic characteristics of overlying strata deformation in roadway backfilling mining technology.According to the Ritz method in energy variation principle,the elastic solution expression of coal pillar deformation is deduced in roadway backfilling mining technology.Based on elastic-viscoelastic correspondence principle,combining with the burgers rheological constitutive model and Laplace transform theory,the viscoelastic solution expression of coal pillar deformation is obtained in roadway backfilling mining technology.By analyzing the compressive mechanical property of backfilling body,the time formula required for coal pillar and backfilling body to play the joint bearing function in roadway backfilling mining technology is obtained.The example analysis indicates that the time is 140 days.The results can be treated as an important basis for theoretical research and process design in roadway backfilling mining technology.展开更多
A study of the deformation of the surrounding rock and coal pillars near a fault under the influence of mining is conducted on a physical model for the design of coal pillars to support and maintain the roofs of adjac...A study of the deformation of the surrounding rock and coal pillars near a fault under the influence of mining is conducted on a physical model for the design of coal pillars to support and maintain the roofs of adjacent fault roadways.This research is based on the 15101 mining face in the Baiyangling Coal Mine,Shanxi,China,and uses simulation tests similar to digital speckle test technology to analyse the displacement,strain and vertical stress fields of surrounding rocks near faults to determine the influence of the coal pillar width.The results are as follows.The surrounding rock of the roadway roof fails to form a balance hinge for the massive rock mass.The vertical displacement,vertical strain and other deformation of the surrounding rock near the fault increase steeply as the coal pillar width decreases.The steep increase in deformation corresponds to a coal pillar width of 10 m.When the coal pillar width is 7.5 m,the pressure on the surrounding rock near the footwall of the fault suddenly increases,while the pressure on the hanging wall near the fault increases by only 0.35 MPa.The stress of the rock mass of the hanging wall is not completely shielded by the fault,and part of the load disturbance is still transmitted to the hanging wall via friction.The width of the fault coal pillars at the 15101 working face is determined to be 7.5 m,and the monitoring data verify the rationality of the fault coal pillars.展开更多
This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the str...This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the strata disturbance scope, the strata displacement angle was used to calculate the protection pillar width. A numerical model was built considering the field geological conditions. In simulation, the mining stress borderline was defined as the contour where the induced stress is 1.5 times of the original stress. Simulation results show the mining stress borderline of the lateral roadway extended 91.7 m outward after repeated mining. Then the original stress increased, deforming the road- way of interest. This deformation agreed with the in situ observations. Moreover, the strata displacement angle changed due to repeated mining. Therefore, reselection of the displacement angle was required to design the protective pillar width. Since a constant strata displacement angle was used in traditional design, the orooosed method was beneficial in field cases.展开更多
Based on the investigation and statistics of logs of 211 bole holes and strata data from 79 roadways in 13 coal mines located in Xishan, Jincheng, Lu’an, Fenxi, and Huozhou in China, the roadways’ roof structures we...Based on the investigation and statistics of logs of 211 bole holes and strata data from 79 roadways in 13 coal mines located in Xishan, Jincheng, Lu’an, Fenxi, and Huozhou in China, the roadways’ roof structures were classified as multi-thin-layer, thin-thick combined layer, integrated thick layer, thick-coal layer, and cracked layer according to the geometric features and spatial strength distribution of surrounding rock. Then eight sub-categories were defined as different situations. And seven simulation modeling tests were carried out. The strata structures of these models were different from each other. At last, the relationship between roof structure and its failure pattern was discussed.展开更多
基金funded by the National Natural Science Foundation of China(52174096,42277174)the Fundamental Research Funds for the Central Universities(2022YJSSB03)the Scientific and Technological Projects of Henan Province(232102320238)。
文摘The study focuses on the stability control measures for mining roadways in fault zones of deep mines,using Daqiang Coal Mine as a case study.The control system under consideration,referred to as"pre-splitting cutting roof+NPR anchor cable"(PSCR-NPR),is subjected to scrutiny through theoretical analysis,numerical modelling,and field trials.Furthermore,a comprehensive analysis is undertaken to evaluate the stability control mechanism of this particular technology.The study provides evidence that the utilization of deep-hole directional energy-concentrated blasting facilitates the attainment of directional roof cutting in roadways.The aforementioned procedure leads to the formation of a uniform structural surface on the roof of the roadway and causes modifications in the surrounding geological formation.The examination of the lateral abutment pressure and shear stress distribution,both prior to and subsequent to roof cutting,indicates that the implementation of pre-splitting techniques leads to a noteworthy reduction in pressure.The proposition of incorporating the safety factor Q for roof cutting height is suggested as a method to augment comprehension of the pressure relief phenomenon in the field of engineering.The analysis of numerical simulation has indicated that the optimal pressure relief effect of a mining roadway in a fault area is attained when the value of Q is 1.8.The NPR anchor cable exhibits noteworthy characteristics,including a high level of prestress,continuous resistance,and substantial deformation.After the excavation of the roadway,a notable reduction in radial stress occurs,leading to the reinstatement of the three-phase stress state in the surrounding rock.This restoration is attributed to the substantial prestress exerted on the radial stress.The termination point of the NPR anchor cable is strategically positioned within a stable rock formation,allowing for the utilization of the mechanical characteristics of the deep stable rock mass.This positioning serves to improve the load-bearing capacity of the surrounding rock.The mining roadway within the fault region of Daqiang Coal Mine is outfitted with the PSCR-NPR technology.The drop in shear stress experienced by the rock surrounding the roadway is estimated to be around 30%,whilst the low-stress region of the mining roadway extends by a factor of approximately 5.5.The magnitude of surface displacement convergence experiences a decrease of approximately 45%-50%.The study’s findings provide useful insights regarding the stable of mining roadway in characterized by fault zones.
基金funded by the National Natural Science Foundation of China (52174096, 52304110)the Fundamental Research Funds for the Central Universities (2022YJSSB03)the Scientific and Technological Projects of Henan Province (232102320238)。
文摘The angle α between the fault strike and the axial direction of the roadway produces different damage characteristics. In this paper, the research methodology includes theoretical analyses, numerical simulations and field experiments in the context of the Daqiang coal mine located in Shenyang, China. The stability control countermeasure of "pre-splitting cutting roof + NPR anchor cable"(PSCR-NPR) is simultaneously proposed. According to the different deformation characteristics of the roadway, the faults are innovatively classified into three types, with α of type I being 0°-30°, α of type II being 30°-60°, and α of type III being 60°-90°. The full-cycle stress evolution paths during mining roadway traverses across different types of faults are investigated by numerical simulation. Different pinch angles α lead to high stress concentration areas at different locations in the surrounding rock. The non-uniform stress field formed in the shallow surrounding rock is an important reason for the instability of the roadway. The pre-cracked cut top shifted the high stress region to the deep rock mass and formed a low stress region in the shallow rock mass. The high prestressing NPR anchor cable transforms the non-uniform stress field of the shallow surrounding rock into a uniform stress field. PSCR-NPR is applied in the fault-through roadway of Daqiang mine. The low stress area of the surrounding rock was enlarged by 3-7 times, and the cumulative convergence was reduced by 45%-50%. It provides a reference for the stability control of the deep fault-through mining roadway.
基金supported by the National Natural Science Foundation of China(52204164)Fundamental Research Funds for the Central Universities(2022XJSB03)Young Elite Scientists Sponsorship Program by CAST(2021QNRC001),which are gratefully acknowledged.
文摘Automatic roadway formation by roof cutting is a sustainable nonpillar mining method that has the potential to increase coal recovery,reduce roadway excavation and improve mining safety.In this method,roof cutting is the key process for stress relief,which significantly affects the stability of the formed roadway.This paper presents a directionally single cracking(DSC)technique for roof cutting with considerations of rock properties.The mechanism of the DSC technique was investi-gated by explicit finite element analyses.The DSC technique and roof cutting parameters were evaluated by discrete element simulation and field experiment.On this basis,the optimized DSC technique was tested in the field.The results indicate that the DSC technique could effectively control the blast-induced stress distribution and crack propagation in the roof rock,thus,achieve directionally single cracking on the roadway roof.The DsC technique for roof cutting with optimized parameters could effectively reduce the deformation and improve the stability of the formed roadway.Field engineering application verified the feasibility and effectiveness of the evaluated DSC technique for roof cutting.
基金Financial support for this work,provided by the National Key Technology R&D Program(No.2007BAK28B00)the National Natural Science Foundation for the Youth of China(No.50904064)+2 种基金the Research Fund for the Youth of China University of Mining & Technology(No.2008A004)the State Key Laboratory of Coal Resources and Safe Mining,CUMT(No.SKLCRSM09X03)the Research Fund of the State Key Laboratory of Coal Resources and Mine Safety,CUMT(No.08KF10)
文摘Surrounding rock control in the overlying protective coal seam is a challenging topic for de-stressed mining of multi-seamed coal.Current research findings on roadway control were used in the design of a physical model of a complex textured roof having a varying thickness.The model was used to study roadway instability and collapse caused by dynamic pressure.The results show that when the thickness of the roof exceeds the bolted depth the roadway security is least and the roof has the greatest possibility for collapse.Numerical simulations were also carried out to study stress redistribution before and after roadway excavation during underlying protective seam mining.The evolution of roadway displacement and fracture,as affected by support methods,has been well studied.A series of support principles and technologies for mining affected roadways has been proposed after demonstration of successful practical application in the Huainan Mines.These principles and technologies are of extended value to deep coal mining support in China.
基金supported by the National Natural Science Foundation of China(52004291,52130409,51874314)the Research Fund of State and Local Joint Engineering Laboratory for Gas Drainage&Ground Control of Deep Mines(Henan Polytechnic University)(SJF202003)+1 种基金the Fundamental Research Funds for the Central Universities(2022XJAQ02)the Innovative Training Program for College Students(C202112035,C202112003).
文摘The rockburst dynamic disasters in the process of deep coal mining become more and more serious.Taking the rockburst occurred in the 23130 working face of Yuejin Coal Mine as the engineering background,we study the characteristics of mining stress feld around roadway,the plastic failure morphological characteristics of surrounding rock and the accumulation/release law of elastic energy before and after burst.An analysis model quantitatively describing the physical process of rockburst in the mining roadway is established,and the calculation method of dynamic release of elastic energy in the physical process of rockburst is educed.The mechanism of rockburst in mining roadway is revealed.The results show that an“L-shaped”stress concentration zone is formed within 100 m of the 23130 working face,and the principal stress ratio of the surrounding rock of the transportation roadway is 2.59–4.26.The change of the direction of the maximum principal stress has a signifcant efect on the burst appearance characteristics.The failure strength of diferent sections of the mining roadway is characterized by the elastic energy release value.With the increase of the working face distance,the elastic energy released by burst failure and the expansion variation of failure boundary radius show a nonlinear variation law that tends to decrease steadily after sharp fuctuation.The closer to the working face,the higher the burst risk.At a distance of 10 m from the working surface,the maximum principal stress reaches its maximum value.The butterfy-shaped failure system generated by the surrounding rock of the roadway has energy self-sustainability,and the elastic energy released by the sudden expansion of the butterfy leaf is enough to cause a burst damage of 1.9 magnitude.This work could provide theoretical support for the prediction and prevention of rockburst.
基金This work was supported by the National Natural Science Foundation of China(51504081,51774110,51508166,U1404527)the Science and Technology Breakthrough Project by Henan Province(162102210221,162102310427)+1 种基金the Foundation for Higher Education Key Research Project by Henan Province(15A440013)the Ph.D.Programs Foundation of Henan Polytechnic University(B2018-65,B2018-4,B2016-67).
文摘In the traditional mining technology,the coal resources trapped beneath surface buildings,railways,and water bodies cannot be mined massively,thereby causing the lower coal recovery and dynamic disasters.In order to solve the aforementioned problems,the roadway backfilling mining technology is developed and the joint bearing mechanism of coal pillar and backfilling body is presented in this paper.The mechanical model of bearing system of coal pillar and backfilling body is established,by analyzing the basic characteristics of overlying strata deformation in roadway backfilling mining technology.According to the Ritz method in energy variation principle,the elastic solution expression of coal pillar deformation is deduced in roadway backfilling mining technology.Based on elastic-viscoelastic correspondence principle,combining with the burgers rheological constitutive model and Laplace transform theory,the viscoelastic solution expression of coal pillar deformation is obtained in roadway backfilling mining technology.By analyzing the compressive mechanical property of backfilling body,the time formula required for coal pillar and backfilling body to play the joint bearing function in roadway backfilling mining technology is obtained.The example analysis indicates that the time is 140 days.The results can be treated as an important basis for theoretical research and process design in roadway backfilling mining technology.
基金The authors acknowledge the support of the China National Key R&D Program Project(2017YFC1503102)the National Natural Science Foundation of China(No.51704143)the Natural Science Foundation of Liaoning Province of China(2020-MS-302).
文摘A study of the deformation of the surrounding rock and coal pillars near a fault under the influence of mining is conducted on a physical model for the design of coal pillars to support and maintain the roofs of adjacent fault roadways.This research is based on the 15101 mining face in the Baiyangling Coal Mine,Shanxi,China,and uses simulation tests similar to digital speckle test technology to analyse the displacement,strain and vertical stress fields of surrounding rocks near faults to determine the influence of the coal pillar width.The results are as follows.The surrounding rock of the roadway roof fails to form a balance hinge for the massive rock mass.The vertical displacement,vertical strain and other deformation of the surrounding rock near the fault increase steeply as the coal pillar width decreases.The steep increase in deformation corresponds to a coal pillar width of 10 m.When the coal pillar width is 7.5 m,the pressure on the surrounding rock near the footwall of the fault suddenly increases,while the pressure on the hanging wall near the fault increases by only 0.35 MPa.The stress of the rock mass of the hanging wall is not completely shielded by the fault,and part of the load disturbance is still transmitted to the hanging wall via friction.The width of the fault coal pillars at the 15101 working face is determined to be 7.5 m,and the monitoring data verify the rationality of the fault coal pillars.
基金Financial supports from the National Natural Science Foundation of China (No. 51204160)the Priority Academic Program Development of Jiangsu Higher Education Institutions of China(No.SZBF2011-6-B35)+1 种基金the National Science and Technology Support Program of China(No.2012BAK04B06)the Project Funded by State Key Laboratory of Coal Resources and Safe Mining of China(No.SKLCRSM11X03)
文摘This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the strata disturbance scope, the strata displacement angle was used to calculate the protection pillar width. A numerical model was built considering the field geological conditions. In simulation, the mining stress borderline was defined as the contour where the induced stress is 1.5 times of the original stress. Simulation results show the mining stress borderline of the lateral roadway extended 91.7 m outward after repeated mining. Then the original stress increased, deforming the road- way of interest. This deformation agreed with the in situ observations. Moreover, the strata displacement angle changed due to repeated mining. Therefore, reselection of the displacement angle was required to design the protective pillar width. Since a constant strata displacement angle was used in traditional design, the orooosed method was beneficial in field cases.
基金Youth Natural Science Foundation of Shanxi prov.( 2 0 0 2 10 2 1)
文摘Based on the investigation and statistics of logs of 211 bole holes and strata data from 79 roadways in 13 coal mines located in Xishan, Jincheng, Lu’an, Fenxi, and Huozhou in China, the roadways’ roof structures were classified as multi-thin-layer, thin-thick combined layer, integrated thick layer, thick-coal layer, and cracked layer according to the geometric features and spatial strength distribution of surrounding rock. Then eight sub-categories were defined as different situations. And seven simulation modeling tests were carried out. The strata structures of these models were different from each other. At last, the relationship between roof structure and its failure pattern was discussed.