期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Application of Risk Probability Evaluation Method to Offshore Platform Construction 被引量:5
1
作者 余建星 谭振东 《Transactions of Tianjin University》 EI CAS 2005年第4期303-307,共5页
Offshore project risk concerns many influence factors with complex relationship, and traditional methods cannot be used for the evaluation on risk probability. To deal with this problem, a new method was developed by ... Offshore project risk concerns many influence factors with complex relationship, and traditional methods cannot be used for the evaluation on risk probability. To deal with this problem, a new method was developed by the combination of improved technique for order preference by similarity ideal solution method, analytical hierarchy process method and the network response surface method. The risk probability was calculated by adopting network response surface analysis based on the state variable of a known event and its degree of membership.This quantification method was applied to an offshore platform project, Bonan oil and gas field project in Bohai Bay in June 2004.There were 7 sub-projects and each includes 4 risk factors.The values of 28 risk factors, ranging from 10^-6 to 10^-4, were achieved. This precision conforms to the international principle of as low as reasonably practically.The evaluation indicates that the values of comprehensive level of construction group and ability of technical personnel on the spot are relatively high among all risk factors, so these two factors should be paid more attention to in offshore platform construction. 展开更多
关键词 offshore platform construction quantitative risk analysis risk probability network response surface
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部