期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Study of Multistage Project Risk Identification-Assessment Process Based on Objective Orientation
1
作者 YANG Cai-xia, XU Yu (School of Management, Xi’an Jiaotong University, Xi’an 710049, China) 《厦门大学学报(自然科学版)》 CAS CSCD 北大核心 2002年第S1期242-243,共2页
Risk management of projects is about the real time ev aluation and making of decisions proactively in order to maximize the probabilit y of achieving or surpassing the targets set for project objectives. Project objec... Risk management of projects is about the real time ev aluation and making of decisions proactively in order to maximize the probabilit y of achieving or surpassing the targets set for project objectives. Project objective generally includes three elements: time, cost, quality. Risk occurrin g in the projects will affect these three factors to some various degrees in the end. There are different emphases in each stage and integrated balanced goals b etween the three factors. A large complex engineering project generally consists of several stages each of which has variable objective combinations leading to variable important risks. In order to achieve strategic goals on the schedule under the restriction of lim ited resources, the paper gives the analysis of the so-called risk identificati on-assessment process on the basis of objective orientation. In this paper the set of involved mostly hazards is presented in terms of given objective weight v ector, and so is the model of risk ranking .By reducing the range of risk factor s step by step, risk manager could pay more attention to important ventures and effectively control of them. According to different objective combination at different stages, primary risk f actor sets at different stages are given. With the probability and their various effects to project objectives, evaluation of these sets is made aiming to r educing of the scope of risks and providing decision maker with a better decisio ns support. Successful projects are those, which focus on the relevant business objectives t hroughout the whole process and seek to information integration across project l ife cycle. This paper also introduces the idea of real time process of risk iden tification-assessment and presents a flow chart as a demonstration. 展开更多
关键词 risk identification-assessment project objectiv e objective weight vector risk ranking
下载PDF
QoS Routing Algorithm with Multi-Dimensions for Overlay Networks 被引量:1
2
作者 戴慧珺 曲桦 赵季红 《China Communications》 SCIE CSCD 2013年第10期167-176,共10页
Overlay networks have emerged as a useful approach to providing a general framework for new applications and services that are to be implemented without significantly changing the IP-layer network infrastructure.Overl... Overlay networks have emerged as a useful approach to providing a general framework for new applications and services that are to be implemented without significantly changing the IP-layer network infrastructure.Overlay routing has been used as an alternative to the default best effort Internet routing for the absence of end-to-end Quality of Service(QoS). While the former has recently been investigated, the conflict of QoS restraints and resource optimization remains unsolved. Recent studies have shown that overlay paths can give better latency, loss rate and TCP throughput. In this paper, a multi-dimensional QoS objective model based on the analysis of multiple QoS constraints has been presented, and a routing algorithm to optimise the overlay resource of its nodes and links is then proposed.In fact, the algorithm obtained multiple QoS values using probability theory to achieve the routing according to the multi-dimensional QoS objective vector of the QoS objective model. Simulation results reveals that the algorithm works better than other existing algorithms in balancing the network resources, and applications with stringent QoS requirements could be run. 展开更多
关键词 OVERLAYS QoS routing multi-di- mensional QoS objective model multi-dimensional QoS objective vector
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部