The target of integrated construction of comprehensive transportation hub is to integrate the traffic resources,achieve butt joint of pan-regional transportation mode,and finally realize the"seamless connection&q...The target of integrated construction of comprehensive transportation hub is to integrate the traffic resources,achieve butt joint of pan-regional transportation mode,and finally realize the"seamless connection"of the goods and"zero transfer"of the passenger traffic.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel,Luzhou puts forth effort to build a comprehensive transport hub in Southern Sichuan and has made great efforts in traffic infrastructure construction.However,there are still some problems.Combining practice of Luzhou,using the advanced experience of foreign and domestic cities for reference,the paper pointed out that for the sake of constructing a comprehensive transportation hub,we need to build the traffic integration on the basis of the efficiency.Besides,the paper proposed the strategies for construction.展开更多
The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the ope...The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the operation costs and benefits of an urban distribution network in the future.Through the scientific and reasonable planning of public transport hubs on the premise of meeting the needs of basic public transport services,it can reduce the negative impact of electric bus charging loads upon the power grids.Furthermore,it can use its flexible operation characteristics to provide flexible support for the distribution network.In this paper,taking the impact of public transport hub on the reliability of distribution network as the starting point,a three-level programming optimization model based on the value and economy of distribution network load loss is proposed.Through the upper model,several planning schemes can be generated,which provides boundary conditions for the expansion of middle-level optimization.The normal operation dispatching scheme of public transport hub obtained from the middle-level optimization results provides boundary conditions for the development of lower level optimization.Through the lower level optimization,the expected load loss of the whole distribution system including bus hub under the planning scheme given by the upper level can be obtained.The effectiveness of the model is verified by an IEEE-33 bus example.展开更多
In this paper, a study on four African ports was taken out that all have the ca-pability to become a hub port that can serve the central African region. The paper sort to determine which port was most suitable and por...In this paper, a study on four African ports was taken out that all have the ca-pability to become a hub port that can serve the central African region. The paper sort to determine which port was most suitable and port indexing was the method that was used to evaluate these ports. The ports evaluated were the port of Kribi, the port of Bata, the port of Libreville and the port of Pointe-Noire. There were other models that were also used which included linear regression and linear programming which all contributed to providing the final results of the port with the most suitable potential to serve as a hub port and meaningful results were obtained. The final results showed that the port of Pointe-Noire was the most suitable port to serve the central African region as a hub port.展开更多
The target of integrated construction of comprehensive transportation hub is to integrate the traffi c resources, achieve butt jointof pan-regional transportation mode, and fi nally realize the “seamless connection”...The target of integrated construction of comprehensive transportation hub is to integrate the traffi c resources, achieve butt jointof pan-regional transportation mode, and fi nally realize the “seamless connection”of the goods and “zero transfer” of the passenger traffi c.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel, Luzhou puts forth effort to build acomprehensive transport hub in Southern Sichuan and has made great efforts in traffi c infrastructure construction. However, there are still someproblems. Combining practice of Luzhou, using the advanced experience of foreign and domestic cities for reference, the paper pointed out thatfor the sake of constructing a comprehensive transportation hub, we need to build the traffi c integration on the basis of the effi ciency. Besides, thepaper proposed the strategies for construction.展开更多
In this paper, the roles of infrastructure development and transportation coordination for Northeast Asian economic cooperation are discussed. It would be necessary to establish an efficient transportation network as ...In this paper, the roles of infrastructure development and transportation coordination for Northeast Asian economic cooperation are discussed. It would be necessary to establish an efficient transportation network as soon as possible. 'Hub-and-Spoke'transportation system and China-Korean peninsula railway container transportation system might be more significant for regional economic cooperation.展开更多
An optimization model for the regional comprehensive freight hub location problem was built up from the viewpoint of the minimum cost of freight system. The construction method for regional comprehensive intermodal fr...An optimization model for the regional comprehensive freight hub location problem was built up from the viewpoint of the minimum cost of freight system. The construction method for regional comprehensive intermodal freight network was put forward, and three constraints of the reasonable and feasible path of the intermodal transport, i. e. , reasonable sequence, reasonable freight distance, and reasonable conversion times, were proposed according to the general concepts of the intermodal freight. Then the method for solving the model was given based on the super network and genetic algorithm. Finally, the model and the solution were verified by case study.展开更多
To increase the passenger transferring efficiency, the bus coordination holding control for transit hubs, which is as an important dynamic dispatching method for improving the service level of transit hubs, was studie...To increase the passenger transferring efficiency, the bus coordination holding control for transit hubs, which is as an important dynamic dispatching method for improving the service level of transit hubs, was studied in the framework of bus coordination dispatching mode. Firstly, the bus coordination holding control flow was studied based on Advanced Public Transportation Systems (APTS) environment. Then a control model was presented to optimize the bus vehicle holding time, and a genetic algorithm was designed as the solving method. In the end, an example was given to illustrate the effectiveness of the control strategy and the algorithm.展开更多
文摘The target of integrated construction of comprehensive transportation hub is to integrate the traffic resources,achieve butt joint of pan-regional transportation mode,and finally realize the"seamless connection"of the goods and"zero transfer"of the passenger traffic.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel,Luzhou puts forth effort to build a comprehensive transport hub in Southern Sichuan and has made great efforts in traffic infrastructure construction.However,there are still some problems.Combining practice of Luzhou,using the advanced experience of foreign and domestic cities for reference,the paper pointed out that for the sake of constructing a comprehensive transportation hub,we need to build the traffic integration on the basis of the efficiency.Besides,the paper proposed the strategies for construction.
文摘The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the operation costs and benefits of an urban distribution network in the future.Through the scientific and reasonable planning of public transport hubs on the premise of meeting the needs of basic public transport services,it can reduce the negative impact of electric bus charging loads upon the power grids.Furthermore,it can use its flexible operation characteristics to provide flexible support for the distribution network.In this paper,taking the impact of public transport hub on the reliability of distribution network as the starting point,a three-level programming optimization model based on the value and economy of distribution network load loss is proposed.Through the upper model,several planning schemes can be generated,which provides boundary conditions for the expansion of middle-level optimization.The normal operation dispatching scheme of public transport hub obtained from the middle-level optimization results provides boundary conditions for the development of lower level optimization.Through the lower level optimization,the expected load loss of the whole distribution system including bus hub under the planning scheme given by the upper level can be obtained.The effectiveness of the model is verified by an IEEE-33 bus example.
文摘In this paper, a study on four African ports was taken out that all have the ca-pability to become a hub port that can serve the central African region. The paper sort to determine which port was most suitable and port indexing was the method that was used to evaluate these ports. The ports evaluated were the port of Kribi, the port of Bata, the port of Libreville and the port of Pointe-Noire. There were other models that were also used which included linear regression and linear programming which all contributed to providing the final results of the port with the most suitable potential to serve as a hub port and meaningful results were obtained. The final results showed that the port of Pointe-Noire was the most suitable port to serve the central African region as a hub port.
文摘The target of integrated construction of comprehensive transportation hub is to integrate the traffi c resources, achieve butt jointof pan-regional transportation mode, and fi nally realize the “seamless connection”of the goods and “zero transfer” of the passenger traffi c.Relying on the particularity of the geographical location and the convenience of the Yangtze River channel, Luzhou puts forth effort to build acomprehensive transport hub in Southern Sichuan and has made great efforts in traffi c infrastructure construction. However, there are still someproblems. Combining practice of Luzhou, using the advanced experience of foreign and domestic cities for reference, the paper pointed out thatfor the sake of constructing a comprehensive transportation hub, we need to build the traffi c integration on the basis of the effi ciency. Besides, thepaper proposed the strategies for construction.
基金Under the auspices of the National Natural Science Foundation of China (No. 49871026) key Directional Project of Knowledge Inno
文摘In this paper, the roles of infrastructure development and transportation coordination for Northeast Asian economic cooperation are discussed. It would be necessary to establish an efficient transportation network as soon as possible. 'Hub-and-Spoke'transportation system and China-Korean peninsula railway container transportation system might be more significant for regional economic cooperation.
基金The National Natural Science Foundation of China (No.50708020)Provincial Natural Science Fund of Jiangsu (BK2007566)
文摘An optimization model for the regional comprehensive freight hub location problem was built up from the viewpoint of the minimum cost of freight system. The construction method for regional comprehensive intermodal freight network was put forward, and three constraints of the reasonable and feasible path of the intermodal transport, i. e. , reasonable sequence, reasonable freight distance, and reasonable conversion times, were proposed according to the general concepts of the intermodal freight. Then the method for solving the model was given based on the super network and genetic algorithm. Finally, the model and the solution were verified by case study.
基金Sponsored by the National Natural Science Foundation of China (Grant No. 70601022)the National Basic Research Program of China (Grant No.2006CB705505)
文摘To increase the passenger transferring efficiency, the bus coordination holding control for transit hubs, which is as an important dynamic dispatching method for improving the service level of transit hubs, was studied in the framework of bus coordination dispatching mode. Firstly, the bus coordination holding control flow was studied based on Advanced Public Transportation Systems (APTS) environment. Then a control model was presented to optimize the bus vehicle holding time, and a genetic algorithm was designed as the solving method. In the end, an example was given to illustrate the effectiveness of the control strategy and the algorithm.