With the construction of the Three Gorges Reservoir dam,frequent reservoir landslide events have been recorded.In recent years,multi-row stabilizing piles(MRSPs)have been used to stabilize massive reservoir landslides...With the construction of the Three Gorges Reservoir dam,frequent reservoir landslide events have been recorded.In recent years,multi-row stabilizing piles(MRSPs)have been used to stabilize massive reservoir landslides in China.In this study,two centrifuge model tests were carried out to study the unreinforced and MRSP-reinforced slopes subjected to reservoir water level(RWL)operation,using the Taping landslide as a prototype.The results indicate that the RWL rising can provide lateral support within the submerged zone and then produce the inward seepage force,eventually strengthening the slope stability.However,a rapid RWL drawdown may induce outward seepage forces and a sudden debuttressing effect,consequently reducing the effective soil normal stress and triggering partial pre-failure within the RWL fluctuation zone.Furthermore,partial deformation and subsequent soil structure damage generate excess pore water pressures,ultimately leading to the overall failure of the reservoir landslide.This study also reveals that a rapid increase in the downslope driving force due to RWL drawdown significantly intensifies the lateral earth pressures exerted on the MRSPs.Conversely,the MRSPs possess a considerable reinforcement effect on the reservoir landslide,transforming the overall failure into a partial deformation and failure situated above and in front of the MRSPs.The mechanical transfer behavior observed in the MRSPs demonstrates a progressive alteration in relation to RWL fluctuations.As the RWL rises,the mechanical states among MRSPs exhibit a growing imbalance.The shear force transfer factor(i.e.the ratio of shear forces on pile of the n th row to that of the first row)increases significantly with the RWL drawdown.This indicates that the mechanical states among MRSPs tend toward an enhanced equilibrium.The insights gained from this study contribute to a more comprehensive understanding of the failure mechanisms of reservoir landslides and the mechanical behavior of MRSPs in reservoir banks.展开更多
Based on the design of the multi-row sprocket with a new tooth profile,a cold semi-precision forging process for manufacturing 5052 aluminum alloy multi-row sprocket was presented.Through simulating the forging proces...Based on the design of the multi-row sprocket with a new tooth profile,a cold semi-precision forging process for manufacturing 5052 aluminum alloy multi-row sprocket was presented.Through simulating the forging process of 5052 aluminum alloy sprocket billet with 3D rigid-viscoplastic FEM,both the distributions of flow velocity field in axial(U_Z),radial(U_R) and circumferential(U_θ) directions and the curves of velocity component in different deformation regions were respectively obtained.By comparison and analysis of the velocity varying curves,the velocity component relation conditions for filling the die cavity were clarified.It shows that when the die cavity is almost fully filled,the circumferential velocity U_θ increases sharply,implying that U_θplays a key role in fully filling the die cavity.展开更多
The cold semi-precision forging of a multi-row sprocket was investigated using upper-bound (UB) and finite element methods combined with experiments. Based on the design of a new tooth profile for the sprocket, a co...The cold semi-precision forging of a multi-row sprocket was investigated using upper-bound (UB) and finite element methods combined with experiments. Based on the design of a new tooth profile for the sprocket, a cold semi-precision forging process and a kinematically admissible velocity field for filling the die cavity were proposed. Using the UB method, the velocity fields of the sprocket billet in the forming process were divided theoretically and calculated. The process of forging a multi-row sprocket was simulated using the FEM package Deform-3D V6.1 to obtain the distributions of the velocity field and the effective stress field in filling the die cavity. Similar to the simulated results, the experiment on cold forging a 5052 aluminum alloy sprocket was successfully performed. By comparing the calculated (UB method), experimental and simulated load-stroke curves, the calculated and simulated results were basically in accordance with the experimental results. The study provides a theoretical foundation for the development of the precision forging of multi-row sprockets.展开更多
The load distribution of multi-row bearings of large strip rolling mill is fully analyzed by 3D contact boundary element method (BEM). It is found out that bearings are frequently worn out due to serious uneven load...The load distribution of multi-row bearings of large strip rolling mill is fully analyzed by 3D contact boundary element method (BEM). It is found out that bearings are frequently worn out due to serious uneven load on the multi-row rollers. The constraint mechanism of the previous rolling system is found to be unreasonable by theoretical analysis on heavy machinery structure. A mechanism of self-aligning even load for workroll bearing of 2 050 mm hot rolling mill of Baoshan I&S Co. is developed. This device is manufactured with particular regard to the structure of 2 050 mm hot rolling mill mentioned above. Hence, uneven load on multi-row bearings is greatly relieved and their lives are remarkably prolonged. Meanwhile, theoretical analysis and on-spot tests prove the rationality and validity of the device.展开更多
Garden landscape is a beautiful complex formed by space and time complementing each other and acting together.Garden plants are the core landscaping elements in garden landscape construction.It is necessary to flexibl...Garden landscape is a beautiful complex formed by space and time complementing each other and acting together.Garden plants are the core landscaping elements in garden landscape construction.It is necessary to flexibly use a variety of plant landscaping methods to create a richer and more vivid natural landscape,and promote the improvement of the quality of the living environment and the harmonious coexistence between man and nature.展开更多
基金funded by Chongqing Natural Science Key Program of China(Grant No.cstc2020jcyj-zdxmX0019)China Geological Survey Program(Grant No.DD20190637/DD20221748).
文摘With the construction of the Three Gorges Reservoir dam,frequent reservoir landslide events have been recorded.In recent years,multi-row stabilizing piles(MRSPs)have been used to stabilize massive reservoir landslides in China.In this study,two centrifuge model tests were carried out to study the unreinforced and MRSP-reinforced slopes subjected to reservoir water level(RWL)operation,using the Taping landslide as a prototype.The results indicate that the RWL rising can provide lateral support within the submerged zone and then produce the inward seepage force,eventually strengthening the slope stability.However,a rapid RWL drawdown may induce outward seepage forces and a sudden debuttressing effect,consequently reducing the effective soil normal stress and triggering partial pre-failure within the RWL fluctuation zone.Furthermore,partial deformation and subsequent soil structure damage generate excess pore water pressures,ultimately leading to the overall failure of the reservoir landslide.This study also reveals that a rapid increase in the downslope driving force due to RWL drawdown significantly intensifies the lateral earth pressures exerted on the MRSPs.Conversely,the MRSPs possess a considerable reinforcement effect on the reservoir landslide,transforming the overall failure into a partial deformation and failure situated above and in front of the MRSPs.The mechanical transfer behavior observed in the MRSPs demonstrates a progressive alteration in relation to RWL fluctuations.As the RWL rises,the mechanical states among MRSPs exhibit a growing imbalance.The shear force transfer factor(i.e.the ratio of shear forces on pile of the n th row to that of the first row)increases significantly with the RWL drawdown.This indicates that the mechanical states among MRSPs tend toward an enhanced equilibrium.The insights gained from this study contribute to a more comprehensive understanding of the failure mechanisms of reservoir landslides and the mechanical behavior of MRSPs in reservoir banks.
基金Projects(51175363,51274149)supported by the National Natural Science Foundation of China
文摘Based on the design of the multi-row sprocket with a new tooth profile,a cold semi-precision forging process for manufacturing 5052 aluminum alloy multi-row sprocket was presented.Through simulating the forging process of 5052 aluminum alloy sprocket billet with 3D rigid-viscoplastic FEM,both the distributions of flow velocity field in axial(U_Z),radial(U_R) and circumferential(U_θ) directions and the curves of velocity component in different deformation regions were respectively obtained.By comparison and analysis of the velocity varying curves,the velocity component relation conditions for filling the die cavity were clarified.It shows that when the die cavity is almost fully filled,the circumferential velocity U_θ increases sharply,implying that U_θplays a key role in fully filling the die cavity.
文摘The cold semi-precision forging of a multi-row sprocket was investigated using upper-bound (UB) and finite element methods combined with experiments. Based on the design of a new tooth profile for the sprocket, a cold semi-precision forging process and a kinematically admissible velocity field for filling the die cavity were proposed. Using the UB method, the velocity fields of the sprocket billet in the forming process were divided theoretically and calculated. The process of forging a multi-row sprocket was simulated using the FEM package Deform-3D V6.1 to obtain the distributions of the velocity field and the effective stress field in filling the die cavity. Similar to the simulated results, the experiment on cold forging a 5052 aluminum alloy sprocket was successfully performed. By comparing the calculated (UB method), experimental and simulated load-stroke curves, the calculated and simulated results were basically in accordance with the experimental results. The study provides a theoretical foundation for the development of the precision forging of multi-row sprockets.
基金This project is supported by National Ninth-five Key Technologies R&D Program of China(No.9552801-0201)National Natural Science Foundation of China(No.50575155).
文摘The load distribution of multi-row bearings of large strip rolling mill is fully analyzed by 3D contact boundary element method (BEM). It is found out that bearings are frequently worn out due to serious uneven load on the multi-row rollers. The constraint mechanism of the previous rolling system is found to be unreasonable by theoretical analysis on heavy machinery structure. A mechanism of self-aligning even load for workroll bearing of 2 050 mm hot rolling mill of Baoshan I&S Co. is developed. This device is manufactured with particular regard to the structure of 2 050 mm hot rolling mill mentioned above. Hence, uneven load on multi-row bearings is greatly relieved and their lives are remarkably prolonged. Meanwhile, theoretical analysis and on-spot tests prove the rationality and validity of the device.
文摘Garden landscape is a beautiful complex formed by space and time complementing each other and acting together.Garden plants are the core landscaping elements in garden landscape construction.It is necessary to flexibly use a variety of plant landscaping methods to create a richer and more vivid natural landscape,and promote the improvement of the quality of the living environment and the harmonious coexistence between man and nature.