The developments of multi-core systems(MCS)have considerably improved the existing technologies in thefield of computer architecture.The MCS comprises several processors that are heterogeneous for resource capacities,...The developments of multi-core systems(MCS)have considerably improved the existing technologies in thefield of computer architecture.The MCS comprises several processors that are heterogeneous for resource capacities,working environments,topologies,and so on.The existing multi-core technology unlocks additional research opportunities for energy minimization by the use of effective task scheduling.At the same time,the task scheduling process is yet to be explored in the multi-core systems.This paper presents a new hybrid genetic algorithm(GA)with a krill herd(KH)based energy-efficient scheduling techni-que for multi-core systems(GAKH-SMCS).The goal of the GAKH-SMCS tech-nique is to derive scheduling tasks in such a way to achieve faster completion time and minimum energy dissipation.The GAKH-SMCS model involves a multi-objectivefitness function using four parameters such as makespan,processor utilization,speedup,and energy consumption to schedule tasks proficiently.The performance of the GAKH-SMCS model has been validated against two datasets namely random dataset and benchmark dataset.The experimental outcome ensured the effectiveness of the GAKH-SMCS model interms of makespan,pro-cessor utilization,speedup,and energy consumption.The overall simulation results depicted that the presented GAKH-SMCS model achieves energy effi-ciency by optimal task scheduling process in MCS.展开更多
Cognitive radio sensor network is applied to facilitate network monitoring and management, and achieves high spectrum efficiencies in smart grid. However, the conventional traffic scheduling mechanisms are hard to pro...Cognitive radio sensor network is applied to facilitate network monitoring and management, and achieves high spectrum efficiencies in smart grid. However, the conventional traffic scheduling mechanisms are hard to provide guaranteed quality of service for the secondary users. It is because that they ignore the influence of diverse transition requirements in heterogeneous traffi c. Therefore, a novel Qo S-aware packet scheduling mechanism is proposed to improve transmission quality for secondary users. In this mechanism, a Qo S-based prioritization model is established to address data classification firstly. And then, channel quality and the effect of channel switch are integrated into priority-based packet scheduling mechanism. At last, the simulation is implemented with MATLAB and OPNET. The results show that the proposed scheduling mechanism improves the transmission quality of high-priority secondary users and increase the whole system utilization by 10%.展开更多
In order to improve the concurrent access performance of the web-based spatial computing system in cluster,a parallel scheduling strategy based on the multi-core environment is proposed,which includes two levels of pa...In order to improve the concurrent access performance of the web-based spatial computing system in cluster,a parallel scheduling strategy based on the multi-core environment is proposed,which includes two levels of parallel processing mechanisms.One is that it can evenly allocate tasks to each server node in the cluster and the other is that it can implement the load balancing inside a server node.Based on the strategy,a new web-based spatial computing model is designed in this paper,in which,a task response ratio calculation method,a request queue buffer mechanism and a thread scheduling strategy are focused on.Experimental results show that the new model can fully use the multi-core computing advantage of each server node in the concurrent access environment and improve the average hits per second,average I/O Hits,CPU utilization and throughput.Using speed-up ratio to analyze the traditional model and the new one,the result shows that the new model has the best performance.The performance of the multi-core server nodes in the cluster is optimized;the resource utilization and the parallel processing capabilities are enhanced.The more CPU cores you have,the higher parallel processing capabilities will be obtained.展开更多
Based on the biological immune concept, immune response mechanism and expert system, a dynamic and intelligent scheduling model toward the disturbance of the production such as machine fault,task insert and cancel etc...Based on the biological immune concept, immune response mechanism and expert system, a dynamic and intelligent scheduling model toward the disturbance of the production such as machine fault,task insert and cancel etc. Is proposed. The antibody generation method based on the sequence constraints and the coding rule of antibody for the machining procedure is also presented. Using the heuristic antibody generation method based on the physiology immune mechanism, the validity of the scheduling optimization is improved, and based on the immune and expert system under the event-driven constraints, not only Job-shop scheduling problem with multi-objective can be solved, but also the disturbance of the production be handled rapidly. A case of the job-shop scheduling is studied and dynamic optimal solutions with multi-objective function for agile manufacturing are obtained in this paper. And the event-driven dynamic rescheduling result is compared with right-shift rescheduling and total rescheduling.展开更多
Design of scheduling decision mechanism is a key issue of scheduling decision method and strategy for agile manufacturing system. Effective scheduling decision mechanism helps to improve the operational agility of man...Design of scheduling decision mechanism is a key issue of scheduling decision method and strategy for agile manufacturing system. Effective scheduling decision mechanism helps to improve the operational agility of manufacturing system. Several scheduling decision mechanisms are discussed, including scheduling forecasting mechanism, cooperation mechanism and cell scheduling mechanism. Also soft decision mechanism is put forward as a promising prospect for agile manufacturing system, and some key techniques in soft decision mechanism are introduced.展开更多
The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement co...The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.展开更多
The practical engineering of satellite tracking telemetry and command(TT&C)is often disturbed by unpredictable external factors,including the temporary rise in a significant quantity of satellite TT&C tasks,te...The practical engineering of satellite tracking telemetry and command(TT&C)is often disturbed by unpredictable external factors,including the temporary rise in a significant quantity of satellite TT&C tasks,temporary failures and failures of some TT&C resources,and so on.To improve the adaptability and robustness of satellite TT&C systems when faced with uncertain dynamic disturbances,a hierarchical disturbance propagation mechanism and an improved contract network dynamic scheduling method for satellite TT&C resources were designed to address the dynamic scheduling problem of satellite TT&C resources.Firstly,the characteristics of the dynamic scheduling problem of satellite TT&C resources are analyzed,and a mathematical model is established with the weighted optimization objectives of maximizing the revenue from task completion and minimizing the degree of plan disturbance.Then,a bottom-up distributed dynamic collaborative scheduling framework for satellite TT&C resources is proposed,which includes a task layer,a resource layer,a central internal collaboration layer,and a central external collaboration layer.Dynamic disturbances are propagated layer by layer from the task layer to the central external collaboration layer in a bottom-up manner,using efficient heuristic strategies in the task layer and the resource layer,respectively.We use improved contract network algorithms in the center internal collaboration layer and the center external collaboration layer,the original scheduling plan is quickly adjusted to minimize the impact of disturbances while effectively completing dynamic task requirements.Finally,a large number of simulation experiments were carried out and compared with various comparative algorithms.The results show that the proposed algorithm can effectively improve the solution effect of satellite TT&C resource dynamic scheduling problems,and has good application prospects.展开更多
An improved adaptive particle swarm optimization(IAPSO)algorithm is presented for solving the minimum makespan problem of job shop scheduling problem(JSP).Inspired by hormone modulation mechanism,an adaptive hormonal ...An improved adaptive particle swarm optimization(IAPSO)algorithm is presented for solving the minimum makespan problem of job shop scheduling problem(JSP).Inspired by hormone modulation mechanism,an adaptive hormonal factor(HF),composed of an adaptive local hormonal factor(H l)and an adaptive global hormonal factor(H g),is devised to strengthen the information connection between particles.Using HF,each particle of the swarm can adjust its position self-adaptively to avoid premature phenomena and reach better solution.The computational results validate the effectiveness and stability of the proposed IAPSO,which can not only find optimal or close-to-optimal solutions but also obtain both better and more stability results than the existing particle swarm optimization(PSO)algorithms.展开更多
A kind of automatic shift schedule optimization method is provided for a tracked vehicle with hydrodynamic-mechanical transmission in order to improve its dynamic performance. A dynamic model of integrated hydrodynami...A kind of automatic shift schedule optimization method is provided for a tracked vehicle with hydrodynamic-mechanical transmission in order to improve its dynamic performance. A dynamic model of integrated hydrodynamic-mechanical transmission is built in MATLAB/Simdriveline environment, and an optimum shift schedule is derived by using iSight software to call the dynamic model above, then the shift schedule is achieved after optimization. The simulation results show that the method is significant to improve the dynamic performance and gear-shifting smoothness theoretically and practically.展开更多
In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in inte...In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in intelligent manufacturing job shop environment was studied. The dual-resource integrated scheduling model of AGV and machine was established by comprehensively considering constraints of machines, workpieces and AGVs. The bidirectional single path fixed guidance system based on topological map was determined, and the AGV transportation task model was defined. The improved A* path optimization algorithm was used to determine the optimal path, and the path conflict elimination mechanism was described. The improved NSGA-Ⅱ algorithm was used to determine the machining workpiece sequence, and the competition mechanism was introduced to allocate AGV transportation tasks. The proposed model and method were verified by a workshop production example, the results showed that the dual resource integrated scheduling strategy of AGV and machine is effective.展开更多
Due to the stubborn nature of dynamic job shop scheduling problem,a novel ant colony coordination mechanism is proposed in this paper to search for an optimal schedule in dynamic environment.In ant colony coordination...Due to the stubborn nature of dynamic job shop scheduling problem,a novel ant colony coordination mechanism is proposed in this paper to search for an optimal schedule in dynamic environment.In ant colony coordination mechanism,the dynamic job shop is composed of several autonomous ants.These ants coordinate with each other by simulating the ant foraging behavior of spreading pheromone on the trails,by which they can make information available globally,and further more guide ants make optimal decisions.The proposed mechanism is tested by several instances and the results confirm the validity of it.展开更多
基金supported by Taif University Researchers Supporting Program(Project Number:TURSP-2020/195)Taif University,Saudi Arabia.Princess Nourah bint Abdulrahman University Researchers Supporting Project number(PNURSP2022R203)Princess Nourah bint Abdulrahman University,Riyadh,Saudi Arabia.
文摘The developments of multi-core systems(MCS)have considerably improved the existing technologies in thefield of computer architecture.The MCS comprises several processors that are heterogeneous for resource capacities,working environments,topologies,and so on.The existing multi-core technology unlocks additional research opportunities for energy minimization by the use of effective task scheduling.At the same time,the task scheduling process is yet to be explored in the multi-core systems.This paper presents a new hybrid genetic algorithm(GA)with a krill herd(KH)based energy-efficient scheduling techni-que for multi-core systems(GAKH-SMCS).The goal of the GAKH-SMCS tech-nique is to derive scheduling tasks in such a way to achieve faster completion time and minimum energy dissipation.The GAKH-SMCS model involves a multi-objectivefitness function using four parameters such as makespan,processor utilization,speedup,and energy consumption to schedule tasks proficiently.The performance of the GAKH-SMCS model has been validated against two datasets namely random dataset and benchmark dataset.The experimental outcome ensured the effectiveness of the GAKH-SMCS model interms of makespan,pro-cessor utilization,speedup,and energy consumption.The overall simulation results depicted that the presented GAKH-SMCS model achieves energy effi-ciency by optimal task scheduling process in MCS.
基金supported by the State Grid Technology Project of China(SGIT0000 KJJS1500008)
文摘Cognitive radio sensor network is applied to facilitate network monitoring and management, and achieves high spectrum efficiencies in smart grid. However, the conventional traffic scheduling mechanisms are hard to provide guaranteed quality of service for the secondary users. It is because that they ignore the influence of diverse transition requirements in heterogeneous traffi c. Therefore, a novel Qo S-aware packet scheduling mechanism is proposed to improve transmission quality for secondary users. In this mechanism, a Qo S-based prioritization model is established to address data classification firstly. And then, channel quality and the effect of channel switch are integrated into priority-based packet scheduling mechanism. At last, the simulation is implemented with MATLAB and OPNET. The results show that the proposed scheduling mechanism improves the transmission quality of high-priority secondary users and increase the whole system utilization by 10%.
基金Supported by the China Postdoctoral Science Foundation(No.2014M552115)the Fundamental Research Funds for the Central Universities,ChinaUniversity of Geosciences(Wuhan)(No.CUGL140833)the National Key Technology Support Program of China(No.2011BAH06B04)
文摘In order to improve the concurrent access performance of the web-based spatial computing system in cluster,a parallel scheduling strategy based on the multi-core environment is proposed,which includes two levels of parallel processing mechanisms.One is that it can evenly allocate tasks to each server node in the cluster and the other is that it can implement the load balancing inside a server node.Based on the strategy,a new web-based spatial computing model is designed in this paper,in which,a task response ratio calculation method,a request queue buffer mechanism and a thread scheduling strategy are focused on.Experimental results show that the new model can fully use the multi-core computing advantage of each server node in the concurrent access environment and improve the average hits per second,average I/O Hits,CPU utilization and throughput.Using speed-up ratio to analyze the traditional model and the new one,the result shows that the new model has the best performance.The performance of the multi-core server nodes in the cluster is optimized;the resource utilization and the parallel processing capabilities are enhanced.The more CPU cores you have,the higher parallel processing capabilities will be obtained.
基金This work was supported by National Science Foundation of Shanghai(02ZF14003)
文摘Based on the biological immune concept, immune response mechanism and expert system, a dynamic and intelligent scheduling model toward the disturbance of the production such as machine fault,task insert and cancel etc. Is proposed. The antibody generation method based on the sequence constraints and the coding rule of antibody for the machining procedure is also presented. Using the heuristic antibody generation method based on the physiology immune mechanism, the validity of the scheduling optimization is improved, and based on the immune and expert system under the event-driven constraints, not only Job-shop scheduling problem with multi-objective can be solved, but also the disturbance of the production be handled rapidly. A case of the job-shop scheduling is studied and dynamic optimal solutions with multi-objective function for agile manufacturing are obtained in this paper. And the event-driven dynamic rescheduling result is compared with right-shift rescheduling and total rescheduling.
基金Supported by China Hi-tech Program(China 863) (2003AA411120)Humanities and Social Sciences Program of East China University of Science & Technology
文摘Design of scheduling decision mechanism is a key issue of scheduling decision method and strategy for agile manufacturing system. Effective scheduling decision mechanism helps to improve the operational agility of manufacturing system. Several scheduling decision mechanisms are discussed, including scheduling forecasting mechanism, cooperation mechanism and cell scheduling mechanism. Also soft decision mechanism is put forward as a promising prospect for agile manufacturing system, and some key techniques in soft decision mechanism are introduced.
基金This work is supported by the Next Generation Transportation Systems Center(NEXTRANS),USDOT's Region 5 University Transportation CenterThe work is also affiliated with Purdue University College of Engineering's Institute for Control,Optimization,and Networks(ICON)and Center for Intelligent Infrastructure(CII)initiatives.
文摘The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers.
基金This work was supported in part by the National Natural Science Foundation of China(No.62373380).
文摘The practical engineering of satellite tracking telemetry and command(TT&C)is often disturbed by unpredictable external factors,including the temporary rise in a significant quantity of satellite TT&C tasks,temporary failures and failures of some TT&C resources,and so on.To improve the adaptability and robustness of satellite TT&C systems when faced with uncertain dynamic disturbances,a hierarchical disturbance propagation mechanism and an improved contract network dynamic scheduling method for satellite TT&C resources were designed to address the dynamic scheduling problem of satellite TT&C resources.Firstly,the characteristics of the dynamic scheduling problem of satellite TT&C resources are analyzed,and a mathematical model is established with the weighted optimization objectives of maximizing the revenue from task completion and minimizing the degree of plan disturbance.Then,a bottom-up distributed dynamic collaborative scheduling framework for satellite TT&C resources is proposed,which includes a task layer,a resource layer,a central internal collaboration layer,and a central external collaboration layer.Dynamic disturbances are propagated layer by layer from the task layer to the central external collaboration layer in a bottom-up manner,using efficient heuristic strategies in the task layer and the resource layer,respectively.We use improved contract network algorithms in the center internal collaboration layer and the center external collaboration layer,the original scheduling plan is quickly adjusted to minimize the impact of disturbances while effectively completing dynamic task requirements.Finally,a large number of simulation experiments were carried out and compared with various comparative algorithms.The results show that the proposed algorithm can effectively improve the solution effect of satellite TT&C resource dynamic scheduling problems,and has good application prospects.
基金Supported by the National Natural Science Foundation of China(51175262)the Research Fund for Doctoral Program of Higher Education of China(20093218110020)+2 种基金the Jiangsu Province Science Foundation for Excellent Youths(BK201210111)the Jiangsu Province Industry-Academy-Research Grant(BY201220116)the Innovative and Excellent Foundation for Doctoral Dissertation of Nanjing University of Aeronautics and Astronautics(BCXJ10-09)
文摘An improved adaptive particle swarm optimization(IAPSO)algorithm is presented for solving the minimum makespan problem of job shop scheduling problem(JSP).Inspired by hormone modulation mechanism,an adaptive hormonal factor(HF),composed of an adaptive local hormonal factor(H l)and an adaptive global hormonal factor(H g),is devised to strengthen the information connection between particles.Using HF,each particle of the swarm can adjust its position self-adaptively to avoid premature phenomena and reach better solution.The computational results validate the effectiveness and stability of the proposed IAPSO,which can not only find optimal or close-to-optimal solutions but also obtain both better and more stability results than the existing particle swarm optimization(PSO)algorithms.
基金Sponsored by the National Natural Science Foudation of China(50905016)
文摘A kind of automatic shift schedule optimization method is provided for a tracked vehicle with hydrodynamic-mechanical transmission in order to improve its dynamic performance. A dynamic model of integrated hydrodynamic-mechanical transmission is built in MATLAB/Simdriveline environment, and an optimum shift schedule is derived by using iSight software to call the dynamic model above, then the shift schedule is achieved after optimization. The simulation results show that the method is significant to improve the dynamic performance and gear-shifting smoothness theoretically and practically.
基金Project(BK20201162)supported by the General Program of Natural Science Foundation of Jiangsu Province,ChinaProject(JC2019126)supported by the Science and Technology Plan Fundamental Scientific Research Funding Project of Nantong,China+1 种基金Project(CE20205045)supported by the Changzhou Science and Technology Support Plan(Social Development),ChinaProject(51875171)supported by the National Nature Science Foundation of China。
文摘In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in intelligent manufacturing job shop environment was studied. The dual-resource integrated scheduling model of AGV and machine was established by comprehensively considering constraints of machines, workpieces and AGVs. The bidirectional single path fixed guidance system based on topological map was determined, and the AGV transportation task model was defined. The improved A* path optimization algorithm was used to determine the optimal path, and the path conflict elimination mechanism was described. The improved NSGA-Ⅱ algorithm was used to determine the machining workpiece sequence, and the competition mechanism was introduced to allocate AGV transportation tasks. The proposed model and method were verified by a workshop production example, the results showed that the dual resource integrated scheduling strategy of AGV and machine is effective.
基金National Natural Science Foundation of China(No.50575137)National Science and Technology Support Project(No.2006BAF01A44)National High Technology Research and Development Program of China(863 Program,No.2007AA04Z109)
文摘Due to the stubborn nature of dynamic job shop scheduling problem,a novel ant colony coordination mechanism is proposed in this paper to search for an optimal schedule in dynamic environment.In ant colony coordination mechanism,the dynamic job shop is composed of several autonomous ants.These ants coordinate with each other by simulating the ant foraging behavior of spreading pheromone on the trails,by which they can make information available globally,and further more guide ants make optimal decisions.The proposed mechanism is tested by several instances and the results confirm the validity of it.