This article presents an extensive examination and modeling of Capacitor Coupled Substations (CCS), noting some of their inherent constraints. The underlying implementation of a CCS is to supply electricity directly f...This article presents an extensive examination and modeling of Capacitor Coupled Substations (CCS), noting some of their inherent constraints. The underlying implementation of a CCS is to supply electricity directly from high-voltage (HV) transmission lines to low-voltage (LV) consumers through coupling capacitors and is said to be cost-effective as compared to conventional distribution networks. However, the functionality of such substations is susceptible to various transient phenomena, including ferroresonance and overvoltage occurrences. To address these challenges, the study uses simulations to evaluate the effectiveness of conventional resistor-inductor-capacitor (RLC) filter in mitigating hazardous overvoltage resulting from transients. The proposed methodology entails using standard RLC filter to suppress transients and its associated overvoltage risks. Through a series of MATLAB/Simulink simulations, the research emphasizes the practical effectiveness of this technique. The study examines the impact of transients under varied operational scenarios, including no-load switching conditions, temporary short-circuits, and load on/off events. The primary aim of the article is to assess the viability of using an established technology to manage system instabilities upon the energization of a CCS under no-load circumstances or in case of a short-circuit fault occurring on the primary side of the CCS distribution transformer. The findings underscore the effectiveness of conventional RLC filters in suppressing transients induced by the CCS no-load switching.展开更多
The access to electricity in rural areas is extremely limited, but it is crucial for all citizens. The population in rural areas of sub-Saharan African (SSA) countries is generally low, making it economically unfeasib...The access to electricity in rural areas is extremely limited, but it is crucial for all citizens. The population in rural areas of sub-Saharan African (SSA) countries is generally low, making it economically unfeasible to implement traditional rural electrification (CRE) projects due to the high cost of establishing the necessary distribution infrastructure. To address this cost issue, one alternative technology for rural electrification (URE) that can be explored is the Capacitor Coupled Substation (CCS) technology. CCS is a cost-effective solution for supplying electricity to rural areas. The research is necessitated by the need to offer a cost-effective technology for supplying electricity to sparsely populated communities. This paper examines the impact on the transmission network when a 400 kV/400V CCS is connected to it. The system response when a CCS is connected to the network was modeled using MATLAB/Si-mulink. The results, based on the fixed load of 80 kW, showed negligible interference on the transmission line voltage. However, there was minor impact on the parameters downstream of the tapping point. These findings were further supported by introducing a fault condition to the CCS, which showed that interferences with the CCS could affect the overall stability of the transmission network downstream of the tapping node, similar to the behavior of an unstable load.展开更多
Holding the greatest power transmission capacity in China, Three Gorges power transmission and substation (T&S) project is an important landmark in the
Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and e...Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and electrical product of the Ministry of Machinery Industry as well. It has been awarded the honor of first grade factory in the competition for key and major project construction in Shanghai year by year,展开更多
Recently, most electric power substations have adopted production control systems, such as SCADA systems, which communicate with field devices and remotely control processes from a computer screen. However, these syst...Recently, most electric power substations have adopted production control systems, such as SCADA systems, which communicate with field devices and remotely control processes from a computer screen. However, these systems together with protection measures and additional control actions (using protocol IEC61850) seem not to be enough to free substations of security attacks (e.g. virus, intruders, forgery or unauthorized data manipulation). This paper analyzes the main features of an electric power substation together with the aspects that might be significantly affected by cyber-attacks. The paper also presents the implementation of a specific security system (i.e. firewall-wise system) intended to protect a target distribution network.展开更多
The intelligent substation relay protection facility is a fundamental element in construction of modern power system,based on the principles of flexibility,security and accuracy,and it can be divided into process laye...The intelligent substation relay protection facility is a fundamental element in construction of modern power system,based on the principles of flexibility,security and accuracy,and it can be divided into process layer and substation layer according to specific equipment.The former is suitable for individual sampling of disposable equipment,can be separated from the base station synchronization sampling,with the help of synchronous digital system and ping-pong algorithm to achieve synchronization of the overall sampling,that is to take the distribution protection components,through the separate transmission medium to realize the information transmission;the latter is for variable power plant components centralized backup protection,taking online real-time tuning technique.展开更多
该文基于信息系统物理化的设想提出电力信息物理系统(cyber-physical power system,CPPS)中的信息流建模和计算分析方法。采用连续时间函数来刻画信息流的特征,并定义信息网络运行参数为流量累积函数、信息流速和时延。首先,基于遍历法...该文基于信息系统物理化的设想提出电力信息物理系统(cyber-physical power system,CPPS)中的信息流建模和计算分析方法。采用连续时间函数来刻画信息流的特征,并定义信息网络运行参数为流量累积函数、信息流速和时延。首先,基于遍历法搜索出信息流路径,建立信息流速矩阵的范式;然后利用改进的网络演算(network calculus,NC)特性赋值流速矩阵的元素;进一步采用流量累积函数表征信源数据发送规律,从而显式求解时延上界。最后将提出的信息流建模方法应用于智能变电站自动化系统的时延计算,通过与OPNET的仿真结果相比较,验证所提出模型的有效性,而且该方法可以提供定量分析指标以优化变电站组网方案设计中的信息流分布。展开更多
文摘This article presents an extensive examination and modeling of Capacitor Coupled Substations (CCS), noting some of their inherent constraints. The underlying implementation of a CCS is to supply electricity directly from high-voltage (HV) transmission lines to low-voltage (LV) consumers through coupling capacitors and is said to be cost-effective as compared to conventional distribution networks. However, the functionality of such substations is susceptible to various transient phenomena, including ferroresonance and overvoltage occurrences. To address these challenges, the study uses simulations to evaluate the effectiveness of conventional resistor-inductor-capacitor (RLC) filter in mitigating hazardous overvoltage resulting from transients. The proposed methodology entails using standard RLC filter to suppress transients and its associated overvoltage risks. Through a series of MATLAB/Simulink simulations, the research emphasizes the practical effectiveness of this technique. The study examines the impact of transients under varied operational scenarios, including no-load switching conditions, temporary short-circuits, and load on/off events. The primary aim of the article is to assess the viability of using an established technology to manage system instabilities upon the energization of a CCS under no-load circumstances or in case of a short-circuit fault occurring on the primary side of the CCS distribution transformer. The findings underscore the effectiveness of conventional RLC filters in suppressing transients induced by the CCS no-load switching.
文摘The access to electricity in rural areas is extremely limited, but it is crucial for all citizens. The population in rural areas of sub-Saharan African (SSA) countries is generally low, making it economically unfeasible to implement traditional rural electrification (CRE) projects due to the high cost of establishing the necessary distribution infrastructure. To address this cost issue, one alternative technology for rural electrification (URE) that can be explored is the Capacitor Coupled Substation (CCS) technology. CCS is a cost-effective solution for supplying electricity to rural areas. The research is necessitated by the need to offer a cost-effective technology for supplying electricity to sparsely populated communities. This paper examines the impact on the transmission network when a 400 kV/400V CCS is connected to it. The system response when a CCS is connected to the network was modeled using MATLAB/Si-mulink. The results, based on the fixed load of 80 kW, showed negligible interference on the transmission line voltage. However, there was minor impact on the parameters downstream of the tapping point. These findings were further supported by introducing a fault condition to the CCS, which showed that interferences with the CCS could affect the overall stability of the transmission network downstream of the tapping node, similar to the behavior of an unstable load.
文摘Holding the greatest power transmission capacity in China, Three Gorges power transmission and substation (T&S) project is an important landmark in the
文摘Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and electrical product of the Ministry of Machinery Industry as well. It has been awarded the honor of first grade factory in the competition for key and major project construction in Shanghai year by year,
文摘Recently, most electric power substations have adopted production control systems, such as SCADA systems, which communicate with field devices and remotely control processes from a computer screen. However, these systems together with protection measures and additional control actions (using protocol IEC61850) seem not to be enough to free substations of security attacks (e.g. virus, intruders, forgery or unauthorized data manipulation). This paper analyzes the main features of an electric power substation together with the aspects that might be significantly affected by cyber-attacks. The paper also presents the implementation of a specific security system (i.e. firewall-wise system) intended to protect a target distribution network.
文摘The intelligent substation relay protection facility is a fundamental element in construction of modern power system,based on the principles of flexibility,security and accuracy,and it can be divided into process layer and substation layer according to specific equipment.The former is suitable for individual sampling of disposable equipment,can be separated from the base station synchronization sampling,with the help of synchronous digital system and ping-pong algorithm to achieve synchronization of the overall sampling,that is to take the distribution protection components,through the separate transmission medium to realize the information transmission;the latter is for variable power plant components centralized backup protection,taking online real-time tuning technique.
文摘该文基于信息系统物理化的设想提出电力信息物理系统(cyber-physical power system,CPPS)中的信息流建模和计算分析方法。采用连续时间函数来刻画信息流的特征,并定义信息网络运行参数为流量累积函数、信息流速和时延。首先,基于遍历法搜索出信息流路径,建立信息流速矩阵的范式;然后利用改进的网络演算(network calculus,NC)特性赋值流速矩阵的元素;进一步采用流量累积函数表征信源数据发送规律,从而显式求解时延上界。最后将提出的信息流建模方法应用于智能变电站自动化系统的时延计算,通过与OPNET的仿真结果相比较,验证所提出模型的有效性,而且该方法可以提供定量分析指标以优化变电站组网方案设计中的信息流分布。