Purpose-The main objective of the present research is to investigate the benefits of using geogrid reinforcement in minimizing the rate of deterioration of ballasted rail track geometry resting on soft clay and to exp...Purpose-The main objective of the present research is to investigate the benefits of using geogrid reinforcement in minimizing the rate of deterioration of ballasted rail track geometry resting on soft clay and to explore the effect of load amplitude,load frequency,presence of geogrid layer in ballast layer and ballast layer thickness on the behavior of track system.These variables are studied both experimentally and numerically.This paper examines the effect of geogrid reinforced ballast laying on a layer of clayey soil as a subgrade layer,where a half full scale railway tests are conducted as well as a theoretical analysis is performed.Design/methodologylapproach-The experimental tests work consists of laboratory model tests to investigate the reduction in the compressibility and stress distribution induced in soft clay under a ballast railway reinforced by geogrid reinforcement subjected to dynamic load.Experimental model based on an approximate half scale for general rail track engineering practice is adopted in this study which is used in Iraqi railways.The investigated parameters are load amplitude,load frequency and presence of geogrid reinforcement layer.A half fuli-scale railway was constructed for carrying out the tests,which consists of two rails 800 mm in iength with three w00den sleepers(900 mm×90 mm×90 mm).The ballast was overlying 500 mm thick clay layer.The tests were carried out with and without geogrid reinforcement,the tests were carried out in a well tied steel box of 1.5 m length X 1 m width X 1 m height.A series of laboratory tests were conducted to investigate the response of the ballast and the clay layers where the ballast was reinforced by a geogrid.Settlement in ballast and clay,was measured in reinforced and unreinforced ballast cases.In addition to the laboratory tests,the application of numerical analysis was made by using the finite element program PLAXIS 3D 2013.Findings-It was concluded that the settlement increased with increasing the simulated train load amplitude,there is a sharp increase in settlement up to the cycle 500 and after that,there is a gradual increase to level out between,2,500 and 4,500 cycles depending on the load frequency.There is a little increase in the induced settlement when the load amplitude increased from 0.5 to i ton,but it is higher when the load amplitude increased to 2 ton,the increase in settlement depends on the geogrid existence and the other studied parameters.Both experimental and numerical results showed the same behavior.The effect of load frequency on the settlement ratio is almost constant after 500 cycles.In general,for reinforced cases,the effect of load frequency on the settlement ratio is very small ranging between 0.5 and 2%compared with the unreinforcedcase.Originalitylvalue-Increasing the ballast layer thickness from 20 cm to 30 cm leads to decrease the settlement by about 50%.This ascertains the efficiency of ballast in spreading the waves induced by the track.展开更多
The rapid growth in railway infrastructure and the construction of high-speed heavy-haul rail network,especially on ground that is basically unsuitable,poses challenges for geotechnical engineers because a large part ...The rapid growth in railway infrastructure and the construction of high-speed heavy-haul rail network,especially on ground that is basically unsuitable,poses challenges for geotechnical engineers because a large part of the money invested in the development of railway lines is often spent on track maintenance.In fact around the world,the mud pumping of subgrade fines is one of the common reasons why track performance deteriorates and track stability is hindered.This article presents a series of laboratory tests to examine following aspects of mud pumping:(1)the mechanisms of subgrade fluidisation under undrained condition,(2)the effects of mud pumping on the engineering characteristics of ballast,and(3)the use of vertical drains to stabilize subgrade under cyclic loads.The undrained cyclic triaxial testing on vulnerable soft subgrade was performed by varying the cyclic stress ratio(CSR)from 0.2 to 1.0 and the loading frequency f from 1.0 to 5.0 Hz.It is seen from the test results that for a specimen compacted at an initial dry density of 1790 kg/m3,the top portion of the specimen fluidises at CSR=0.5,irrespective of the applied loading frequency.Under cyclic railway loading,the internal redistribution of water at the top of the subgrade layer softens the soil and also reduces its stiffness.In response to these problems,this paper explains how the inclusion of vertical drains in soft subgrade will help to prevent mud pumping by alleviating the build-up of excess pore pressures under moving train loads.展开更多
A vehicle-track-bridge coupling dynamics model was built based on the theory of vehicle-track coupling dynamics. Using this model, a comparison was made between the dynamic response of an elastic sleeper ballasted tra...A vehicle-track-bridge coupling dynamics model was built based on the theory of vehicle-track coupling dynamics. Using this model, a comparison was made between the dynamic response of an elastic sleeper ballasted track and a common sleeper ballasted track on bridge under the same working conditions. The results show that laying elastic sleepers on the bridge could solve the problem of large track stiffness caused by a thin ballast thickness, and improve the dynamic response of the bridge. This is beneficial to train operation safety and riding comfort.展开更多
Considering the interaction between a sleeper,ballast layer,and substructure,a three-dimensional coupled discrete-finite element method for a ballasted railway track is proposed in this study.Ballast granules with irr...Considering the interaction between a sleeper,ballast layer,and substructure,a three-dimensional coupled discrete-finite element method for a ballasted railway track is proposed in this study.Ballast granules with irregular shapes are constructed using a clump model using the discrete element method.Meanwhile,concrete sleepers,embankments,and foundations are modelled using 20-node hexahedron solid elements using the finite element method.To improve computational efficiency,a GPU-based(Graphics Processing Unit)parallel framework is applied in the discrete element simulation.Additionally,an algorithm containing contact search and transfer parameters at the contact interface of discrete particles and finite elements is developed in the GPU parallel environment accordingly.A benchmark case is selected to verify the accuracy of the coupling algorithm.The dynamic response of the ballasted rail track is analysed under different train speeds and loads.Meanwhile,the dynamic stress on the substructure surface obtained by the established DEM-FEM model is compared with the in situ experimental results.Finally,stress and displacement contours in the cross-section of the model are constructed to further visualise the response of the ballasted railway.This proposed coupling model can provide important insights into high-performance coupling algorithms and the dynamic characteristics of full scale ballasted rail tracks.展开更多
Foamed Polyurethane Solidified Ballasted Track(FPSBT),an innovative railway track,is formed by solidifying ballast bed with foamed polyurethane.Compared with the traditional Discrete Ballasted Track(DBT),FPSBT does no...Foamed Polyurethane Solidified Ballasted Track(FPSBT),an innovative railway track,is formed by solidifying ballast bed with foamed polyurethane.Compared with the traditional Discrete Ballasted Track(DBT),FPSBT does not require regular maintenance such as tamping and cleaning.However,limited studies exist on the mechanical properties of FPSBT.In this study,Laboratory experiments are conducted on polyurethane samples to investigate the effects of polyurethane density on the mechanical properties of FPSBT.Furthermore,the performance of DBT and FPSBT with different polyurethane densities are compared,and the recommended polyurethane density is obtained.FPSBT exhibited negligible accumulation of deformation under cyclic loads,indicating excellent performance of FPSBT owing to the anti-deformation properties of polyurethane.Further,a track load vehicle test is conducted.FPSBT exhibited better load-transmitting ability than DBT.Finally,the construction and application of FPSBT in China are introduced.This study is expected to contribute to realizing a more extensive application of FPSBT.展开更多
Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast trac...Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement.展开更多
Frost heaving is a well-known phenomenon in cold regions, which may occur in wet clayey grounds during winter. Railway track upheaval occurring in cold regions during the winter is generally understood as frost heavin...Frost heaving is a well-known phenomenon in cold regions, which may occur in wet clayey grounds during winter. Railway track upheaval occurring in cold regions during the winter is generally understood as frost heaving in the subgrade layer. However, it has been confirmed that upheaval due to frost heaving sometimes occurs in the ballast layer. This un- derstanding has been observed in active railways in northern Japan. The samples collected from ballast and subgrade layers have been examined for frost heave susceptibilities and confirmed that ballast layers which contain fines may heave.展开更多
In Greece extended cracking of twin-block concrete sleepers (ties) and fouling of the ballast-bed were observed with implied problems of gauge widening and deterioration of track's geometry. This led to a ten-year ...In Greece extended cracking of twin-block concrete sleepers (ties) and fouling of the ballast-bed were observed with implied problems of gauge widening and deterioration of track's geometry. This led to a ten-year investigation program, during which a new method was developed for the estimation of actions on track panel as well as of the pressures / stresses that develop under the seating surface of the sleeper on the ballast-bed. Results from the tests performed on the ballast used in the Greek network are also presented, conducted in laboratories in France, Austria, and Greece. The influence of the actions -static and mainly dynamic- on the track response and the stress and strain of the ballast-bed are also discussed as derived from the tests and theoretical analysis.展开更多
Concrete slabs are widely used in modern railways to increase the inherent resilient quality of the tracks,provide safe and smooth rides,and reduce the maintenance frequency.In this paper,the elastic performance of a ...Concrete slabs are widely used in modern railways to increase the inherent resilient quality of the tracks,provide safe and smooth rides,and reduce the maintenance frequency.In this paper,the elastic performance of a novel slab trackform for high-speed railways is investigated using three-dimensional finite element modelling in Abaqus.It is then compared to the performance of a ballasted track.First,slab and ballasted track models are developed to replicate the full-scale testing of track sections.Once the models are calibrated with the experimental results,the novel slab model is developed and compared against the calibrated slab track results.The slab and ballasted track models are then extended to create linear dynamic models,considering the track geodynamics,and simulating train passages at various speeds,for which the Ledsgard documented case was used to validate the models.Trains travelling at low and high speeds are analysed to investigate the track deflections and the wave propagation in the soil,considering the issues associated with critical speeds.Various train loading methods are discussed,and the most practical approach is retained and described.Moreover,correlations are made between the geotechnical parameters of modern high-speed rail and conventional standards.It is found that considering the same ground condition,the slab track deflections are considerably smaller than those of the ballasted track at high speeds,while they show similar behaviour at low speeds.展开更多
The cross-level and twist irregularities are the most dangerous irregularity types that could cause wheel unloading with the risk of derailments and additional maintenance expenses.However,the mechanism of the irregul...The cross-level and twist irregularities are the most dangerous irregularity types that could cause wheel unloading with the risk of derailments and additional maintenance expenses.However,the mechanism of the irregularities initiation and development is unclear.The motivation of the present study was the previous experimental studies on the application of wide sleepers in the ballasted track.The long-term track geometry measurements with wide sleepers show an enormous reduction of the vertical longitudinal irregularities compared to the conventional track.However,wide sleepers had higher twist and cross-section level irregularities.The present paper aims to explain the phenomenon by discrete element method(DEM)modeling the development process of sleeper inhomogeneous support at cross-level depending on the sleeper form.The DEM simulations show that the maximal settlement intensity is up to 3.5 times lower for a wide sleeper in comparison with the conventional one.Nevertheless,the cross-level differential settlements are almost the same for both sleepers.The particle loading distribution after all loading cycles is concentrated on the smaller area,up to the half sleeper length,with fully unloaded zones under sleeper ends.Ballast flow limitation under the central part of the sleeper could improve the resilience of wide sleepers to the development of cross-level irregularities.The mechanism of initiation of the cross-level irregularity is proposed,which assumes the loss of sleeper support under sleeper ends.The further growth of inhomogeneous settlements along the sleeper is assumed as a result of the interaction of two processes:ballast flow due to dynamic impact during void closing and on the other side high pressure due to the concentration of the pressure under the middle part of the sleeper.The DEM simulation results support the assumption of the mechanism and agree with the experimental studies.展开更多
To get the influence of the randomness of longitudinal resistance of ballast bed (LRBB) on track-bridge interaction, the statistical law of LRBB was studied with existing test data and the Shapiro-Wilk test. Based on ...To get the influence of the randomness of longitudinal resistance of ballast bed (LRBB) on track-bridge interaction, the statistical law of LRBB was studied with existing test data and the Shapiro-Wilk test. Based on the principle of track-bridge interaction, a rail-sleeper-bridge-pier integrated simulation model that could consider the randomness of LRBB was established. Taking a continuous beam bridge for the heavy-haul railway as an example, the effect of the randomness of LRBB on the mechanical behavior of continuous welded rail (CWR) on bridges under typical conditions was carefully examined with a random sampling method and the simulation model. The results show that the LRBB corresponding sleeper displacement of 2 mm obeys a normal distribution. When the randomness of LRBB is considered, the amplitudes of rail expansion force, rail bending force, rail braking force and rail broken gap all follow normal distribution. As the standard deviations of the four indexes are small, which indicates the randomness of LRBB has little effect on track-bridge interaction. The distributions of the four indexes make it possible to design CWR on bridges with the limit state method.展开更多
In order to study the interaction between various fouling particles and ballast,a multi-layer and multi-scale discrete element model(DEM)including the sleeper,ballast bed and the surface layer of subgrade was develope...In order to study the interaction between various fouling particles and ballast,a multi-layer and multi-scale discrete element model(DEM)including the sleeper,ballast bed and the surface layer of subgrade was developed.Two typical fouling particles,the hard particles(sand)and soft ones(coal fines),are considered.A support stiffness test of the ballast bed under various fouling conditions was conducted to calibrate the microscopic parameters of the contact model.With the model,the influence of fouling particles on the mechanical behavior and deformation of the ballast bed was analyzed from macro and micro perspectives.The results show that the increase in the strength of the fouling particles enlarges the stiffness of the ballast bed.Hard particles increase the uniformity coefficient of the contact force bondγof ballast by 50.4%.Fouling particles increase the average stress in the subgrade,soft particles by 2 kPa and hard particles by 1 kPa.Hard particles can reduce the elasticity,plastic deformation and energy dissipation in the track structure.As the fouling particle changes from hard to soft,the proportion of the settlement in ballast bed increases to 40.5%and surface layer of swbgrade settlement decreases to 59.5%.Thus,the influence of fouling particles should be considered carefully in railway design and maintenance.展开更多
In this paper,the use of recycled tire-derived aggregates(TDA)mixed with ballast material is evaluated in order to reduce the train-induced ground-borne vibrations.For this purpose,a series of field vibration measurem...In this paper,the use of recycled tire-derived aggregates(TDA)mixed with ballast material is evaluated in order to reduce the train-induced ground-borne vibrations.For this purpose,a series of field vibration measurements has been carried out at an executed pilot track.The prepared ballast layer was mixed with different percentages of TDA in three sections.Moreover,another test section with pure ballast is considered as a reference.The vibrations generated by a motor-powered draisine at two different speeds are then recorded.Records of vibration data are provided using four seismometers placed once longitudinally and once transversely beside different sections.The outputs are then processed in both velocity–time and velocity–frequency domains.To verify the vibration mitigation performance of TDA in real operation conditions,field measurements under the passage of two planned passenger and freight trains are finally arranged.Results show that the best TDA mixture ratio,i.e.,10%by weight,can reduce the transmitted vibrations up to 12 dB for frequencies above 31.5 Hz.According to the obtained effi-ciency and the very low cost of the recycled materials,this solution can be considered as a competitive vibration countermeasure.展开更多
Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway...Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway track–subgrade system is developed in this paper,and its main functions for investigating the mechanical performance of track–subgrade systems are elaborated with three typical experimental examples.Comprising the full-scale subgrade structure and all the five types of track structures adopted in Chinese high-speed railways,namely the CRTS I,the CRTS II and the CRTS III ballastless tracks,the double-block ballastless track and the ballasted track,the test platform is established strictly according to the construction standard of Chinese high-speed railways.Three kinds of effective loading methods are employed,including the real bogie loading,multi-point loading and the impact loading.Various types of sensors are adopted in different components of the five types of track–subgrade systems to measure the displacement,acceleration,pressure,structural strain and deformation,etc.Utilizing this test platform,both dynamic characteristics and long-term performance evolution of high-speed railway track–subgrade systems can be investigated,being able to satisfy the actual demand for large-scale operation of Chinese high-speed railways.As examples,three typical experimental studies are presented to elucidate the comprehensive functionalities of the full-scale multi-functional test platform for exploring the dynamic performance and its long-term evolution of ballastless track systems and for studying the long-term accumulative settlement of the ballasted track–subgrade system in high-speed railways.Some interesting phenomena and meaningful results are captured by the developed test platform,which provide a useful guidance for the scientific operation and maintenance of high-speed railway infrastructure.展开更多
The deterioration of the sleeper support on the ballasted track begins with the accumulation of sleeper voids.The increased dynamic loading in the voided zone and the ballast contact conditions cause the accelerated g...The deterioration of the sleeper support on the ballasted track begins with the accumulation of sleeper voids.The increased dynamic loading in the voided zone and the ballast contact conditions cause the accelerated growth of the settlements in the voided zones,which results in the appearance of local instabilities like ballast breakdown,white spots,subgrade defects,etc.The recent detection and quantification of the sleeper voids with track-side and onboard monitoring can help to avoid or delay the development of local instabilities.The present paper is devoted to the study of the dynamic behavior of railway track with sleeper voids in the ballast breakdown zone.The result of the experimental track-side measurements of rail acceleration and deflection is presented.The analysis shows the existence of the dynamic impact during wheel entry in the voided zone.However,the measured dynamic impact is subjected to the bias of the track-side measurement method.Both the mechanism of the impact and the measurement aspects are explained by using the one-beam model on viscoelastic foundation.The void features in the dynamic behavior are analyzed for the purpose of track-side and onboard monitoring.A practical method of the void parameter quantification is proposed.展开更多
One of the major problems in ballasted railroads is ballast flying, which is the projection of ballast particles from the at-rest position as the train passes over the track of a railway structure, mainly due to high ...One of the major problems in ballasted railroads is ballast flying, which is the projection of ballast particles from the at-rest position as the train passes over the track of a railway structure, mainly due to high speed. In this research, the possibility of railway ballast flying for the double track Addis-Adama section of the new Addis-Djibouti railway line is assessed by determining the major causes of ballast flying and applying Discrete Element Modeling (DEM) with the aid of Particle Flow Code (PFC3D) software. The analysis comprised of an impact load and ballast material behavior which were used to determine the vibrational speed of individual ballast particles. The governing result from the series of discrete element analyses performed by considering fouled ballast gradation with grain-size diameter of 22.4 mm gives rise to a ballast maximum vibrational speed of 0.014 m/s. Since the ballast vibrational speed for Addis Ababa-Adama line is less than 0.02 m/s that is recommended by the literature, no ballast flight is expected under the present traffic and ballast conditions.展开更多
This paper is mainly aimed at the mechanics characteristic elas of ticity-plasticitystickiness existed in the CWR (continuously welded rails) track plane of the railway crushed stone ballast. As an important mechanics...This paper is mainly aimed at the mechanics characteristic elas of ticity-plasticitystickiness existed in the CWR (continuously welded rails) track plane of the railway crushed stone ballast. As an important mechanics parameter of the CWR track plane, the ballast resistance is mainly influenced by this mechanics characteristic. Through the systematic experimental research and the theoretical analysis, this mechanics characteristic of the ballast resistance is revealed and a reasonable theoretical model is built for it. This study set a sound foundation for further studying the CWR track deformation property. It will be beneficial to the development of high-speed railway in China.展开更多
As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detr...As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detrimental effects on train operation.However,the movement behavior remains ambiguous due to a lack of effective measurement approaches and analytical methods.In this study,an image-aided technique was developed in a full-scale model test using digital cameras and a colorbased identification approach.A total of 1274 surface ballast particles were manually dyed by discernible colors to serve as tracers in the test.The movements of the surface ballast particles were tracked using the varied pixels displaying tracers in the photos that were intermittently taken during the test in the perpendicular direction.The movement behavior of ballast particles under different combinations of train speeds and axle loads was quantitatively evaluated.The obtained results indicated that the surface ballast particle movements were slight,mainly concentrated near sleepers under low-speed train loads and greatly amplified and extended to the whole surface when the train speed reached 360 km.h-1.Additionally,the development of ballast particle displacement statistically resembled its rotation.Track vibration contributed to the movements of ballast particles,which specifically were driven by vertical acceleration near the track center and horizontal acceleration at the track edge.Furthermore,the development trends of ballast particle movements and track settlement under long-term train loading were similar,and both stabilized at nearly the same time.The track performance,including the vibration characteristics,accumulated settlement,and sleeper support stiffness,was determined to be closely related to the direction and distribution of ballast particle flow,which partly deteriorated under high-speed train loads.展开更多
Random vertical track irregularities are one of essential vibration sources in bridge, track structure and high-speed train systems. The common model of such irregularities is a stationary and ergodic Gaussian process...Random vertical track irregularities are one of essential vibration sources in bridge, track structure and high-speed train systems. The common model of such irregularities is a stationary and ergodic Gaussian process. The study presents the results of numerical dynamic analysis of advanced virtual models of composite BTT (bridge/ballasted track structure/high-speed train) systems. The analysis has been conducted for a series of types of single-span simply-supported railway composite (steel-concrete) bridges, with a symmetric platform, located on lines with ballasted track structure adapted for high-speed trains. The bridges are designed according to Polish bridge standards. A new methodology of numerical modeling and simulation of dynamic processes in BTT systems has been applied. The methodology takes into consideration viscoelastic suspensions of rail-vehicles, nonlinear Hertz wheel-rail contact stiffness and one-side wheel-rail contact, physically nonlinear elastic-damping properties of the track structure, random vertical track irregularities, approach slabs and other features. Computer algorithms of FE (finite element) modeling and simulation were programmed in Delphi. Both static and dynamic numerical investigations of the bridges forming the series of types have been carried out. It has been proved that in the case of common structural solutions of bridges and ballasted track structures, it is necessary to put certain limitations on operating speeds, macadam ballast and vertical track roughness.展开更多
文摘Purpose-The main objective of the present research is to investigate the benefits of using geogrid reinforcement in minimizing the rate of deterioration of ballasted rail track geometry resting on soft clay and to explore the effect of load amplitude,load frequency,presence of geogrid layer in ballast layer and ballast layer thickness on the behavior of track system.These variables are studied both experimentally and numerically.This paper examines the effect of geogrid reinforced ballast laying on a layer of clayey soil as a subgrade layer,where a half full scale railway tests are conducted as well as a theoretical analysis is performed.Design/methodologylapproach-The experimental tests work consists of laboratory model tests to investigate the reduction in the compressibility and stress distribution induced in soft clay under a ballast railway reinforced by geogrid reinforcement subjected to dynamic load.Experimental model based on an approximate half scale for general rail track engineering practice is adopted in this study which is used in Iraqi railways.The investigated parameters are load amplitude,load frequency and presence of geogrid reinforcement layer.A half fuli-scale railway was constructed for carrying out the tests,which consists of two rails 800 mm in iength with three w00den sleepers(900 mm×90 mm×90 mm).The ballast was overlying 500 mm thick clay layer.The tests were carried out with and without geogrid reinforcement,the tests were carried out in a well tied steel box of 1.5 m length X 1 m width X 1 m height.A series of laboratory tests were conducted to investigate the response of the ballast and the clay layers where the ballast was reinforced by a geogrid.Settlement in ballast and clay,was measured in reinforced and unreinforced ballast cases.In addition to the laboratory tests,the application of numerical analysis was made by using the finite element program PLAXIS 3D 2013.Findings-It was concluded that the settlement increased with increasing the simulated train load amplitude,there is a sharp increase in settlement up to the cycle 500 and after that,there is a gradual increase to level out between,2,500 and 4,500 cycles depending on the load frequency.There is a little increase in the induced settlement when the load amplitude increased from 0.5 to i ton,but it is higher when the load amplitude increased to 2 ton,the increase in settlement depends on the geogrid existence and the other studied parameters.Both experimental and numerical results showed the same behavior.The effect of load frequency on the settlement ratio is almost constant after 500 cycles.In general,for reinforced cases,the effect of load frequency on the settlement ratio is very small ranging between 0.5 and 2%compared with the unreinforcedcase.Originalitylvalue-Increasing the ballast layer thickness from 20 cm to 30 cm leads to decrease the settlement by about 50%.This ascertains the efficiency of ballast in spreading the waves induced by the track.
基金This research was supported by the Australian Government through the Australian Research Council’s Linkage Projects funding scheme(Project LP160101254)the Industrial Transformation Training Centre for Advanced Technologies in Rail Track Infrastructure(ITTC),University of WollongongThe financial and technical support from SMEC-Australia and ARTC(Australian Rail Track Corporation)is acknowledged.
文摘The rapid growth in railway infrastructure and the construction of high-speed heavy-haul rail network,especially on ground that is basically unsuitable,poses challenges for geotechnical engineers because a large part of the money invested in the development of railway lines is often spent on track maintenance.In fact around the world,the mud pumping of subgrade fines is one of the common reasons why track performance deteriorates and track stability is hindered.This article presents a series of laboratory tests to examine following aspects of mud pumping:(1)the mechanisms of subgrade fluidisation under undrained condition,(2)the effects of mud pumping on the engineering characteristics of ballast,and(3)the use of vertical drains to stabilize subgrade under cyclic loads.The undrained cyclic triaxial testing on vulnerable soft subgrade was performed by varying the cyclic stress ratio(CSR)from 0.2 to 1.0 and the loading frequency f from 1.0 to 5.0 Hz.It is seen from the test results that for a specimen compacted at an initial dry density of 1790 kg/m3,the top portion of the specimen fluidises at CSR=0.5,irrespective of the applied loading frequency.Under cyclic railway loading,the internal redistribution of water at the top of the subgrade layer softens the soil and also reduces its stiffness.In response to these problems,this paper explains how the inclusion of vertical drains in soft subgrade will help to prevent mud pumping by alleviating the build-up of excess pore pressures under moving train loads.
文摘A vehicle-track-bridge coupling dynamics model was built based on the theory of vehicle-track coupling dynamics. Using this model, a comparison was made between the dynamic response of an elastic sleeper ballasted track and a common sleeper ballasted track on bridge under the same working conditions. The results show that laying elastic sleepers on the bridge could solve the problem of large track stiffness caused by a thin ballast thickness, and improve the dynamic response of the bridge. This is beneficial to train operation safety and riding comfort.
基金supported by the National Natural Science Foundation of China(Grant Nos.11872136,11802146,11772085)the Fundamental Research Funds for the Central Universities(Grant Nos.DUT19GJ206,DUT19ZD207).
文摘Considering the interaction between a sleeper,ballast layer,and substructure,a three-dimensional coupled discrete-finite element method for a ballasted railway track is proposed in this study.Ballast granules with irregular shapes are constructed using a clump model using the discrete element method.Meanwhile,concrete sleepers,embankments,and foundations are modelled using 20-node hexahedron solid elements using the finite element method.To improve computational efficiency,a GPU-based(Graphics Processing Unit)parallel framework is applied in the discrete element simulation.Additionally,an algorithm containing contact search and transfer parameters at the contact interface of discrete particles and finite elements is developed in the GPU parallel environment accordingly.A benchmark case is selected to verify the accuracy of the coupling algorithm.The dynamic response of the ballasted rail track is analysed under different train speeds and loads.Meanwhile,the dynamic stress on the substructure surface obtained by the established DEM-FEM model is compared with the in situ experimental results.Finally,stress and displacement contours in the cross-section of the model are constructed to further visualise the response of the ballasted railway.This proposed coupling model can provide important insights into high-performance coupling algorithms and the dynamic characteristics of full scale ballasted rail tracks.
基金sponsored by the National Natural Science Foundation of China(Grant No.52278467)China State Railway Group Co.Ltd.(P2022G013)+1 种基金China Academy of Railway Sciences Co.Ltd.(2022QT002)the Beijing-Shanghai High Speed Railway Co.Ltd.(2022-16).
文摘Foamed Polyurethane Solidified Ballasted Track(FPSBT),an innovative railway track,is formed by solidifying ballast bed with foamed polyurethane.Compared with the traditional Discrete Ballasted Track(DBT),FPSBT does not require regular maintenance such as tamping and cleaning.However,limited studies exist on the mechanical properties of FPSBT.In this study,Laboratory experiments are conducted on polyurethane samples to investigate the effects of polyurethane density on the mechanical properties of FPSBT.Furthermore,the performance of DBT and FPSBT with different polyurethane densities are compared,and the recommended polyurethane density is obtained.FPSBT exhibited negligible accumulation of deformation under cyclic loads,indicating excellent performance of FPSBT owing to the anti-deformation properties of polyurethane.Further,a track load vehicle test is conducted.FPSBT exhibited better load-transmitting ability than DBT.Finally,the construction and application of FPSBT in China are introduced.This study is expected to contribute to realizing a more extensive application of FPSBT.
基金Project(50678176) supported by the National Natural Science Foundation of China
文摘Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement.
基金the engineers of the East Japan Railway Company and Hokkaido Railway Company who supported this study
文摘Frost heaving is a well-known phenomenon in cold regions, which may occur in wet clayey grounds during winter. Railway track upheaval occurring in cold regions during the winter is generally understood as frost heaving in the subgrade layer. However, it has been confirmed that upheaval due to frost heaving sometimes occurs in the ballast layer. This un- derstanding has been observed in active railways in northern Japan. The samples collected from ballast and subgrade layers have been examined for frost heave susceptibilities and confirmed that ballast layers which contain fines may heave.
文摘In Greece extended cracking of twin-block concrete sleepers (ties) and fouling of the ballast-bed were observed with implied problems of gauge widening and deterioration of track's geometry. This led to a ten-year investigation program, during which a new method was developed for the estimation of actions on track panel as well as of the pressures / stresses that develop under the seating surface of the sleeper on the ballast-bed. Results from the tests performed on the ballast used in the Greek network are also presented, conducted in laboratories in France, Austria, and Greece. The influence of the actions -static and mainly dynamic- on the track response and the stress and strain of the ballast-bed are also discussed as derived from the tests and theoretical analysis.
基金Engineering and Physical Sciences Research Council (EPSRC) is also acknowledged for funding this work under Grant Number EP/N009207/1.
文摘Concrete slabs are widely used in modern railways to increase the inherent resilient quality of the tracks,provide safe and smooth rides,and reduce the maintenance frequency.In this paper,the elastic performance of a novel slab trackform for high-speed railways is investigated using three-dimensional finite element modelling in Abaqus.It is then compared to the performance of a ballasted track.First,slab and ballasted track models are developed to replicate the full-scale testing of track sections.Once the models are calibrated with the experimental results,the novel slab model is developed and compared against the calibrated slab track results.The slab and ballasted track models are then extended to create linear dynamic models,considering the track geodynamics,and simulating train passages at various speeds,for which the Ledsgard documented case was used to validate the models.Trains travelling at low and high speeds are analysed to investigate the track deflections and the wave propagation in the soil,considering the issues associated with critical speeds.Various train loading methods are discussed,and the most practical approach is retained and described.Moreover,correlations are made between the geotechnical parameters of modern high-speed rail and conventional standards.It is found that considering the same ground condition,the slab track deflections are considerably smaller than those of the ballasted track at high speeds,while they show similar behaviour at low speeds.
文摘The cross-level and twist irregularities are the most dangerous irregularity types that could cause wheel unloading with the risk of derailments and additional maintenance expenses.However,the mechanism of the irregularities initiation and development is unclear.The motivation of the present study was the previous experimental studies on the application of wide sleepers in the ballasted track.The long-term track geometry measurements with wide sleepers show an enormous reduction of the vertical longitudinal irregularities compared to the conventional track.However,wide sleepers had higher twist and cross-section level irregularities.The present paper aims to explain the phenomenon by discrete element method(DEM)modeling the development process of sleeper inhomogeneous support at cross-level depending on the sleeper form.The DEM simulations show that the maximal settlement intensity is up to 3.5 times lower for a wide sleeper in comparison with the conventional one.Nevertheless,the cross-level differential settlements are almost the same for both sleepers.The particle loading distribution after all loading cycles is concentrated on the smaller area,up to the half sleeper length,with fully unloaded zones under sleeper ends.Ballast flow limitation under the central part of the sleeper could improve the resilience of wide sleepers to the development of cross-level irregularities.The mechanism of initiation of the cross-level irregularity is proposed,which assumes the loss of sleeper support under sleeper ends.The further growth of inhomogeneous settlements along the sleeper is assumed as a result of the interaction of two processes:ballast flow due to dynamic impact during void closing and on the other side high pressure due to the concentration of the pressure under the middle part of the sleeper.The DEM simulation results support the assumption of the mechanism and agree with the experimental studies.
文摘To get the influence of the randomness of longitudinal resistance of ballast bed (LRBB) on track-bridge interaction, the statistical law of LRBB was studied with existing test data and the Shapiro-Wilk test. Based on the principle of track-bridge interaction, a rail-sleeper-bridge-pier integrated simulation model that could consider the randomness of LRBB was established. Taking a continuous beam bridge for the heavy-haul railway as an example, the effect of the randomness of LRBB on the mechanical behavior of continuous welded rail (CWR) on bridges under typical conditions was carefully examined with a random sampling method and the simulation model. The results show that the LRBB corresponding sleeper displacement of 2 mm obeys a normal distribution. When the randomness of LRBB is considered, the amplitudes of rail expansion force, rail bending force, rail braking force and rail broken gap all follow normal distribution. As the standard deviations of the four indexes are small, which indicates the randomness of LRBB has little effect on track-bridge interaction. The distributions of the four indexes make it possible to design CWR on bridges with the limit state method.
基金Project(51978045) supported by the National Natural Science Foundation of ChinaProject([2017]7) supported by Shenshuo Science and Technology Development Project,China。
文摘In order to study the interaction between various fouling particles and ballast,a multi-layer and multi-scale discrete element model(DEM)including the sleeper,ballast bed and the surface layer of subgrade was developed.Two typical fouling particles,the hard particles(sand)and soft ones(coal fines),are considered.A support stiffness test of the ballast bed under various fouling conditions was conducted to calibrate the microscopic parameters of the contact model.With the model,the influence of fouling particles on the mechanical behavior and deformation of the ballast bed was analyzed from macro and micro perspectives.The results show that the increase in the strength of the fouling particles enlarges the stiffness of the ballast bed.Hard particles increase the uniformity coefficient of the contact force bondγof ballast by 50.4%.Fouling particles increase the average stress in the subgrade,soft particles by 2 kPa and hard particles by 1 kPa.Hard particles can reduce the elasticity,plastic deformation and energy dissipation in the track structure.As the fouling particle changes from hard to soft,the proportion of the settlement in ballast bed increases to 40.5%and surface layer of swbgrade settlement decreases to 59.5%.Thus,the influence of fouling particles should be considered carefully in railway design and maintenance.
文摘In this paper,the use of recycled tire-derived aggregates(TDA)mixed with ballast material is evaluated in order to reduce the train-induced ground-borne vibrations.For this purpose,a series of field vibration measurements has been carried out at an executed pilot track.The prepared ballast layer was mixed with different percentages of TDA in three sections.Moreover,another test section with pure ballast is considered as a reference.The vibrations generated by a motor-powered draisine at two different speeds are then recorded.Records of vibration data are provided using four seismometers placed once longitudinally and once transversely beside different sections.The outputs are then processed in both velocity–time and velocity–frequency domains.To verify the vibration mitigation performance of TDA in real operation conditions,field measurements under the passage of two planned passenger and freight trains are finally arranged.Results show that the best TDA mixture ratio,i.e.,10%by weight,can reduce the transmitted vibrations up to 12 dB for frequencies above 31.5 Hz.According to the obtained effi-ciency and the very low cost of the recycled materials,this solution can be considered as a competitive vibration countermeasure.
基金This work was supported by the National Natural Science Foundation of China[Grant Nos.11790283,51978587,51708457]the Program of Introducing Talents of Discipline to Universities(111 Project)[Grant No.B16041].
文摘Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway track–subgrade system is developed in this paper,and its main functions for investigating the mechanical performance of track–subgrade systems are elaborated with three typical experimental examples.Comprising the full-scale subgrade structure and all the five types of track structures adopted in Chinese high-speed railways,namely the CRTS I,the CRTS II and the CRTS III ballastless tracks,the double-block ballastless track and the ballasted track,the test platform is established strictly according to the construction standard of Chinese high-speed railways.Three kinds of effective loading methods are employed,including the real bogie loading,multi-point loading and the impact loading.Various types of sensors are adopted in different components of the five types of track–subgrade systems to measure the displacement,acceleration,pressure,structural strain and deformation,etc.Utilizing this test platform,both dynamic characteristics and long-term performance evolution of high-speed railway track–subgrade systems can be investigated,being able to satisfy the actual demand for large-scale operation of Chinese high-speed railways.As examples,three typical experimental studies are presented to elucidate the comprehensive functionalities of the full-scale multi-functional test platform for exploring the dynamic performance and its long-term evolution of ballastless track systems and for studying the long-term accumulative settlement of the ballasted track–subgrade system in high-speed railways.Some interesting phenomena and meaningful results are captured by the developed test platform,which provide a useful guidance for the scientific operation and maintenance of high-speed railway infrastructure.
基金The authors acknowledge the support of Swiss Federal Railways with the experimental measurements.
文摘The deterioration of the sleeper support on the ballasted track begins with the accumulation of sleeper voids.The increased dynamic loading in the voided zone and the ballast contact conditions cause the accelerated growth of the settlements in the voided zones,which results in the appearance of local instabilities like ballast breakdown,white spots,subgrade defects,etc.The recent detection and quantification of the sleeper voids with track-side and onboard monitoring can help to avoid or delay the development of local instabilities.The present paper is devoted to the study of the dynamic behavior of railway track with sleeper voids in the ballast breakdown zone.The result of the experimental track-side measurements of rail acceleration and deflection is presented.The analysis shows the existence of the dynamic impact during wheel entry in the voided zone.However,the measured dynamic impact is subjected to the bias of the track-side measurement method.Both the mechanism of the impact and the measurement aspects are explained by using the one-beam model on viscoelastic foundation.The void features in the dynamic behavior are analyzed for the purpose of track-side and onboard monitoring.A practical method of the void parameter quantification is proposed.
文摘One of the major problems in ballasted railroads is ballast flying, which is the projection of ballast particles from the at-rest position as the train passes over the track of a railway structure, mainly due to high speed. In this research, the possibility of railway ballast flying for the double track Addis-Adama section of the new Addis-Djibouti railway line is assessed by determining the major causes of ballast flying and applying Discrete Element Modeling (DEM) with the aid of Particle Flow Code (PFC3D) software. The analysis comprised of an impact load and ballast material behavior which were used to determine the vibrational speed of individual ballast particles. The governing result from the series of discrete element analyses performed by considering fouled ballast gradation with grain-size diameter of 22.4 mm gives rise to a ballast maximum vibrational speed of 0.014 m/s. Since the ballast vibrational speed for Addis Ababa-Adama line is less than 0.02 m/s that is recommended by the literature, no ballast flight is expected under the present traffic and ballast conditions.
文摘This paper is mainly aimed at the mechanics characteristic elas of ticity-plasticitystickiness existed in the CWR (continuously welded rails) track plane of the railway crushed stone ballast. As an important mechanics parameter of the CWR track plane, the ballast resistance is mainly influenced by this mechanics characteristic. Through the systematic experimental research and the theoretical analysis, this mechanics characteristic of the ballast resistance is revealed and a reasonable theoretical model is built for it. This study set a sound foundation for further studying the CWR track deformation property. It will be beneficial to the development of high-speed railway in China.
基金The financial supports from the National Natural Science Foundation of China(52008369,52125803,and 51988101)。
文摘As a core infrastructure of high-speed railways,ballast layers constituted by graded crushed stones feature noteworthy particle movement compared with normal railways,which may cause excessive settlement and have detrimental effects on train operation.However,the movement behavior remains ambiguous due to a lack of effective measurement approaches and analytical methods.In this study,an image-aided technique was developed in a full-scale model test using digital cameras and a colorbased identification approach.A total of 1274 surface ballast particles were manually dyed by discernible colors to serve as tracers in the test.The movements of the surface ballast particles were tracked using the varied pixels displaying tracers in the photos that were intermittently taken during the test in the perpendicular direction.The movement behavior of ballast particles under different combinations of train speeds and axle loads was quantitatively evaluated.The obtained results indicated that the surface ballast particle movements were slight,mainly concentrated near sleepers under low-speed train loads and greatly amplified and extended to the whole surface when the train speed reached 360 km.h-1.Additionally,the development of ballast particle displacement statistically resembled its rotation.Track vibration contributed to the movements of ballast particles,which specifically were driven by vertical acceleration near the track center and horizontal acceleration at the track edge.Furthermore,the development trends of ballast particle movements and track settlement under long-term train loading were similar,and both stabilized at nearly the same time.The track performance,including the vibration characteristics,accumulated settlement,and sleeper support stiffness,was determined to be closely related to the direction and distribution of ballast particle flow,which partly deteriorated under high-speed train loads.
文摘Random vertical track irregularities are one of essential vibration sources in bridge, track structure and high-speed train systems. The common model of such irregularities is a stationary and ergodic Gaussian process. The study presents the results of numerical dynamic analysis of advanced virtual models of composite BTT (bridge/ballasted track structure/high-speed train) systems. The analysis has been conducted for a series of types of single-span simply-supported railway composite (steel-concrete) bridges, with a symmetric platform, located on lines with ballasted track structure adapted for high-speed trains. The bridges are designed according to Polish bridge standards. A new methodology of numerical modeling and simulation of dynamic processes in BTT systems has been applied. The methodology takes into consideration viscoelastic suspensions of rail-vehicles, nonlinear Hertz wheel-rail contact stiffness and one-side wheel-rail contact, physically nonlinear elastic-damping properties of the track structure, random vertical track irregularities, approach slabs and other features. Computer algorithms of FE (finite element) modeling and simulation were programmed in Delphi. Both static and dynamic numerical investigations of the bridges forming the series of types have been carried out. It has been proved that in the case of common structural solutions of bridges and ballasted track structures, it is necessary to put certain limitations on operating speeds, macadam ballast and vertical track roughness.