Ghanaian construction projects encounter a number of challenges, including low health, safety, and environmental requirements, poor performance, and time and cost overruns. To provide value for money (VFM) on governme...Ghanaian construction projects encounter a number of challenges, including low health, safety, and environmental requirements, poor performance, and time and cost overruns. To provide value for money (VFM) on government infrastructure projects in Ghana, this research assesses the roles of project consultants, specifically architects and quantity surveyors, and highlights important obstacles. A cross-sectional survey design involving architects and quantity surveyors yielded a 96% response rate after 100 questionnaires were distributed. Consultants’ responsibilities also include monitoring standards compliance, providing advice on delays, controlling budgets, and advising on project completion dates. Difficulties encompass a lack of promptness in decision-making, unethical conduct, political pressure, and inadequate focus on contract administration and construction audits. Project urgency, longevity, political clout, timely decision-making, and team experience are important variables that impact VFM. Policy makers and construction management practitioners should take note of the implications for Ghana’s public infrastructure projects.展开更多
Background:Delivering Reproductive Health Results(DRHR)programme used social franchising(SF)and social marketing(SM)approaches to increase the supply of high quality family planning services in underserved areas of Pa...Background:Delivering Reproductive Health Results(DRHR)programme used social franchising(SF)and social marketing(SM)approaches to increase the supply of high quality family planning services in underserved areas of Pakistan.We assessed the costs,cost-efficiency and cost-effectiveness of DRHR to understand the value for money of these approaches.Methods:Financial and economic programme costs were calculated.Costs to individual users were captured in a pre-post survey.The cost per couple years of protection(CYP)and cost per new user were estimated as indicators of cost efficiency.For the cost-effectiveness analysis we estimated the cost per clinical outcome averted and the cost per disability-adjusted life year(DALY)averted.Results:Approximately£20 million were spent through the DRHR programme between July 2012 and September 2015 on commodities and services representing nearly four million CYPs.Based on programme data,the cumulative cost-efficiency of the entire DRHR programme was£4.8 per CYP.DRHR activities would avert one DALY at the cost of£20.Financial access indicators generally improved in programme areas,but the magnitude of progress varies across indicators.Conclusions:The SF and SM approaches adopted in DRHR appear to be cost effective relative to comparable reproductive health programmes.This paper adds to the limited evidence on the cost-effectiveness of different models of reproductive health care provision in low-and middle-income settings.Further studies are needed to nuance the understanding of the determinants of impact and value for money of SF and SM.展开更多
In recent years, private sectors are encouraged to take an active part in franchising of urban infrastructure investments and operations, which promotes the rapid development of public-private partnership(PPP)in infra...In recent years, private sectors are encouraged to take an active part in franchising of urban infrastructure investments and operations, which promotes the rapid development of public-private partnership(PPP)in infrastructure and public service supply. Value for money(VFM) assessment has been officially proposed to provide a reference for selection of projects planning to adopt PPP. Based on the bottlenecks of VFM application in China and the uncertainties for urban infrastructure PPP projects, a discounted cash flow(DCF) model is established for VFM of infrastructure PPP projects. Then, a Monte Carlo simulation model is established on the basis of uncertainty factors for VFM. Through the analysis of Huai'an trams PPP project, coping strategies of uncertainties for VFM are put forward. Findings of the research may propel the establishment of a complete VFM evaluation system for PPP projects. Key instructional functions of VFM during the process of decision-making can be brought into full play and PPP may develop orderly.展开更多
Due to bounded rationality, people often rush for instantaneous gratification if the decisions involve immediate rewards, but procrastinate if the decisions involve immediate costs. Present-biased preference and time-...Due to bounded rationality, people often rush for instantaneous gratification if the decisions involve immediate rewards, but procrastinate if the decisions involve immediate costs. Present-biased preference and time-inconsistency will be more salient when people are making inter-temporal decisions to trade off rewards and costs in the future. People outweigh the present and their preference for the outcome in the furore will decline over time. Incorporating present-biased preference and time-inconsistency under quasi-hyperbolic discounting, time value of money under inflation and time-varying demand with shortages completely backlogged, we develop an inventory replenishment model for a deteriorating item. Inventory replenishment policies that benefit the decision maker are as follows. With the increase of time-inconsistency, one can increase ordering number and decrease fraction of shortages; with the increase of hazard rate within an upper limit, one can increase ordering number and decrease fraction of shortage; with the increase of compounded discount rate, one can increase ordering number and fraction of shortage. Hyperbolic discounting increases the ordering number and decreases the final profit, and the degree of hyperbolic discounting strengthens such outcomes. As a result, the optimal policy for a decision maker is to keep as rational as possible when making inter-temporal decisions.展开更多
Given the European Public Procurement Directive 2014/24/EU,policymakers have ordered the inclusion of various criteria,such as the price,life-cycle costs,environmental,and social aspects,in the evaluation of tenders f...Given the European Public Procurement Directive 2014/24/EU,policymakers have ordered the inclusion of various criteria,such as the price,life-cycle costs,environmental,and social aspects,in the evaluation of tenders for public construction projects.Consequently,the relevance of non-monetary award criteria has gained significant value.However,the established evaluation formulas,which are used to obtain the best value for money procurement,have resulted in legal disputes.The existing evaluation formulas exhibit mathematical weaknesses,wherein scoring indices do not express economic efficiency adequately.Thus,a conflict is observed between the political requirement of non-monetary award criteria and their evaluation by contracting authorities.To overcome such dilemma,an extensive literature review is conducted.Specifically,this study explores the essential problems of existing evaluation formulas and develops a more reliable method.The technique from the field of efficiency analysis,i.e.,Data Envelopment Analysis(DEA),is adopted in this study.For contract awarding,the DEA is extended by introducing a decision theoretical framework.For public procurement,the proposed method combines two advantages.First,the proposed method ensures the derivation of a robust tender ranking given that with respect to clients’preferences,irrelevant and insufficiently tailored tenders do not influence the scoring.Second,the proposed method supports the intention of policy makers to promote public goals,such as sustainable aspects.By disclosing the strengths and weaknesses of bidders with respect to their competitors,all bidders can obtain a precise overview of their performance regarding the award criteria.In sum,the proposed method allows a targeted improvement of certain criteria values in future tenders and consequently leads to an enhancement of public goals.展开更多
文摘Ghanaian construction projects encounter a number of challenges, including low health, safety, and environmental requirements, poor performance, and time and cost overruns. To provide value for money (VFM) on government infrastructure projects in Ghana, this research assesses the roles of project consultants, specifically architects and quantity surveyors, and highlights important obstacles. A cross-sectional survey design involving architects and quantity surveyors yielded a 96% response rate after 100 questionnaires were distributed. Consultants’ responsibilities also include monitoring standards compliance, providing advice on delays, controlling budgets, and advising on project completion dates. Difficulties encompass a lack of promptness in decision-making, unethical conduct, political pressure, and inadequate focus on contract administration and construction audits. Project urgency, longevity, political clout, timely decision-making, and team experience are important variables that impact VFM. Policy makers and construction management practitioners should take note of the implications for Ghana’s public infrastructure projects.
文摘Background:Delivering Reproductive Health Results(DRHR)programme used social franchising(SF)and social marketing(SM)approaches to increase the supply of high quality family planning services in underserved areas of Pakistan.We assessed the costs,cost-efficiency and cost-effectiveness of DRHR to understand the value for money of these approaches.Methods:Financial and economic programme costs were calculated.Costs to individual users were captured in a pre-post survey.The cost per couple years of protection(CYP)and cost per new user were estimated as indicators of cost efficiency.For the cost-effectiveness analysis we estimated the cost per clinical outcome averted and the cost per disability-adjusted life year(DALY)averted.Results:Approximately£20 million were spent through the DRHR programme between July 2012 and September 2015 on commodities and services representing nearly four million CYPs.Based on programme data,the cumulative cost-efficiency of the entire DRHR programme was£4.8 per CYP.DRHR activities would avert one DALY at the cost of£20.Financial access indicators generally improved in programme areas,but the magnitude of progress varies across indicators.Conclusions:The SF and SM approaches adopted in DRHR appear to be cost effective relative to comparable reproductive health programmes.This paper adds to the limited evidence on the cost-effectiveness of different models of reproductive health care provision in low-and middle-income settings.Further studies are needed to nuance the understanding of the determinants of impact and value for money of SF and SM.
基金the Research Project of China Institute of Urban Governance of SJTU(No.16JCCS09)
文摘In recent years, private sectors are encouraged to take an active part in franchising of urban infrastructure investments and operations, which promotes the rapid development of public-private partnership(PPP)in infrastructure and public service supply. Value for money(VFM) assessment has been officially proposed to provide a reference for selection of projects planning to adopt PPP. Based on the bottlenecks of VFM application in China and the uncertainties for urban infrastructure PPP projects, a discounted cash flow(DCF) model is established for VFM of infrastructure PPP projects. Then, a Monte Carlo simulation model is established on the basis of uncertainty factors for VFM. Through the analysis of Huai'an trams PPP project, coping strategies of uncertainties for VFM are put forward. Findings of the research may propel the establishment of a complete VFM evaluation system for PPP projects. Key instructional functions of VFM during the process of decision-making can be brought into full play and PPP may develop orderly.
文摘Due to bounded rationality, people often rush for instantaneous gratification if the decisions involve immediate rewards, but procrastinate if the decisions involve immediate costs. Present-biased preference and time-inconsistency will be more salient when people are making inter-temporal decisions to trade off rewards and costs in the future. People outweigh the present and their preference for the outcome in the furore will decline over time. Incorporating present-biased preference and time-inconsistency under quasi-hyperbolic discounting, time value of money under inflation and time-varying demand with shortages completely backlogged, we develop an inventory replenishment model for a deteriorating item. Inventory replenishment policies that benefit the decision maker are as follows. With the increase of time-inconsistency, one can increase ordering number and decrease fraction of shortages; with the increase of hazard rate within an upper limit, one can increase ordering number and decrease fraction of shortage; with the increase of compounded discount rate, one can increase ordering number and fraction of shortage. Hyperbolic discounting increases the ordering number and decreases the final profit, and the degree of hyperbolic discounting strengthens such outcomes. As a result, the optimal policy for a decision maker is to keep as rational as possible when making inter-temporal decisions.
文摘Given the European Public Procurement Directive 2014/24/EU,policymakers have ordered the inclusion of various criteria,such as the price,life-cycle costs,environmental,and social aspects,in the evaluation of tenders for public construction projects.Consequently,the relevance of non-monetary award criteria has gained significant value.However,the established evaluation formulas,which are used to obtain the best value for money procurement,have resulted in legal disputes.The existing evaluation formulas exhibit mathematical weaknesses,wherein scoring indices do not express economic efficiency adequately.Thus,a conflict is observed between the political requirement of non-monetary award criteria and their evaluation by contracting authorities.To overcome such dilemma,an extensive literature review is conducted.Specifically,this study explores the essential problems of existing evaluation formulas and develops a more reliable method.The technique from the field of efficiency analysis,i.e.,Data Envelopment Analysis(DEA),is adopted in this study.For contract awarding,the DEA is extended by introducing a decision theoretical framework.For public procurement,the proposed method combines two advantages.First,the proposed method ensures the derivation of a robust tender ranking given that with respect to clients’preferences,irrelevant and insufficiently tailored tenders do not influence the scoring.Second,the proposed method supports the intention of policy makers to promote public goals,such as sustainable aspects.By disclosing the strengths and weaknesses of bidders with respect to their competitors,all bidders can obtain a precise overview of their performance regarding the award criteria.In sum,the proposed method allows a targeted improvement of certain criteria values in future tenders and consequently leads to an enhancement of public goals.