期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Pretreatment of hypersaline mustard wastewater with integrated bioreactor 被引量:3
1
作者 何强 张婷婷 +3 位作者 柴宏祥 杨士伟 周健 杜国军 《Journal of Central South University》 SCIE EI CAS 2012年第6期1673-1678,共6页
A full-scale experimental study of treating mustard wastewater by the integrated bioreactor with designed scale of 1 000 m3/d is conducted combined with a demonstration project. The systematical researches on the effi... A full-scale experimental study of treating mustard wastewater by the integrated bioreactor with designed scale of 1 000 m3/d is conducted combined with a demonstration project. The systematical researches on the efficiency of combined operation conditions of anaerobic-aerobic and anaerobic-aerobic-flocculation as well as chemical phosphorus removal of hypersaline mustard wastewater are conducted. The optimal operation condition and parameters in pretreatment of mustard wastewater in winter (the water temperature ranges 8-15 ~C) are determined: the anaerobic load is 3.0 kg (COD)/(m3.d), the average COD and phosphate concentration of the inflow are respectively 3 883 mg/L and 35.53 mg/L and the dosage of flocculent (PAC) is 400 mg/L. The anaerobic-aerobic-flocculation combined operation condition and postpositive phosphorous removal with ferrous sulfate are employed. After treatment, the COD of the effluent is 470 mg/L and the average phosphate concentration is 5.09 mg/L. The effluent could achieve the third-level of Integrated Wastewater Discharge Standard (GB 8978--1996). 展开更多
关键词 mustard wastewater aerobic treatment anaerobic treatment integrated bioreactor chemical phosphorus removal
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部