Thefilter-x least mean square(FxLMS)algorithm is widely used in active noise control(ANC)systems.However,because the algorithm is a feedback control algorithm based on the minimization of the error signal variance to ...Thefilter-x least mean square(FxLMS)algorithm is widely used in active noise control(ANC)systems.However,because the algorithm is a feedback control algorithm based on the minimization of the error signal variance to update thefilter coefficients,it has a certain delay,usually has a slow convergence speed,and the system response time is long and easily affected by the learning rate leading to the lack of system stability,which often fails to achieve the desired control effect in practice.In this paper,we propose an active control algorithm with near-est-neighbor trap structure and neural network feedback mechanism to reduce the coefficient update time of the FxLMS algorithm and use the neural network feedback mechanism to realize the parameter update,which is called NNR-BPFxLMS algorithm.In the paper,the schematic diagram of the feedback control is given,and the performance of the algorithm is analyzed.Under various noise conditions,it is shown by simulation and experiment that the NNR-BPFxLMS algorithm has the following three advantages:in terms of performance,it has higher noise reduction under the same number of sampling points,i.e.,it has faster convergence speed,and by computer simulation and sound pipe experiment,for simple ideal line spectrum noise,compared with the convergence speed of NNR-BPFxLMS is improved by more than 95%compared with FxLMS algorithm,and the convergence speed of real noise is also improved by more than 70%.In terms of stability,NNR-BPFxLMS is insensitive to step size changes.In terms of tracking performance,its algorithm responds quickly to sudden changes in the noise spectrum and can cope with the complex control requirements of sudden changes in the noise spectrum.展开更多
The distribution network exhibits complex structural characteristics,which makes fault localization a challenging task.Especially when a branch of the multi-branch distribution network fails,the traditional multi-bran...The distribution network exhibits complex structural characteristics,which makes fault localization a challenging task.Especially when a branch of the multi-branch distribution network fails,the traditional multi-branch fault location algorithm makes it difficult to meet the demands of high-precision fault localization in the multi-branch distribution network system.In this paper,the multi-branch mainline is decomposed into single branch lines,transforming the complex multi-branch fault location problem into a double-ended fault location problem.Based on the different transmission characteristics of the fault-traveling wave in fault lines and non-fault lines,the endpoint reference time difference matrix S and the fault time difference matrix G were established.The time variation rule of the fault-traveling wave arriving at each endpoint before and after a fault was comprehensively utilized.To realize the fault segment location,the least square method was introduced.It was used to find the first-order fitting relation that satisfies the matching relationship between the corresponding row vector and the first-order function in the two matrices,to realize the fault segment location.Then,the time difference matrix is used to determine the traveling wave velocity,which,combined with the double-ended traveling wave location,enables accurate fault location.展开更多
The 10kV distribution network is an essential component of the power system,and its stable operation is crucial for ensuring reliable power supply.However,various factors can lead to faults in the distribution network...The 10kV distribution network is an essential component of the power system,and its stable operation is crucial for ensuring reliable power supply.However,various factors can lead to faults in the distribution network.In order to enhance the safety and reliability of power distribution,this paper focuses on the analysis of faults in the 10kV distribution network caused by natural factors,operational factors,human factors,and equipment factors.It elucidates the various hazards resulting from distribution network faults and proposes corresponding preventive measures for different types of faults in the 10kV distribution network.The aim is to mitigate or reduce the impact of distribution network faults,ensuring the safe and stable operation of the distribution system.展开更多
The WSN used in power line monitoring is long chain structure, and the bottleneck near the Sink node is more obvious. In view of this, A Sink nodes’ cooperation mechanism is presented. The Sink nodes from different W...The WSN used in power line monitoring is long chain structure, and the bottleneck near the Sink node is more obvious. In view of this, A Sink nodes’ cooperation mechanism is presented. The Sink nodes from different WSNs are adjacently deployed. Adopting multimode and spatial multiplexing network technology, the network is constructed into multi-mode-level to achieve different levels of data streaming. The network loads are shunted and the network resources are rationally utilized. Through the multi-sink nodes cooperation, the bottlenecks at the Sink node and its near several jump nodes are solved and process the competition of communication between nodes by channel adjustment. Finally, the paper analyzed the method and provided simulation experiment results. Simulation results show that the method can solve the funnel effect of the sink node, and get a good QoS.展开更多
In the distribution network system with its neutral point grounding via arc suppression coil, when single-phase grounding fault occurred near zero-crossing point of the phase voltage, the inaccuracy of the line select...In the distribution network system with its neutral point grounding via arc suppression coil, when single-phase grounding fault occurred near zero-crossing point of the phase voltage, the inaccuracy of the line selection always existed in existing methods. According to the characteristics that transient current was different between the fault feeder and other faultless feeders, wavelet transformation was performed on data of the transient current within a power frequency cycle after the fault occurred. Based on different fault angles, wavelet energy in corresponding frequency band was chosen to compare. The result was that wavelet energy in fault feeder was the largest of all, and it was larger than sum of those in other faultless feeders, when the bus broke down, the disparity between each wavelet energy was not significant. Fault line could be selected out by the criterion above. The results of MATLAB/simulink simulation experiment indicated that this method had anti-interference capacity and was feasible.展开更多
The optimal transmission lines assignment with maximal reliabilities (OTLAMR) in the multi-source multi-sink multi-state computer network (MMMCN) was investigated. The OTLAMR problem contains two sub-problems: the MMM...The optimal transmission lines assignment with maximal reliabilities (OTLAMR) in the multi-source multi-sink multi-state computer network (MMMCN) was investigated. The OTLAMR problem contains two sub-problems: the MMMCN reliabilities evaluation and multi-objective transmission lines assignment optimization. First, a reliability evaluation with a transmission line assignment (RETLA) algorithm is proposed to calculate the MMMCN reliabilities under the cost constraint for a certain transmission lines configuration. Second, the non-dominated sorting genetic algorithm II (NSGA-II) is adopted to find the non-dominated set of the transmission lines assignments based on the reliabilities obtained from the RETLA algorithm. By combining the RETLA and the NSGA-II algorithms together, the RETLA-NSGA II algorithm is proposed to solve the OTLAMR problem. The experiments result show that the RETLA-NSGA II algorithm can provide efficient solutions in a reasonable time, from which the decision makers can choose the best solution based on their preferences and experiences.展开更多
Line-of-sight clarity and assurance are essential because they are considered the golden rule in wireless network planning,allowing the direct propagation path to connect the transmitter and receiver and retain the st...Line-of-sight clarity and assurance are essential because they are considered the golden rule in wireless network planning,allowing the direct propagation path to connect the transmitter and receiver and retain the strength of the signal to be received.Despite the increasing literature on the line of sight with different scenarios,no comprehensive study focuses on the multiplicity of parameters and basic concepts that must be taken into account when studying such a topic as it affects the results and their accuracy.Therefore,this research aims to find limited values that ensure that the signal reaches the future efficiently and enhances the accuracy of these values’results.We have designed MATLAB simulation and programming programs by Visual Basic.NET for a semi-realistic communication system.It includes all the basic parameters of this system,taking into account the environment’s diversity and the characteristics of the obstacle between the transmitting station and the receiving station.Then we verified the correctness of the system’s work.Moreover,we begin by analyzing and studying multiple and branching cases to achieve the goal.We get several values from the results,which are finite values,which are a useful reference for engineers and designers of wireless networks.展开更多
A flat neural network is designed for the on line state prediction of engine. To reduce the computational cost of weight matrix, a fast recursive algorithm is derived according to the pseudoinverse formula of a parti...A flat neural network is designed for the on line state prediction of engine. To reduce the computational cost of weight matrix, a fast recursive algorithm is derived according to the pseudoinverse formula of a partition matrix. Furthermore, the forgetting factor approach is introduced to improve predictive accuracy and robustness of the model. The experiment results indicate that the improved neural network is of good accuracy and strong robustness in prediction, and can apply for the on line prediction of nonlinear multi input multi output systems like vehicle engines.展开更多
A strategy of developing on-line optimization intelligent systems based on combiningflowsheeting simulation and optimization package with artificial neural networks(ANN)is presented inthis paper.A number of optimizati...A strategy of developing on-line optimization intelligent systems based on combiningflowsheeting simulation and optimization package with artificial neural networks(ANN)is presented inthis paper.A number of optimization cases for a certain chemical plant are obtained off-line byusing PROCESS-Ⅱ or other flowsheeting programming with optimization.Then,taking these cases astraining examples,we establish a neural network systems which can be used on-line as an optimizer toobtain setpoints from input data sampled from distributed control system through gross error detectionand data reconciliation procedures.Such an on-line optimizer possesses two advantages over nonlinearprogramming package:first of all,there is no convergence problem for the trained ANN to be usedonline;secondly,the frequency for setpoints updating is not limited because only algebraic calculationrather than optimization is required to be carried out on-line.Here two key problems ofimplementing ANN approaches to the on-line optimization展开更多
The theory of RC uniform ladder networks based upon the recurrence of voltage and cur-rent functions is extended as a vehicle to analyse the dynamic characteristics of reg lines. Meth-ods for computing the time consta...The theory of RC uniform ladder networks based upon the recurrence of voltage and cur-rent functions is extended as a vehicle to analyse the dynamic characteristics of reg lines. Meth-ods for computing the time constants and simplifying the transfer functions for reg lines are alsopresented.展开更多
A new simple method in which arbitrary transfer function matrix is realized withactive multiple port network instead of computer simulating is proposed. The active multipleport network is carried on through state feed...A new simple method in which arbitrary transfer function matrix is realized withactive multiple port network instead of computer simulating is proposed. The active multipleport network is carried on through state feedback and state cross output for RC ladder network.The main process is to determine coefficients of each adder. Finally, an example is given forillustration.展开更多
Ground short circuit faults in current transmission lines are common in the power systems.In order to prevent the power system from aggravating the accident caused by short-circuit faults of transmission lines,a novel...Ground short circuit faults in current transmission lines are common in the power systems.In order to prevent the power system from aggravating the accident caused by short-circuit faults of transmission lines,a novel convolutional neural network(CNN)model is constructed to identify the short-circuit fault of the transmission line in the power system.The CNN model is mainly consisted of five convolutional layers,three max-pooling layers,one concatenate layer,one dropout layer,one fully connected layer,and a Softmax classifier.This method uses a fixed time window to intercept system short-circuit fault data,extracts the deep features of these data from the training samples,and then corresponds the extracted features to labels one-to-one.Finally,in PSCAD/EMTDC,the new England 10 machine 39 nodes are taken as an example to realize the simulation.The experimental results show that the CNN model can quickly and accurately identify the short-circuit fault types,and the optimal model accuracy rate reaches 99.95%.The results of this manuscript-have positive effect on enhancing the disaster prevention capability and the operation stability of transmission lines.展开更多
A semi-analytical method in time domain is presented for analysis of the transient response of nonuniform transmission lines. In this method, the telegraph equations in time domain is differenced in space domain first...A semi-analytical method in time domain is presented for analysis of the transient response of nonuniform transmission lines. In this method, the telegraph equations in time domain is differenced in space domain first, and is transformed into a set of first-order differential equations of voltage and current with respect to time. By integrating these differential equations with respect to time, and precise computation, the solution of these differential equations can be obtained. This method can solve the transient response of various kinds of transmission lines with arbitrary terminal networks. Particularly, it can analyze the nonuniform lines with initial conditions, for which there is no existing effective method to analyze the time response so far. The results obtained with this method are stable and accurate. Two examples are given to illustrate the application of this method.展开更多
Integrating the power grid technology with renewable power generation technologies, Demand Response (DR) programs enabled by the Advanced Metering Infrastructure (AMI) were introduced into the power grid in the intere...Integrating the power grid technology with renewable power generation technologies, Demand Response (DR) programs enabled by the Advanced Metering Infrastructure (AMI) were introduced into the power grid in the interest of both utilities and residents. They help to achieve load balance and increase the grid reliability by encouraging residents to reduce their power usage during peak load periods in return for incentives. To automate this process, appliances, in-house sensors, and the AMI controller need to be networked together. In this paper, we compare mainstream network technologies applicable to home appliance control and propose a solution combining Power Line Communication (PLC) with wireless communication in smart homes for the purpose of energy saving. We extended NS-2, a popular network simulator, to model such combined network scenarios. Using a number of different routing strategies, we then model and evaluate the network performance of DR programs in smart homes in such a combined network.展开更多
When solving the routing problem with traditional ant colony algorithm, there is scarce in initialize pheromone and a slow convergence and stagnation for the complex network topology and the time-varying characteristi...When solving the routing problem with traditional ant colony algorithm, there is scarce in initialize pheromone and a slow convergence and stagnation for the complex network topology and the time-varying characteristics of channel in power line carrier communication of low voltage distribution grid. The algorithm is easy to fall into premature and local optimization. Proposed an automatic network algorithm based on improved transmission delay and the load factor as the evaluation factors. With the requirements of QoS, a logical topology of power line communication network is established. By the experiment of MATLAB simulation, verify that the improved Dynamic hybrid ant colony genetic algorithm (DH_ACGA) algorithm has improved the communication performance, which solved the QoS routing problems of power communication to some extent.展开更多
In modem protection relays, the accurate and fast fault location is an essential task for transmission line protection from the point of service restoration and reliability. The applications of neural networks based f...In modem protection relays, the accurate and fast fault location is an essential task for transmission line protection from the point of service restoration and reliability. The applications of neural networks based fault location techniques to transmission line are available in many papers. However, almost all the studies have so far employed the FNN (feed-forward neural network) trained with back-propagation algorithm (BPNN) which has a better structure and been widely used. But there are still many drawbacks if we simply use feed-forward neural network, such as slow training rate, easy to trap into local minimum point, and bad ability on global search. In this paper, feed-forward neural network trained by PSO (particle swarm optimization) algorithm is proposed for fault location scheme in 500 kV transmission system with distributed parameters presentation, The purpose is to simulate distance protection relay. The algorithm acts as classifier which requires phasor measurements data from one end of the transmission line and DFT (discrete Fourier transform). Extensive simulation studies carried out using MATLAB show that the proposed scheme has the ability to give a good estimation of fault location under various fault conditions.展开更多
This is an extended version of the same titled paper presented at the 21st CIRED. It discusses a new technique for identification and location of defective insulator strings in power lines based on the analysis of hig...This is an extended version of the same titled paper presented at the 21st CIRED. It discusses a new technique for identification and location of defective insulator strings in power lines based on the analysis of high frequency signals generated by corona effect. Damaged insulator strings may lead to loss of insulation and hence to the corona effect, in other words, to partial discharges. These partial discharges can be detected by a system composed of a capacitive coupling device (region between the phase and the metal body of a current transformer), a data acquisition board and a computer. Analyzing the waveform of these partial discharges through a neural network based software, it is possible to identify and locate the defective insulator string. This paper discusses how this software analysis works and why its technique is suitable for this application. Hence the results of key tests performed along the development are discussed, pointing out the main factors that affect their performance.展开更多
Several industrial computers and a server are combined to set up the on-line monitoring and diagnostic system of turbo-generator sets. The main function of the system is to monitor machine sets' running condition....Several industrial computers and a server are combined to set up the on-line monitoring and diagnostic system of turbo-generator sets. The main function of the system is to monitor machine sets' running condition. Through analyzing running data, technicians can detect whether there exist faults and where they occur. To share and transmit the dynamic information of the turbo-generator sets, a distributed network system is introduced. NetWare network operating system is used in the LAN (Local Area Network) system. The LAN is extended to realize the sharing of data and remote transmission of information. Furthermore, functions of monitoring and diagnostic clients are listed.展开更多
In the Ethernet lossless Data Center Networks (DCNs) deployedwith Priority-based Flow Control (PFC), the head-of-line blocking problemis still difficult to prevent due to PFC triggering under burst trafficscenarios ev...In the Ethernet lossless Data Center Networks (DCNs) deployedwith Priority-based Flow Control (PFC), the head-of-line blocking problemis still difficult to prevent due to PFC triggering under burst trafficscenarios even with the existing congestion control solutions. To addressthe head-of-line blocking problem of PFC, we propose a new congestioncontrol mechanism. The key point of Congestion Control Using In-NetworkTelemetry for Lossless Datacenters (ICC) is to use In-Network Telemetry(INT) technology to obtain comprehensive congestion information, which isthen fed back to the sender to adjust the sending rate timely and accurately.It is possible to control congestion in time, converge to the target rate quickly,and maintain a near-zero queue length at the switch when using ICC. Weconducted Network Simulator-3 (NS-3) simulation experiments to test theICC’s performance. When compared to Congestion Control for Large-ScaleRDMA Deployments (DCQCN), TIMELY: RTT-based Congestion Controlfor the Datacenter (TIMELY), and Re-architecting Congestion Managementin Lossless Ethernet (PCN), ICC effectively reduces PFC pause messages andFlow Completion Time (FCT) by 47%, 56%, 34%, and 15.3×, 14.8×, and11.2×, respectively.展开更多
基金This work was supported by the National Key R&D Program of China(Grant No.2020YFA040070).
文摘Thefilter-x least mean square(FxLMS)algorithm is widely used in active noise control(ANC)systems.However,because the algorithm is a feedback control algorithm based on the minimization of the error signal variance to update thefilter coefficients,it has a certain delay,usually has a slow convergence speed,and the system response time is long and easily affected by the learning rate leading to the lack of system stability,which often fails to achieve the desired control effect in practice.In this paper,we propose an active control algorithm with near-est-neighbor trap structure and neural network feedback mechanism to reduce the coefficient update time of the FxLMS algorithm and use the neural network feedback mechanism to realize the parameter update,which is called NNR-BPFxLMS algorithm.In the paper,the schematic diagram of the feedback control is given,and the performance of the algorithm is analyzed.Under various noise conditions,it is shown by simulation and experiment that the NNR-BPFxLMS algorithm has the following three advantages:in terms of performance,it has higher noise reduction under the same number of sampling points,i.e.,it has faster convergence speed,and by computer simulation and sound pipe experiment,for simple ideal line spectrum noise,compared with the convergence speed of NNR-BPFxLMS is improved by more than 95%compared with FxLMS algorithm,and the convergence speed of real noise is also improved by more than 70%.In terms of stability,NNR-BPFxLMS is insensitive to step size changes.In terms of tracking performance,its algorithm responds quickly to sudden changes in the noise spectrum and can cope with the complex control requirements of sudden changes in the noise spectrum.
基金This work was funded by the project of State Grid Hunan Electric Power Research Institute(No.SGHNDK00PWJS2210033).
文摘The distribution network exhibits complex structural characteristics,which makes fault localization a challenging task.Especially when a branch of the multi-branch distribution network fails,the traditional multi-branch fault location algorithm makes it difficult to meet the demands of high-precision fault localization in the multi-branch distribution network system.In this paper,the multi-branch mainline is decomposed into single branch lines,transforming the complex multi-branch fault location problem into a double-ended fault location problem.Based on the different transmission characteristics of the fault-traveling wave in fault lines and non-fault lines,the endpoint reference time difference matrix S and the fault time difference matrix G were established.The time variation rule of the fault-traveling wave arriving at each endpoint before and after a fault was comprehensively utilized.To realize the fault segment location,the least square method was introduced.It was used to find the first-order fitting relation that satisfies the matching relationship between the corresponding row vector and the first-order function in the two matrices,to realize the fault segment location.Then,the time difference matrix is used to determine the traveling wave velocity,which,combined with the double-ended traveling wave location,enables accurate fault location.
基金Tibet Autonomous Region Natural Fund Key Project(XZ202201ZR0024G)。
文摘The 10kV distribution network is an essential component of the power system,and its stable operation is crucial for ensuring reliable power supply.However,various factors can lead to faults in the distribution network.In order to enhance the safety and reliability of power distribution,this paper focuses on the analysis of faults in the 10kV distribution network caused by natural factors,operational factors,human factors,and equipment factors.It elucidates the various hazards resulting from distribution network faults and proposes corresponding preventive measures for different types of faults in the 10kV distribution network.The aim is to mitigate or reduce the impact of distribution network faults,ensuring the safe and stable operation of the distribution system.
文摘The WSN used in power line monitoring is long chain structure, and the bottleneck near the Sink node is more obvious. In view of this, A Sink nodes’ cooperation mechanism is presented. The Sink nodes from different WSNs are adjacently deployed. Adopting multimode and spatial multiplexing network technology, the network is constructed into multi-mode-level to achieve different levels of data streaming. The network loads are shunted and the network resources are rationally utilized. Through the multi-sink nodes cooperation, the bottlenecks at the Sink node and its near several jump nodes are solved and process the competition of communication between nodes by channel adjustment. Finally, the paper analyzed the method and provided simulation experiment results. Simulation results show that the method can solve the funnel effect of the sink node, and get a good QoS.
文摘In the distribution network system with its neutral point grounding via arc suppression coil, when single-phase grounding fault occurred near zero-crossing point of the phase voltage, the inaccuracy of the line selection always existed in existing methods. According to the characteristics that transient current was different between the fault feeder and other faultless feeders, wavelet transformation was performed on data of the transient current within a power frequency cycle after the fault occurred. Based on different fault angles, wavelet energy in corresponding frequency band was chosen to compare. The result was that wavelet energy in fault feeder was the largest of all, and it was larger than sum of those in other faultless feeders, when the bus broke down, the disparity between each wavelet energy was not significant. Fault line could be selected out by the criterion above. The results of MATLAB/simulink simulation experiment indicated that this method had anti-interference capacity and was feasible.
基金Projects(61004074,61134001,21076179)supported by the National Natural Science Foundation of ChinaProject(2009BAG12A08)supported by the National Key Technology Support Program of China+1 种基金Project(2010QNA5001)supported by the Fundamental Research Funds for the Central Universities of ChinaProjects(2012AA06A404,2006AA04Z184)supported by the National High Technology Research and Development Program of China
文摘The optimal transmission lines assignment with maximal reliabilities (OTLAMR) in the multi-source multi-sink multi-state computer network (MMMCN) was investigated. The OTLAMR problem contains two sub-problems: the MMMCN reliabilities evaluation and multi-objective transmission lines assignment optimization. First, a reliability evaluation with a transmission line assignment (RETLA) algorithm is proposed to calculate the MMMCN reliabilities under the cost constraint for a certain transmission lines configuration. Second, the non-dominated sorting genetic algorithm II (NSGA-II) is adopted to find the non-dominated set of the transmission lines assignments based on the reliabilities obtained from the RETLA algorithm. By combining the RETLA and the NSGA-II algorithms together, the RETLA-NSGA II algorithm is proposed to solve the OTLAMR problem. The experiments result show that the RETLA-NSGA II algorithm can provide efficient solutions in a reasonable time, from which the decision makers can choose the best solution based on their preferences and experiences.
文摘Line-of-sight clarity and assurance are essential because they are considered the golden rule in wireless network planning,allowing the direct propagation path to connect the transmitter and receiver and retain the strength of the signal to be received.Despite the increasing literature on the line of sight with different scenarios,no comprehensive study focuses on the multiplicity of parameters and basic concepts that must be taken into account when studying such a topic as it affects the results and their accuracy.Therefore,this research aims to find limited values that ensure that the signal reaches the future efficiently and enhances the accuracy of these values’results.We have designed MATLAB simulation and programming programs by Visual Basic.NET for a semi-realistic communication system.It includes all the basic parameters of this system,taking into account the environment’s diversity and the characteristics of the obstacle between the transmitting station and the receiving station.Then we verified the correctness of the system’s work.Moreover,we begin by analyzing and studying multiple and branching cases to achieve the goal.We get several values from the results,which are finite values,which are a useful reference for engineers and designers of wireless networks.
文摘A flat neural network is designed for the on line state prediction of engine. To reduce the computational cost of weight matrix, a fast recursive algorithm is derived according to the pseudoinverse formula of a partition matrix. Furthermore, the forgetting factor approach is introduced to improve predictive accuracy and robustness of the model. The experiment results indicate that the improved neural network is of good accuracy and strong robustness in prediction, and can apply for the on line prediction of nonlinear multi input multi output systems like vehicle engines.
基金Supported by the National Nature Science Foundation of China,the Research Foundation of General Corporation of China Petro-Chemical Industry and the Natural Science and Engineering Research Council of Canada.
文摘A strategy of developing on-line optimization intelligent systems based on combiningflowsheeting simulation and optimization package with artificial neural networks(ANN)is presented inthis paper.A number of optimization cases for a certain chemical plant are obtained off-line byusing PROCESS-Ⅱ or other flowsheeting programming with optimization.Then,taking these cases astraining examples,we establish a neural network systems which can be used on-line as an optimizer toobtain setpoints from input data sampled from distributed control system through gross error detectionand data reconciliation procedures.Such an on-line optimizer possesses two advantages over nonlinearprogramming package:first of all,there is no convergence problem for the trained ANN to be usedonline;secondly,the frequency for setpoints updating is not limited because only algebraic calculationrather than optimization is required to be carried out on-line.Here two key problems ofimplementing ANN approaches to the on-line optimization
文摘The theory of RC uniform ladder networks based upon the recurrence of voltage and cur-rent functions is extended as a vehicle to analyse the dynamic characteristics of reg lines. Meth-ods for computing the time constants and simplifying the transfer functions for reg lines are alsopresented.
文摘A new simple method in which arbitrary transfer function matrix is realized withactive multiple port network instead of computer simulating is proposed. The active multipleport network is carried on through state feedback and state cross output for RC ladder network.The main process is to determine coefficients of each adder. Finally, an example is given forillustration.
文摘Ground short circuit faults in current transmission lines are common in the power systems.In order to prevent the power system from aggravating the accident caused by short-circuit faults of transmission lines,a novel convolutional neural network(CNN)model is constructed to identify the short-circuit fault of the transmission line in the power system.The CNN model is mainly consisted of five convolutional layers,three max-pooling layers,one concatenate layer,one dropout layer,one fully connected layer,and a Softmax classifier.This method uses a fixed time window to intercept system short-circuit fault data,extracts the deep features of these data from the training samples,and then corresponds the extracted features to labels one-to-one.Finally,in PSCAD/EMTDC,the new England 10 machine 39 nodes are taken as an example to realize the simulation.The experimental results show that the CNN model can quickly and accurately identify the short-circuit fault types,and the optimal model accuracy rate reaches 99.95%.The results of this manuscript-have positive effect on enhancing the disaster prevention capability and the operation stability of transmission lines.
文摘A semi-analytical method in time domain is presented for analysis of the transient response of nonuniform transmission lines. In this method, the telegraph equations in time domain is differenced in space domain first, and is transformed into a set of first-order differential equations of voltage and current with respect to time. By integrating these differential equations with respect to time, and precise computation, the solution of these differential equations can be obtained. This method can solve the transient response of various kinds of transmission lines with arbitrary terminal networks. Particularly, it can analyze the nonuniform lines with initial conditions, for which there is no existing effective method to analyze the time response so far. The results obtained with this method are stable and accurate. Two examples are given to illustrate the application of this method.
文摘Integrating the power grid technology with renewable power generation technologies, Demand Response (DR) programs enabled by the Advanced Metering Infrastructure (AMI) were introduced into the power grid in the interest of both utilities and residents. They help to achieve load balance and increase the grid reliability by encouraging residents to reduce their power usage during peak load periods in return for incentives. To automate this process, appliances, in-house sensors, and the AMI controller need to be networked together. In this paper, we compare mainstream network technologies applicable to home appliance control and propose a solution combining Power Line Communication (PLC) with wireless communication in smart homes for the purpose of energy saving. We extended NS-2, a popular network simulator, to model such combined network scenarios. Using a number of different routing strategies, we then model and evaluate the network performance of DR programs in smart homes in such a combined network.
文摘When solving the routing problem with traditional ant colony algorithm, there is scarce in initialize pheromone and a slow convergence and stagnation for the complex network topology and the time-varying characteristics of channel in power line carrier communication of low voltage distribution grid. The algorithm is easy to fall into premature and local optimization. Proposed an automatic network algorithm based on improved transmission delay and the load factor as the evaluation factors. With the requirements of QoS, a logical topology of power line communication network is established. By the experiment of MATLAB simulation, verify that the improved Dynamic hybrid ant colony genetic algorithm (DH_ACGA) algorithm has improved the communication performance, which solved the QoS routing problems of power communication to some extent.
文摘In modem protection relays, the accurate and fast fault location is an essential task for transmission line protection from the point of service restoration and reliability. The applications of neural networks based fault location techniques to transmission line are available in many papers. However, almost all the studies have so far employed the FNN (feed-forward neural network) trained with back-propagation algorithm (BPNN) which has a better structure and been widely used. But there are still many drawbacks if we simply use feed-forward neural network, such as slow training rate, easy to trap into local minimum point, and bad ability on global search. In this paper, feed-forward neural network trained by PSO (particle swarm optimization) algorithm is proposed for fault location scheme in 500 kV transmission system with distributed parameters presentation, The purpose is to simulate distance protection relay. The algorithm acts as classifier which requires phasor measurements data from one end of the transmission line and DFT (discrete Fourier transform). Extensive simulation studies carried out using MATLAB show that the proposed scheme has the ability to give a good estimation of fault location under various fault conditions.
文摘This is an extended version of the same titled paper presented at the 21st CIRED. It discusses a new technique for identification and location of defective insulator strings in power lines based on the analysis of high frequency signals generated by corona effect. Damaged insulator strings may lead to loss of insulation and hence to the corona effect, in other words, to partial discharges. These partial discharges can be detected by a system composed of a capacitive coupling device (region between the phase and the metal body of a current transformer), a data acquisition board and a computer. Analyzing the waveform of these partial discharges through a neural network based software, it is possible to identify and locate the defective insulator string. This paper discusses how this software analysis works and why its technique is suitable for this application. Hence the results of key tests performed along the development are discussed, pointing out the main factors that affect their performance.
文摘Several industrial computers and a server are combined to set up the on-line monitoring and diagnostic system of turbo-generator sets. The main function of the system is to monitor machine sets' running condition. Through analyzing running data, technicians can detect whether there exist faults and where they occur. To share and transmit the dynamic information of the turbo-generator sets, a distributed network system is introduced. NetWare network operating system is used in the LAN (Local Area Network) system. The LAN is extended to realize the sharing of data and remote transmission of information. Furthermore, functions of monitoring and diagnostic clients are listed.
基金supported by the National Natural Science Foundation of China (No.62102046,62072249,62072056)JinWang,YongjunRen,and Jinbin Hu receive the grant,and the URLs to the sponsors’websites are https://www.nsfc.gov.cn/.This work is also funded by the National Science Foundation of Hunan Province (No.2022JJ30618,2020JJ2029).
文摘In the Ethernet lossless Data Center Networks (DCNs) deployedwith Priority-based Flow Control (PFC), the head-of-line blocking problemis still difficult to prevent due to PFC triggering under burst trafficscenarios even with the existing congestion control solutions. To addressthe head-of-line blocking problem of PFC, we propose a new congestioncontrol mechanism. The key point of Congestion Control Using In-NetworkTelemetry for Lossless Datacenters (ICC) is to use In-Network Telemetry(INT) technology to obtain comprehensive congestion information, which isthen fed back to the sender to adjust the sending rate timely and accurately.It is possible to control congestion in time, converge to the target rate quickly,and maintain a near-zero queue length at the switch when using ICC. Weconducted Network Simulator-3 (NS-3) simulation experiments to test theICC’s performance. When compared to Congestion Control for Large-ScaleRDMA Deployments (DCQCN), TIMELY: RTT-based Congestion Controlfor the Datacenter (TIMELY), and Re-architecting Congestion Managementin Lossless Ethernet (PCN), ICC effectively reduces PFC pause messages andFlow Completion Time (FCT) by 47%, 56%, 34%, and 15.3×, 14.8×, and11.2×, respectively.