期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
General hybrid projective complete dislocated synchronization with non-derivative and derivative coupling based on parameter identification in several chaotic and hyperchaotic systems
1
作者 孙军伟 沈轶 +2 位作者 张国东 王延峰 崔光照 《Chinese Physics B》 SCIE EI CAS CSCD 2013年第4期185-195,共11页
According to the Lyapunov stability theorem, a new general hybrid projective complete dislocated synchronization scheme with non-derivative and derivative coupling based on parameter identification is proposed under t... According to the Lyapunov stability theorem, a new general hybrid projective complete dislocated synchronization scheme with non-derivative and derivative coupling based on parameter identification is proposed under the framework of drive-response systems. Every state variable of the response system equals the summation of the hybrid drive systems in the previous hybrid synchronization. However, every state variable of the drive system equals the summation of the hybrid response systems while evolving with time in our method. Complete synchronization, hybrid dislocated synchronization, projective synchronization, non-derivative and derivative coupling, and parameter identification are included as its special item. The Lorenz chaotic system, Rssler chaotic system, memristor chaotic oscillator system, and hyperchaotic Lü system are discussed to show the effectiveness of the proposed methods. 展开更多
关键词 complete dislocated synchronization parameter identification non-derivative and derivative coupling memristor chaotic oscillator system
下载PDF
Synergic Effect of Reworking for Imperfect Quality Items with the Integration of Multi-Period Delay-in-Payment and Partial Backordering in Global Supply Chains
2
作者 Waqas Ahmed Muhammad Moazzam +1 位作者 Biswajit Sarkar Saif Ur Rehman 《Engineering》 SCIE EI 2021年第2期260-271,共12页
In intercontinental trade and economics goods are bought from a global supplier.On occasion,the expected lot may include a fraction of defective items.These imperfect items still have worth and can be sold to customer... In intercontinental trade and economics goods are bought from a global supplier.On occasion,the expected lot may include a fraction of defective items.These imperfect items still have worth and can be sold to customers after repair.It is cost-effective and sustainable to rework such items in nearby repair workshops rather than return them.The reworked items can be returned from the workshop to the buyer when shortages are equal to the quantity of imperfect items.In the meantime,the supplier correspondingly deals a multi-period delay-in-payments strategy with purchaser.The entire profit has been maximized with paybacks for interim financing.This study aims to develop a synergic inventory model to get the most profit by making an allowance for reworking,multi-period delay-in-payments policy,and shortages.The findings of the proposed model augment inventory management performance by monitoring cycle time as well as fraction of phase with optimistic inventory for a supply chain.The results demonstrate that profit is smaller if the permitted period given by supplier to buyer is equal to or greater than the cycle time,and profit is greater if the permitted period is smaller than the cycle time.The algebraic method is engaged to make a closed system optimum solution.The mathematical experiment of this study is constructed to provide management insights and tangible practices. 展开更多
关键词 Imperfect items REWORK Shortages Multi-period delay-in-payments non-derivative methodology
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部