This paper presents the independent source tied photovoltaic (PV) based three-phase three-level diode-clamped-multilevel inverter (DCD-MLI) utilizing field programmable gate array (FPGA) controller. The maximum power ...This paper presents the independent source tied photovoltaic (PV) based three-phase three-level diode-clamped-multilevel inverter (DCD-MLI) utilizing field programmable gate array (FPGA) controller. The maximum power point (MPP) is tracked by using fuzzy logic algorithm. Employed for gating signal generation, the space vector modulation (SVM) strategy eradicates the complexity in determining the reference vector location, the ON-time calculations and switching state selection. A digital proportional integral (PI) control algorithm is implemented on a FPGA to keep the current injected into the independent source (grid) sinusoidal and to achieve high dynamic performance with low total harmonic distortion (THD) of output voltage and output current which are 0.97% and 1.26%. With the proposed configuration, the adjustments of modulation index and phase angle are synthesized onto a FPGA by means of hardware description language (VHDL). The efficacy of the scheme is verified through simulation study. To confirm the feasibility of the scheme, experimental studies are carried out on a scaled-down laboratory prototype.展开更多
Urban drainage pipe network is the backbone of urban drainage,flood control and water pollution prevention,and is also an essential symbol to measure the level of urban modernization.A large number of underground drai...Urban drainage pipe network is the backbone of urban drainage,flood control and water pollution prevention,and is also an essential symbol to measure the level of urban modernization.A large number of underground drainage pipe networks in aged urban areas have been laid for a long time and have reached or practically reached the service age.The repair of drainage pipe networks has attracted extensive attention from all walks of life.Since the Ministry of ecological environment and the national development and Reform Commission jointly issued the action plan for the Yangtze River Protection and restoration in 2019,various provinces in the Yangtze River Basin,such as Anhui,Jiangxi and Hunan,have extensively carried out PPp projects for urban pipeline restoration,in order to improve the quality and efficiency of sewage treatment.Based on the management practice of urban pipe network restoration project in Wuhu City,Anhui Province,this paper analyzes the problems of lengthy construction period and repeated operation caused by the mismatch between the design schedule of the restoration scheme and the construction schedule of the pipe network restoration in the existing project management mode,and proposes a model of urban drainage pipe network restoration scheme selection based on the improved support vector machine.The validity and feasibility of the model are analyzed and verified by collecting the data in the project practice.The research results show that the model has a favorable effect on the selection of urban drainage pipeline restoration schemes,and its accuracy can reach 90%.The research results can provide method guidance and technical support for the rapid decision-making of urban drainage pipeline restoration projects.展开更多
文摘This paper presents the independent source tied photovoltaic (PV) based three-phase three-level diode-clamped-multilevel inverter (DCD-MLI) utilizing field programmable gate array (FPGA) controller. The maximum power point (MPP) is tracked by using fuzzy logic algorithm. Employed for gating signal generation, the space vector modulation (SVM) strategy eradicates the complexity in determining the reference vector location, the ON-time calculations and switching state selection. A digital proportional integral (PI) control algorithm is implemented on a FPGA to keep the current injected into the independent source (grid) sinusoidal and to achieve high dynamic performance with low total harmonic distortion (THD) of output voltage and output current which are 0.97% and 1.26%. With the proposed configuration, the adjustments of modulation index and phase angle are synthesized onto a FPGA by means of hardware description language (VHDL). The efficacy of the scheme is verified through simulation study. To confirm the feasibility of the scheme, experimental studies are carried out on a scaled-down laboratory prototype.
基金supported by the Funds for the Anhui Provincial Science and Technology Innovation Strategy and Soft Science Research Project(Grant Number 202206f01050017)National Natural Science Foundation of China(Grant Number 72131006,6201101347,72071063)+3 种基金Fundamental Research Funds for the Central Universities(Grant Number JS2021ZSPY0037)Research Project of China Three Gorges Corporation(Grant Number 202103355)Yangtze Ecology and Environment Co.,Ltd.(Grant Number HB/AH2021039)Power China Huadong Engineering Corporation Limited(KY2019-ZD-03).
文摘Urban drainage pipe network is the backbone of urban drainage,flood control and water pollution prevention,and is also an essential symbol to measure the level of urban modernization.A large number of underground drainage pipe networks in aged urban areas have been laid for a long time and have reached or practically reached the service age.The repair of drainage pipe networks has attracted extensive attention from all walks of life.Since the Ministry of ecological environment and the national development and Reform Commission jointly issued the action plan for the Yangtze River Protection and restoration in 2019,various provinces in the Yangtze River Basin,such as Anhui,Jiangxi and Hunan,have extensively carried out PPp projects for urban pipeline restoration,in order to improve the quality and efficiency of sewage treatment.Based on the management practice of urban pipe network restoration project in Wuhu City,Anhui Province,this paper analyzes the problems of lengthy construction period and repeated operation caused by the mismatch between the design schedule of the restoration scheme and the construction schedule of the pipe network restoration in the existing project management mode,and proposes a model of urban drainage pipe network restoration scheme selection based on the improved support vector machine.The validity and feasibility of the model are analyzed and verified by collecting the data in the project practice.The research results show that the model has a favorable effect on the selection of urban drainage pipeline restoration schemes,and its accuracy can reach 90%.The research results can provide method guidance and technical support for the rapid decision-making of urban drainage pipeline restoration projects.