In the present paper the main results of the pre-operational studies related to the energization maneuver of a Half-Wavelength Transmission Line (AC-Link), are presented. The simulations were performed in PSCAD with a...In the present paper the main results of the pre-operational studies related to the energization maneuver of a Half-Wavelength Transmission Line (AC-Link), are presented. The simulations were performed in PSCAD with actual Brazilian system data. Specifically the following studies were performed: electromagnetic transient studies of energization maneuver considering no fault and the occurrence of fault along the trunk;dynamic analysis of generator units that will energize the AC-Link;TRV on the circuit-breaker that will energize the trunk. The main conclusion is that the AC-Link energization experiment can be implemented without jeopardizing or causing time-life reduction of the equipment involved in the experiment, which comprises the generator unit that will energize the trunk, the step-up transformer, the arresters that will be kept during the experiments, as well as the circuit-breaker that will energize and then trip the AC-Link.展开更多
基金supported CNPq,CAPES and FAPESP in Brazilthe project supported by ELETROBRAS/ELETRONORTE,ELETROBRAS/CHESF and ENTE as part of ANEEL(Brazilian Electrical Energy Regula-tory Agency)strategic project 2008(proc.4500072477).
文摘In the present paper the main results of the pre-operational studies related to the energization maneuver of a Half-Wavelength Transmission Line (AC-Link), are presented. The simulations were performed in PSCAD with actual Brazilian system data. Specifically the following studies were performed: electromagnetic transient studies of energization maneuver considering no fault and the occurrence of fault along the trunk;dynamic analysis of generator units that will energize the AC-Link;TRV on the circuit-breaker that will energize the trunk. The main conclusion is that the AC-Link energization experiment can be implemented without jeopardizing or causing time-life reduction of the equipment involved in the experiment, which comprises the generator unit that will energize the trunk, the step-up transformer, the arresters that will be kept during the experiments, as well as the circuit-breaker that will energize and then trip the AC-Link.