In recent decades, tokamak discharges with zero total toroidal current have been reported in tokamak experiments, and this is one of the key problems in alternating current(AC) operations.An efficient free-boundary eq...In recent decades, tokamak discharges with zero total toroidal current have been reported in tokamak experiments, and this is one of the key problems in alternating current(AC) operations.An efficient free-boundary equilibrium code is developed to investigate such advanced tokamak discharges with current reversal equilibrium configuration. The calculation results show that the reversal current equilibrium can maintain finite pressure and also has considerable effects on the position of the X-point and the magnetic separatrix shape, and hence also on the position of the strike point on the divertor plates, which is extremely useful for magnetic design, MHD stability analysis, and experimental data analysis etc. for the AC plasma current operation on tokamaks.展开更多
Concentrate copper grade(CCG)is one of the important production indicators of copper flotation processes,and keeping the CCG at the set value is of great significance to the economic benefit of copper flotation indust...Concentrate copper grade(CCG)is one of the important production indicators of copper flotation processes,and keeping the CCG at the set value is of great significance to the economic benefit of copper flotation industrial processes.This paper addresses the fluctuation problem of CCG through an operational optimization method.Firstly,a density-based affinity propagationalgorithm is proposed so that more ideal working condition categories can be obtained for the complex raw ore properties.Next,a Bayesian network(BN)is applied to explore the relationship between the operational variables and the CCG.Based on the analysis results of BN,a weighted Gaussian process regression model is constructed to predict the CCG that a higher prediction accuracy can be obtained.To ensure the predicted CCG is close to the set value with a smaller magnitude of the operation adjustments and a smaller uncertainty of the prediction results,an index-oriented adaptive differential evolution(IOADE)algorithm is proposed,and the convergence performance of IOADE is superior to the traditional differential evolution and adaptive differential evolution methods.Finally,the effectiveness and feasibility of the proposed methods are verified by the experiments on a copper flotation industrial process.展开更多
Due to the impact of source-load prediction power errors and uncertainties,the actual operation of the park will have a wide range of fluctuations compared with the expected state,resulting in its inability to achieve...Due to the impact of source-load prediction power errors and uncertainties,the actual operation of the park will have a wide range of fluctuations compared with the expected state,resulting in its inability to achieve the expected economy.This paper constructs an operating simulation model of the park power grid operation considering demand response and proposes a multi-time scale operating simulation method that combines day-ahead optimization and model predictive control(MPC).In the day-ahead stage,an operating simulation plan that comprehensively considers the user’s side comfort and operating costs is proposed with a long-term time scale of 15 min.In order to cope with power fluctuations of photovoltaic,wind turbine and conventional load,MPC is used to track and roll correct the day-ahead operating simulation plan in the intra-day stage to meet the actual operating operation status of the park.Finally,the validity and economy of the operating simulation strategy are verified through the analysis of arithmetic examples.展开更多
We describe a 63-year-old male who appears to have undergone an early form of the arterial switch operation for D-transposition of the great arteries performed in the mid-1960s.We review the clinical and imaging data ...We describe a 63-year-old male who appears to have undergone an early form of the arterial switch operation for D-transposition of the great arteries performed in the mid-1960s.We review the clinical and imaging data that support our conclusion.He had a diagnostic cardiac catheterization which demonstrated severe pulmonary hypertension responsive to epoprostenol and oxygen.Our case may represent one example of the experimental surgical work done prior to Dr.Adibe Jatene’s description of thefirst successful arterial switch performed in 1975.展开更多
The weapon and equipment operational requirement analysis(WEORA) is a necessary condition to win a future war,among which the acquisition of knowledge about weapons and equipment is a great challenge. The main challen...The weapon and equipment operational requirement analysis(WEORA) is a necessary condition to win a future war,among which the acquisition of knowledge about weapons and equipment is a great challenge. The main challenge is that the existing weapons and equipment data fails to carry out structured knowledge representation, and knowledge navigation based on natural language cannot efficiently support the WEORA. To solve above problem, this research proposes a method based on question answering(QA) of weapons and equipment knowledge graph(WEKG) to construct and navigate the knowledge related to weapons and equipment in the WEORA. This method firstly constructs the WEKG, and builds a neutral network-based QA system over the WEKG by means of semantic parsing for knowledge navigation. Finally, the method is evaluated and a chatbot on the QA system is developed for the WEORA. Our proposed method has good performance in the accuracy and efficiency of searching target knowledge, and can well assist the WEORA.展开更多
With the advent of Industry 4.0, smart construction sites have seen significant development in China. However, accidents involving digitized tower cranes continue to be a persistent issue. Among the contributing facto...With the advent of Industry 4.0, smart construction sites have seen significant development in China. However, accidents involving digitized tower cranes continue to be a persistent issue. Among the contributing factors, human unsafe behavior stands out as a primary cause for these incidents. This study aims to assess the human reliability of tower crane operations on smart construction sites. To proactively enhance safety measures, the research employs text mining techniques (TF-IDF-Truncated SVD-Complement NB) to identify patterns of human errors among tower crane operators. Building upon the SHEL model, the study categorizes behavioral factors affecting human reliability in the man-machine interface, leading to the establishment of the Performance Shaping Factors (PSFs) system. Furthermore, the research constructs an error impact indicator system for the intelligent construction site tower crane operator interface. Using the DEMATEL method, it analyzes the significance of various factors influencing human errors in tower crane operations. Additionally, the ISM-MICMAC method is applied to unveil the hierarchical relationships and driving-dependent connections among these influencing factors. The findings indicate that personal state, operating procedures, and physical environment directly impact human errors, while personal capability, technological environment, and one fundamental organizational management factor contribute indirectly. .展开更多
This article proposes a comprehensive monitoring system for tunnel operation to address the risks associated with tunnel operations.These risks include safety control risks,increased traffic flow,extreme weather event...This article proposes a comprehensive monitoring system for tunnel operation to address the risks associated with tunnel operations.These risks include safety control risks,increased traffic flow,extreme weather events,and movement of tectonic plates.The proposed system is based on the Internet of Things and artificial intelligence identification technology.The monitoring system will cover various aspects of tunnel operations,such as the slope of the entrance,the structural safety of the cave body,toxic and harmful gases that may appear during operation,excessively high and low-temperature humidity,poor illumination,water leakage or road water accumulation caused by extreme weather,combustion and smoke caused by fires,and more.The system will enable comprehensive monitoring and early warning of fire protection systems,accident vehicles,and overheating vehicles.This will effectively improve safety during tunnel operation.展开更多
Objective:To explore the clinical benefits achieved by implementing the operating room nursing cooperation path for patients undergoing laparoscopic hysterectomy.Methods:64 laparoscopic hysterectomy cases were divided...Objective:To explore the clinical benefits achieved by implementing the operating room nursing cooperation path for patients undergoing laparoscopic hysterectomy.Methods:64 laparoscopic hysterectomy cases were divided into groups according to the order of admission.The control group received routine perioperative care.The observation group implemented the nursing cooperation path in the operating room on the same basis as the control group.The two groups’physiological responses,stimulus indicators,anxiety,and complication rates were compared.Results:The heart rate,blood pressure 0.5 hours after surgery,anxiety scores 1 day before and 3 days after surgery,and the total number of complications in the observation group were all lower than those in the control group(P<0.05).Conclusion:The development of a nursing cooperation path in the operating room can help patients undergoing laparoscopic hysterectomy reduce heart rate,blood pressure,stress responses,and the risk of complications,and is worthy of promotion.展开更多
Rail transit is considered one of the safest and most efficient modes of transportation.Ticketing,vehicle dispatching,and passenger flow control during rail transit operations in China have been improving over the yea...Rail transit is considered one of the safest and most efficient modes of transportation.Ticketing,vehicle dispatching,and passenger flow control during rail transit operations in China have been improving over the years.Smart city construction and intelligent management models has also been increasingly emphasized with the rapid development of information and internet technology.Therefore,it is essential to conduct relevant research and discussions to improve the overall efficiency and quality of urban rail transit operation and management.This article provides an overview of smart city rail transit operation and management informatization,the principles of construction,and the functions of smart city rail transit operation and management informatization.Additionally,it discusses the strategies for the construction of smart city rail transit operation and management information and its development prospects.展开更多
Radical operation for hilar cholangiocarcinoma(HCCA)is the most effective treatment,but high rates of severe postoperative complication and death remain concerns due to the complexity of biliary and vascular anatomy o...Radical operation for hilar cholangiocarcinoma(HCCA)is the most effective treatment,but high rates of severe postoperative complication and death remain concerns due to the complexity of biliary and vascular anatomy of the hepatobiliary region.De-layed arterial hemorrhage(DAH)occurring>24 h postoperatively usually causes life-threatening bleeding,and relaparotomy for DAH would be difficult and hazardous because of postoperative adhe-sions and critical general condition.As endovascular technique is less invasive and has improved over the recent decades,clini-cians have begun to prefer endovascular treatment(EVT)to surgi-cal treatment of DAH after hepatobiliary pancreatic surgery.How-ever,to our knowledge,a relatively large series of patients dealing with the outcomes of EVT of DAH after surgery for HCCA has not been reported.Herein,we analyzed the technical and clinical out-comes of EVT in 17 patients to evaluate the efficacy and safety of EVT.展开更多
Patent foramen ovale(PFO)is a remnant of normal fetal anatomy,which occurs in about 20%–25%of cases.Patients with PFO are at increased risk for migraine,acute limb ischemia secondary to emboli and cryptogenic(no othe...Patent foramen ovale(PFO)is a remnant of normal fetal anatomy,which occurs in about 20%–25%of cases.Patients with PFO are at increased risk for migraine,acute limb ischemia secondary to emboli and cryptogenic(no other identifiable cause)stroke.The traditional approach has been to use a fluoroscopically guided blocking device,but this is contraindicated in patients with severe allergies to contrast media or inability to undergo angiography.With the advancements in technology,ultrasonic robotic systems have become available for medical procedures.In the current study,we reported a case of using the ultrasonic robotic teleoperation system to achieve closure of PFO at the Chinese PLA General Hospital,Beijing,China.展开更多
BACKGROUND Endoscopic submucosal dissection(ESD)is a treatment for early gastric cancer with the advantages of small invasion,fewer complications,and a low local recurrence rate.However,there is a high risk of complic...BACKGROUND Endoscopic submucosal dissection(ESD)is a treatment for early gastric cancer with the advantages of small invasion,fewer complications,and a low local recurrence rate.However,there is a high risk of complications such as bleeding and perforation,and the operation time is also longer.ESD operation time is closely related to bleeding and perforation.AIM To investigate the influencing factors associated with ESD operation time and postoperative delayed hemorrhage to provide a reference for early planning,early identification,and prevention of complications.METHODS We conducted a retrospective study based on the clinical data of 520 patients with early gastric cancer in the Second Affiliated Hospital of Hainan Medical University from January 2019 to December 2021.The baseline data,clinical features,and endoscopic and pathological characteristics of patients were collected.The multivariate linear regression model was used to investigate the influencing factors of ESD operation time.Logistic regression analysis was carried out to evaluate the influencing factors of postoperative delayed hemorrhage.RESULTS The multivariate analysis of ESD operation time showed that the maximum lesion diameter could affect 8.815%of ESD operation time when other influencing factors remained unchanged.The operation time increased by 3.766%or 10.247%if the lesion was mixed or concave.The operation time increased by 4.417%if combined with an ulcer or scar.The operation time increased by 3.692%if combined with perforation.If infiltrated into the submucosa,it increased by 2.536%.Multivariate analysis of delayed hemorrhage after ESD showed that the maximum diameter of the lesion,lesion morphology,and ESD operation time were independent influencing factors for delayed hemorrhage after ESD.Patients with lesion≥3.0 cm(OR=3.785,95%CI:1.165-4.277),lesion morphology-concave(OR=10.985,95%CI:2.133-35.381),and ESD operation time≥60 min(OR=2.958,95%CI:1.117-3.526)were prone to delayed hemorrhage after ESD.CONCLUSION If the maximum diameter of the lesion in patients with early gastric cancer is≥3.0 cm,and the shape of the lesion is concave,or accompanied by an ulcer or scar,combined with perforation,and infiltrates into the submucosa,the ESD operation will take a longer time.When the maximum diameter of the lesion is≥3.0 cm,the shape of the lesion is concave in patients and the operation time of ESD takes longer time,the risk of delayed hemorrhage after ESD is higher.展开更多
Pipelines are widely used for transporting oil resources in the context of offshore oil exploitation.The pipeline stress-strength analysis is an important stage in related design and ensuing construction techniques.In...Pipelines are widely used for transporting oil resources in the context of offshore oil exploitation.The pipeline stress-strength analysis is an important stage in related design and ensuing construction techniques.In this study,assuming representative work environment parameters,pipeline lifting operations are investigated numerically.More specifically,a time-domain coupled dynamic analysis method is used to conduct a hydrodynamic analysis under different current velocities and wave heights.The results show that proper operation requires the lifting points are reasonably set in combination with the length of the pipeline and the position of the lifting device on the construction ship.The impact of waves on the pipeline is limited,however lifting operations under strong wind and waves should be avoided as far as possible.展开更多
With the rapid development of informatization,autonomy and intelligence,unmanned swarm formation intelligent operations will become the main combat mode of future wars.Typical unmanned swarm formations such as ground-...With the rapid development of informatization,autonomy and intelligence,unmanned swarm formation intelligent operations will become the main combat mode of future wars.Typical unmanned swarm formations such as ground-based directed energy weapon formations,space-based kinetic energy weapon formations,and sea-based carrier-based formations have become the trump card for winning future wars.In a complex confrontation environment,these sophisticated weapon formation systems can precisely strike mobile threat group targets,making them extreme deterrents in joint combat applications.Based on this,first,this paper provides a comprehensive summary of the outstanding advantages,strategic position and combat style of unmanned clusters in joint warfare to highlight their important position in future warfare.Second,a detailed analysis of the technological breakthroughs in four key areas,situational awareness,heterogeneous coordination,mixed combat,and intelligent assessment of typical unmanned aerial vehicle(UAV)swarms in joint warfare,is presented.An in-depth analysis of the UAV swarm communication networking operating mechanism during joint warfare is provided to lay the theoretical foundation for subsequent cooperative tracking and control.Then,an indepth analysis of the shut-in technology requirements of UAV clusters in joint warfare is provided to lay a theoretical foundation for subsequent cooperative tracking control.Finally,the technical requirements of UAV clusters in joint warfare are analysed in depth so the key technologies can form a closed-loop kill chain system and provide theoretical references for the study of intelligent command operations.展开更多
The Red-Thai Binh River system is an important water resource to the Northern Delta, serving the development of agriculture, people’s livelihood and other economic sectors through its upstream reservoirs and a system...The Red-Thai Binh River system is an important water resource to the Northern Delta, serving the development of agriculture, people’s livelihood and other economic sectors through its upstream reservoirs and a system of water abstraction works along the rivers. However, due to the impact of climate change and pressure from socio-economic development, the operation of the reservoir system according to Decision No. 740/QD-TTg was issued on June 17, 2019 by the Prime Minister of Government promulgating the Red-Thai Binh River system inter-reservoir operation rules (Operation rules 740) has some shortcomings that need adjustments for higher water use efficiency, meeting downstream water demand and power generation benefits. Through the results of water balance calculation and analysis of economic benefits from water use scenarios, this research proposed adjustment to the inter-reservoir operation during dry season in the Red River system. The result showed that an average water level of 1.0 - 1.7 m should be maintained at Hanoi during the increased release period.展开更多
Ergonomic reliability plays a significant role in the safe operation of devices.With the spread of infectious diseases around the world,in work environments with high loads and high infection rates,medical staff work ...Ergonomic reliability plays a significant role in the safe operation of devices.With the spread of infectious diseases around the world,in work environments with high loads and high infection rates,medical staff work in a state of high self-protection.The use of visual display terminal(VDT)for medical equipment has undergone fundamental changes,and the traditional medical equipment human-machine interface design needs to be improved.After the completion of design and development,a VDT design enters the experimental testing stage,which has significant limitations for simulating the work of medical staff in the high-load and high-infection environments.The testing cost is high,and subjects face harsh conditions;thus,an ergonomic reliability model that can predict the use of VDT in such special high-infection and high-load circumstances must be established.An ergonomic reliability model based on an improved backpropagation neural network(BPNN)and human cognition reliability(HCR)is proposed for predicting and evaluating operation flows according tomedical equipment VDTs.Firstly,a small data sample can be used to train BPNN to generate a network that can ensure suitable accuracy.To prevent the model from falling into local optimal solutions,the bat algorithm is introduced to improve the BPNN.Compared to a traditional BPNN,the superiority of the improved BPNN is clearly demonstrated.Secondly,the HCR method is used to analyze and highlight changes in the human factor reliability of VDTs for medical equipment in different time processes and operating processes according to BPNN prediction results,to provide a reference for selecting the optimalmethod.Finally,the validity and availability of the proposedmethod are verified through an eye tracker experiment and statistical analysis results.展开更多
Introduction:We sought to investigate whether the development of sub-pulmonic systolic anterior motion(SAM)may be inherent to the anatomy of the the mitral valve(MV)or affected by external factors,such as a dilated ri...Introduction:We sought to investigate whether the development of sub-pulmonic systolic anterior motion(SAM)may be inherent to the anatomy of the the mitral valve(MV)or affected by external factors,such as a dilated right ventricle or chest abnormalities in d-looped transposition of the great arteries post atrial switch operation(d-TGA/AtS).Methods:Analysis was performed of clinical and cardiac imaging studies acquired on 19 adult patients with d-TGA/AtS(age 42±6 years old,56%male)between 2015–2019.Echocardiography data included mitral apparatus anatomy,and CT/MRI data included biventricular dimensions,function,and Haller index(HI)for pectus deformity.Results:Patients with leaflet SAM(n=6)compared to patients without SAM(n=13)had higher MV protrusion height(2.3±0.5 vs.1.5±0.4 cm,p≤0.01)and longer anterior MV leaflet length(3.1±0.4 cm vs.2.6±0.3 cm p≤0.05),when compared to those without.CT/MRI showed higher sub-pulmonic left ventricular ejection fraction(LVEF)in the SAM group(71%±8%vs.54%±7%,respectively).RV size and function,significant chest deformity(HI>3.5),presence of a ventricular lead pacemaker,and septal thickness did not play a role in development of SAM.Conclusions:An elongated mitral apparatus is associated with the development of SAM,and the development of left ventricular outflow tract obstruction(LVOTO),in d-TGA/AtS.LV hyperkinesia is associated with SAM.Systemic RV dimensions,septal thickness,and degree of chest deformity did not differ significantly between subjects with SAM and those without.展开更多
This study proposes a novel form of environmental reservoir operation through integrating environmental flow supply,drought analysis,and evolutionary optimization.This study demonstrates that simultaneous supply of do...This study proposes a novel form of environmental reservoir operation through integrating environmental flow supply,drought analysis,and evolutionary optimization.This study demonstrates that simultaneous supply of downstream environmental flow of reservoir as well as water demand is challenging in the semi-arid area especially in dry years.In this study,water supply and environmental flow supply were 40%and 30%in the droughts,respectively.Moreover,mean errors of supplying water demand as well as environmental flow in dry years were 6 and 9 m3/s,respectively.Hence,these results highlight that ecological stresses of the downstream aquatic habitats as well as water supply loss are considerably escalated in dry years,which implies even using environmental optimal operation is not able to protect downstream aquatic habitats properly in the severe droughts.Moreover,available storage in reservoir will be remarkably reduced(averagely more than 30×106 m3 compared with optimal storage equal to 70×106 m3),which implies strategic storage of reservoir might be threatened.Among used evolutionary algorithms,particle swarm optimization(PSO)was selected as the best algorithm for solving the novel proposed objective function.The significance of this study is to propose a novel objective function to optimize reservoir operation in which environmental flow supply is directly addressed and integrated with drought analysis.This novel form of optimization system can overcome uncertainties of the conventional objective function due to considering environmental flow in the objective function as well as drought analysis in the context of reservoir operation especially applicable in semi-arid areas.The results indicate that using either other water resources for water supply or reducing water demand is the only solution for managing downstream ecological impacts of the river ecosystem.In other words,the results highlighted that replanning of water resources in the study area is necessary.Replacing the conventional optimization system for reservoir operation in the semi-arid area with proposed optimization system is recommendable to minimize the negotiations between stakeholders and environmental managers.展开更多
New fractional operators, the COVID-19 model has been studied in this paper. By using different numericaltechniques and the time fractional parameters, the mechanical characteristics of the fractional order model arei...New fractional operators, the COVID-19 model has been studied in this paper. By using different numericaltechniques and the time fractional parameters, the mechanical characteristics of the fractional order model areidentified. The uniqueness and existence have been established. Themodel’sUlam-Hyers stability analysis has beenfound. In order to justify the theoretical results, numerical simulations are carried out for the presented methodin the range of fractional order to show the implications of fractional and fractal orders.We applied very effectivenumerical techniques to obtain the solutions of themodel and simulations. Also, we present conditions of existencefor a solution to the proposed epidemicmodel and to calculate the reproduction number in certain state conditionsof the analyzed dynamic system. COVID-19 fractional order model for the case of Wuhan, China, is offered foranalysis with simulations in order to determine the possible efficacy of Coronavirus disease transmission in theCommunity. For this reason, we employed the COVID-19 fractal fractional derivative model in the example ofWuhan, China, with the given beginning conditions. In conclusion, again the mathematical models with fractionaloperators can facilitate the improvement of decision-making for measures to be taken in the management of anepidemic situation.展开更多
Based on an analysis of the operational control behavior of operation experts on energy-intensive equipment,this paper proposes an intelligent control method for low-carbon operation by combining mechanism analysis wi...Based on an analysis of the operational control behavior of operation experts on energy-intensive equipment,this paper proposes an intelligent control method for low-carbon operation by combining mechanism analysis with deep learning,linking control and optimization with prediction,and integrating decision-making with control.This method,which consists of setpoint control,self-optimized tuning,and tracking control,ensures that the energy consumption per tonne is as low as possible,while remaining within the target range.An intelligent control system for low-carbon operation is developed by adopting the end-edge-cloud collaboration technology of the Industrial Internet.The system is successfully applied to a fused magnesium furnace and achieves remarkable results in reducing carbon emissions.展开更多
基金supported by National Natural Science Foundation of China (No. 12075276)partly by the Comprehensive Research Facility for Fusion Technology Program of China (No. 2018000052-73-01-001228)。
文摘In recent decades, tokamak discharges with zero total toroidal current have been reported in tokamak experiments, and this is one of the key problems in alternating current(AC) operations.An efficient free-boundary equilibrium code is developed to investigate such advanced tokamak discharges with current reversal equilibrium configuration. The calculation results show that the reversal current equilibrium can maintain finite pressure and also has considerable effects on the position of the X-point and the magnetic separatrix shape, and hence also on the position of the strike point on the divertor plates, which is extremely useful for magnetic design, MHD stability analysis, and experimental data analysis etc. for the AC plasma current operation on tokamaks.
基金supported in part by the National Key Research and Development Program of China(2021YFC2902703)the National Natural Science Foundation of China(62173078,61773105,61533007,61873049,61873053,61703085,61374147)。
文摘Concentrate copper grade(CCG)is one of the important production indicators of copper flotation processes,and keeping the CCG at the set value is of great significance to the economic benefit of copper flotation industrial processes.This paper addresses the fluctuation problem of CCG through an operational optimization method.Firstly,a density-based affinity propagationalgorithm is proposed so that more ideal working condition categories can be obtained for the complex raw ore properties.Next,a Bayesian network(BN)is applied to explore the relationship between the operational variables and the CCG.Based on the analysis results of BN,a weighted Gaussian process regression model is constructed to predict the CCG that a higher prediction accuracy can be obtained.To ensure the predicted CCG is close to the set value with a smaller magnitude of the operation adjustments and a smaller uncertainty of the prediction results,an index-oriented adaptive differential evolution(IOADE)algorithm is proposed,and the convergence performance of IOADE is superior to the traditional differential evolution and adaptive differential evolution methods.Finally,the effectiveness and feasibility of the proposed methods are verified by the experiments on a copper flotation industrial process.
基金supported by the Science and Technology Project of State Grid Shanxi Electric Power Research Institute:Research on Data-Driven New Power System Operation Simulation and Multi Agent Control Strategy(52053022000F).
文摘Due to the impact of source-load prediction power errors and uncertainties,the actual operation of the park will have a wide range of fluctuations compared with the expected state,resulting in its inability to achieve the expected economy.This paper constructs an operating simulation model of the park power grid operation considering demand response and proposes a multi-time scale operating simulation method that combines day-ahead optimization and model predictive control(MPC).In the day-ahead stage,an operating simulation plan that comprehensively considers the user’s side comfort and operating costs is proposed with a long-term time scale of 15 min.In order to cope with power fluctuations of photovoltaic,wind turbine and conventional load,MPC is used to track and roll correct the day-ahead operating simulation plan in the intra-day stage to meet the actual operating operation status of the park.Finally,the validity and economy of the operating simulation strategy are verified through the analysis of arithmetic examples.
文摘We describe a 63-year-old male who appears to have undergone an early form of the arterial switch operation for D-transposition of the great arteries performed in the mid-1960s.We review the clinical and imaging data that support our conclusion.He had a diagnostic cardiac catheterization which demonstrated severe pulmonary hypertension responsive to epoprostenol and oxygen.Our case may represent one example of the experimental surgical work done prior to Dr.Adibe Jatene’s description of thefirst successful arterial switch performed in 1975.
文摘The weapon and equipment operational requirement analysis(WEORA) is a necessary condition to win a future war,among which the acquisition of knowledge about weapons and equipment is a great challenge. The main challenge is that the existing weapons and equipment data fails to carry out structured knowledge representation, and knowledge navigation based on natural language cannot efficiently support the WEORA. To solve above problem, this research proposes a method based on question answering(QA) of weapons and equipment knowledge graph(WEKG) to construct and navigate the knowledge related to weapons and equipment in the WEORA. This method firstly constructs the WEKG, and builds a neutral network-based QA system over the WEKG by means of semantic parsing for knowledge navigation. Finally, the method is evaluated and a chatbot on the QA system is developed for the WEORA. Our proposed method has good performance in the accuracy and efficiency of searching target knowledge, and can well assist the WEORA.
文摘With the advent of Industry 4.0, smart construction sites have seen significant development in China. However, accidents involving digitized tower cranes continue to be a persistent issue. Among the contributing factors, human unsafe behavior stands out as a primary cause for these incidents. This study aims to assess the human reliability of tower crane operations on smart construction sites. To proactively enhance safety measures, the research employs text mining techniques (TF-IDF-Truncated SVD-Complement NB) to identify patterns of human errors among tower crane operators. Building upon the SHEL model, the study categorizes behavioral factors affecting human reliability in the man-machine interface, leading to the establishment of the Performance Shaping Factors (PSFs) system. Furthermore, the research constructs an error impact indicator system for the intelligent construction site tower crane operator interface. Using the DEMATEL method, it analyzes the significance of various factors influencing human errors in tower crane operations. Additionally, the ISM-MICMAC method is applied to unveil the hierarchical relationships and driving-dependent connections among these influencing factors. The findings indicate that personal state, operating procedures, and physical environment directly impact human errors, while personal capability, technological environment, and one fundamental organizational management factor contribute indirectly. .
文摘This article proposes a comprehensive monitoring system for tunnel operation to address the risks associated with tunnel operations.These risks include safety control risks,increased traffic flow,extreme weather events,and movement of tectonic plates.The proposed system is based on the Internet of Things and artificial intelligence identification technology.The monitoring system will cover various aspects of tunnel operations,such as the slope of the entrance,the structural safety of the cave body,toxic and harmful gases that may appear during operation,excessively high and low-temperature humidity,poor illumination,water leakage or road water accumulation caused by extreme weather,combustion and smoke caused by fires,and more.The system will enable comprehensive monitoring and early warning of fire protection systems,accident vehicles,and overheating vehicles.This will effectively improve safety during tunnel operation.
文摘Objective:To explore the clinical benefits achieved by implementing the operating room nursing cooperation path for patients undergoing laparoscopic hysterectomy.Methods:64 laparoscopic hysterectomy cases were divided into groups according to the order of admission.The control group received routine perioperative care.The observation group implemented the nursing cooperation path in the operating room on the same basis as the control group.The two groups’physiological responses,stimulus indicators,anxiety,and complication rates were compared.Results:The heart rate,blood pressure 0.5 hours after surgery,anxiety scores 1 day before and 3 days after surgery,and the total number of complications in the observation group were all lower than those in the control group(P<0.05).Conclusion:The development of a nursing cooperation path in the operating room can help patients undergoing laparoscopic hysterectomy reduce heart rate,blood pressure,stress responses,and the risk of complications,and is worthy of promotion.
文摘Rail transit is considered one of the safest and most efficient modes of transportation.Ticketing,vehicle dispatching,and passenger flow control during rail transit operations in China have been improving over the years.Smart city construction and intelligent management models has also been increasingly emphasized with the rapid development of information and internet technology.Therefore,it is essential to conduct relevant research and discussions to improve the overall efficiency and quality of urban rail transit operation and management.This article provides an overview of smart city rail transit operation and management informatization,the principles of construction,and the functions of smart city rail transit operation and management informatization.Additionally,it discusses the strategies for the construction of smart city rail transit operation and management information and its development prospects.
基金supported by a grant from the National Natural Science Foundation of China(31971249).
文摘Radical operation for hilar cholangiocarcinoma(HCCA)is the most effective treatment,but high rates of severe postoperative complication and death remain concerns due to the complexity of biliary and vascular anatomy of the hepatobiliary region.De-layed arterial hemorrhage(DAH)occurring>24 h postoperatively usually causes life-threatening bleeding,and relaparotomy for DAH would be difficult and hazardous because of postoperative adhe-sions and critical general condition.As endovascular technique is less invasive and has improved over the recent decades,clini-cians have begun to prefer endovascular treatment(EVT)to surgi-cal treatment of DAH after hepatobiliary pancreatic surgery.How-ever,to our knowledge,a relatively large series of patients dealing with the outcomes of EVT of DAH after surgery for HCCA has not been reported.Herein,we analyzed the technical and clinical out-comes of EVT in 17 patients to evaluate the efficacy and safety of EVT.
基金the National Key Research and Development Program(2021YFC2501106)the Key Discipline Construction Project of Chinese PLA Medical College during the 13^(th) Five-Year Plan Period(A350109).
文摘Patent foramen ovale(PFO)is a remnant of normal fetal anatomy,which occurs in about 20%–25%of cases.Patients with PFO are at increased risk for migraine,acute limb ischemia secondary to emboli and cryptogenic(no other identifiable cause)stroke.The traditional approach has been to use a fluoroscopically guided blocking device,but this is contraindicated in patients with severe allergies to contrast media or inability to undergo angiography.With the advancements in technology,ultrasonic robotic systems have become available for medical procedures.In the current study,we reported a case of using the ultrasonic robotic teleoperation system to achieve closure of PFO at the Chinese PLA General Hospital,Beijing,China.
文摘BACKGROUND Endoscopic submucosal dissection(ESD)is a treatment for early gastric cancer with the advantages of small invasion,fewer complications,and a low local recurrence rate.However,there is a high risk of complications such as bleeding and perforation,and the operation time is also longer.ESD operation time is closely related to bleeding and perforation.AIM To investigate the influencing factors associated with ESD operation time and postoperative delayed hemorrhage to provide a reference for early planning,early identification,and prevention of complications.METHODS We conducted a retrospective study based on the clinical data of 520 patients with early gastric cancer in the Second Affiliated Hospital of Hainan Medical University from January 2019 to December 2021.The baseline data,clinical features,and endoscopic and pathological characteristics of patients were collected.The multivariate linear regression model was used to investigate the influencing factors of ESD operation time.Logistic regression analysis was carried out to evaluate the influencing factors of postoperative delayed hemorrhage.RESULTS The multivariate analysis of ESD operation time showed that the maximum lesion diameter could affect 8.815%of ESD operation time when other influencing factors remained unchanged.The operation time increased by 3.766%or 10.247%if the lesion was mixed or concave.The operation time increased by 4.417%if combined with an ulcer or scar.The operation time increased by 3.692%if combined with perforation.If infiltrated into the submucosa,it increased by 2.536%.Multivariate analysis of delayed hemorrhage after ESD showed that the maximum diameter of the lesion,lesion morphology,and ESD operation time were independent influencing factors for delayed hemorrhage after ESD.Patients with lesion≥3.0 cm(OR=3.785,95%CI:1.165-4.277),lesion morphology-concave(OR=10.985,95%CI:2.133-35.381),and ESD operation time≥60 min(OR=2.958,95%CI:1.117-3.526)were prone to delayed hemorrhage after ESD.CONCLUSION If the maximum diameter of the lesion in patients with early gastric cancer is≥3.0 cm,and the shape of the lesion is concave,or accompanied by an ulcer or scar,combined with perforation,and infiltrates into the submucosa,the ESD operation will take a longer time.When the maximum diameter of the lesion is≥3.0 cm,the shape of the lesion is concave in patients and the operation time of ESD takes longer time,the risk of delayed hemorrhage after ESD is higher.
基金This study was financially supported by the Program for Scientific Research Start-Up Funds of Guangdong Ocean University(060302072101)Comparative Study,and Optimization of Horizontal Lifting of Subsea Pipeline(2021E05011).
文摘Pipelines are widely used for transporting oil resources in the context of offshore oil exploitation.The pipeline stress-strength analysis is an important stage in related design and ensuing construction techniques.In this study,assuming representative work environment parameters,pipeline lifting operations are investigated numerically.More specifically,a time-domain coupled dynamic analysis method is used to conduct a hydrodynamic analysis under different current velocities and wave heights.The results show that proper operation requires the lifting points are reasonably set in combination with the length of the pipeline and the position of the lifting device on the construction ship.The impact of waves on the pipeline is limited,however lifting operations under strong wind and waves should be avoided as far as possible.
基金the Natural Science Basic Research Program of Shaanxi(2023-JC-QN-0075,2022JM-395).
文摘With the rapid development of informatization,autonomy and intelligence,unmanned swarm formation intelligent operations will become the main combat mode of future wars.Typical unmanned swarm formations such as ground-based directed energy weapon formations,space-based kinetic energy weapon formations,and sea-based carrier-based formations have become the trump card for winning future wars.In a complex confrontation environment,these sophisticated weapon formation systems can precisely strike mobile threat group targets,making them extreme deterrents in joint combat applications.Based on this,first,this paper provides a comprehensive summary of the outstanding advantages,strategic position and combat style of unmanned clusters in joint warfare to highlight their important position in future warfare.Second,a detailed analysis of the technological breakthroughs in four key areas,situational awareness,heterogeneous coordination,mixed combat,and intelligent assessment of typical unmanned aerial vehicle(UAV)swarms in joint warfare,is presented.An in-depth analysis of the UAV swarm communication networking operating mechanism during joint warfare is provided to lay the theoretical foundation for subsequent cooperative tracking and control.Then,an indepth analysis of the shut-in technology requirements of UAV clusters in joint warfare is provided to lay a theoretical foundation for subsequent cooperative tracking control.Finally,the technical requirements of UAV clusters in joint warfare are analysed in depth so the key technologies can form a closed-loop kill chain system and provide theoretical references for the study of intelligent command operations.
文摘The Red-Thai Binh River system is an important water resource to the Northern Delta, serving the development of agriculture, people’s livelihood and other economic sectors through its upstream reservoirs and a system of water abstraction works along the rivers. However, due to the impact of climate change and pressure from socio-economic development, the operation of the reservoir system according to Decision No. 740/QD-TTg was issued on June 17, 2019 by the Prime Minister of Government promulgating the Red-Thai Binh River system inter-reservoir operation rules (Operation rules 740) has some shortcomings that need adjustments for higher water use efficiency, meeting downstream water demand and power generation benefits. Through the results of water balance calculation and analysis of economic benefits from water use scenarios, this research proposed adjustment to the inter-reservoir operation during dry season in the Red River system. The result showed that an average water level of 1.0 - 1.7 m should be maintained at Hanoi during the increased release period.
基金supported by National Natural Science Foundation of China (No.51905116)Basic and Applied Basic Research Foundation of Guangdong Province (Item No.2020A1515111141)+3 种基金The 13th Five-Year Plan Youth Project of Philosophy and Social Science of Guangdong Province (GD20YYS03)Science and Technology Program of Guangzhou (No.201904010463)Youth Innovative Talent Projects from Ordinary University of Guangdong Province (2019WQNCX099)Innovation Training Program for College Students in Guangdong Province (S202111078058).
文摘Ergonomic reliability plays a significant role in the safe operation of devices.With the spread of infectious diseases around the world,in work environments with high loads and high infection rates,medical staff work in a state of high self-protection.The use of visual display terminal(VDT)for medical equipment has undergone fundamental changes,and the traditional medical equipment human-machine interface design needs to be improved.After the completion of design and development,a VDT design enters the experimental testing stage,which has significant limitations for simulating the work of medical staff in the high-load and high-infection environments.The testing cost is high,and subjects face harsh conditions;thus,an ergonomic reliability model that can predict the use of VDT in such special high-infection and high-load circumstances must be established.An ergonomic reliability model based on an improved backpropagation neural network(BPNN)and human cognition reliability(HCR)is proposed for predicting and evaluating operation flows according tomedical equipment VDTs.Firstly,a small data sample can be used to train BPNN to generate a network that can ensure suitable accuracy.To prevent the model from falling into local optimal solutions,the bat algorithm is introduced to improve the BPNN.Compared to a traditional BPNN,the superiority of the improved BPNN is clearly demonstrated.Secondly,the HCR method is used to analyze and highlight changes in the human factor reliability of VDTs for medical equipment in different time processes and operating processes according to BPNN prediction results,to provide a reference for selecting the optimalmethod.Finally,the validity and availability of the proposedmethod are verified through an eye tracker experiment and statistical analysis results.
文摘Introduction:We sought to investigate whether the development of sub-pulmonic systolic anterior motion(SAM)may be inherent to the anatomy of the the mitral valve(MV)or affected by external factors,such as a dilated right ventricle or chest abnormalities in d-looped transposition of the great arteries post atrial switch operation(d-TGA/AtS).Methods:Analysis was performed of clinical and cardiac imaging studies acquired on 19 adult patients with d-TGA/AtS(age 42±6 years old,56%male)between 2015–2019.Echocardiography data included mitral apparatus anatomy,and CT/MRI data included biventricular dimensions,function,and Haller index(HI)for pectus deformity.Results:Patients with leaflet SAM(n=6)compared to patients without SAM(n=13)had higher MV protrusion height(2.3±0.5 vs.1.5±0.4 cm,p≤0.01)and longer anterior MV leaflet length(3.1±0.4 cm vs.2.6±0.3 cm p≤0.05),when compared to those without.CT/MRI showed higher sub-pulmonic left ventricular ejection fraction(LVEF)in the SAM group(71%±8%vs.54%±7%,respectively).RV size and function,significant chest deformity(HI>3.5),presence of a ventricular lead pacemaker,and septal thickness did not play a role in development of SAM.Conclusions:An elongated mitral apparatus is associated with the development of SAM,and the development of left ventricular outflow tract obstruction(LVOTO),in d-TGA/AtS.LV hyperkinesia is associated with SAM.Systemic RV dimensions,septal thickness,and degree of chest deformity did not differ significantly between subjects with SAM and those without.
文摘This study proposes a novel form of environmental reservoir operation through integrating environmental flow supply,drought analysis,and evolutionary optimization.This study demonstrates that simultaneous supply of downstream environmental flow of reservoir as well as water demand is challenging in the semi-arid area especially in dry years.In this study,water supply and environmental flow supply were 40%and 30%in the droughts,respectively.Moreover,mean errors of supplying water demand as well as environmental flow in dry years were 6 and 9 m3/s,respectively.Hence,these results highlight that ecological stresses of the downstream aquatic habitats as well as water supply loss are considerably escalated in dry years,which implies even using environmental optimal operation is not able to protect downstream aquatic habitats properly in the severe droughts.Moreover,available storage in reservoir will be remarkably reduced(averagely more than 30×106 m3 compared with optimal storage equal to 70×106 m3),which implies strategic storage of reservoir might be threatened.Among used evolutionary algorithms,particle swarm optimization(PSO)was selected as the best algorithm for solving the novel proposed objective function.The significance of this study is to propose a novel objective function to optimize reservoir operation in which environmental flow supply is directly addressed and integrated with drought analysis.This novel form of optimization system can overcome uncertainties of the conventional objective function due to considering environmental flow in the objective function as well as drought analysis in the context of reservoir operation especially applicable in semi-arid areas.The results indicate that using either other water resources for water supply or reducing water demand is the only solution for managing downstream ecological impacts of the river ecosystem.In other words,the results highlighted that replanning of water resources in the study area is necessary.Replacing the conventional optimization system for reservoir operation in the semi-arid area with proposed optimization system is recommendable to minimize the negotiations between stakeholders and environmental managers.
基金Lucian Blaga University of Sibiu&Hasso Plattner Foundation Research Grants LBUS-IRG-2020-06.
文摘New fractional operators, the COVID-19 model has been studied in this paper. By using different numericaltechniques and the time fractional parameters, the mechanical characteristics of the fractional order model areidentified. The uniqueness and existence have been established. Themodel’sUlam-Hyers stability analysis has beenfound. In order to justify the theoretical results, numerical simulations are carried out for the presented methodin the range of fractional order to show the implications of fractional and fractal orders.We applied very effectivenumerical techniques to obtain the solutions of themodel and simulations. Also, we present conditions of existencefor a solution to the proposed epidemicmodel and to calculate the reproduction number in certain state conditionsof the analyzed dynamic system. COVID-19 fractional order model for the case of Wuhan, China, is offered foranalysis with simulations in order to determine the possible efficacy of Coronavirus disease transmission in theCommunity. For this reason, we employed the COVID-19 fractal fractional derivative model in the example ofWuhan, China, with the given beginning conditions. In conclusion, again the mathematical models with fractionaloperators can facilitate the improvement of decision-making for measures to be taken in the management of anepidemic situation.
基金supported by the Science and Technology Major Project 2020 of Liaoning Province,China(2020JH1/10100008)National Natural Science Foundation of China(61991404 and 61991400)111 Project 2.0(B08015)。
文摘Based on an analysis of the operational control behavior of operation experts on energy-intensive equipment,this paper proposes an intelligent control method for low-carbon operation by combining mechanism analysis with deep learning,linking control and optimization with prediction,and integrating decision-making with control.This method,which consists of setpoint control,self-optimized tuning,and tracking control,ensures that the energy consumption per tonne is as low as possible,while remaining within the target range.An intelligent control system for low-carbon operation is developed by adopting the end-edge-cloud collaboration technology of the Industrial Internet.The system is successfully applied to a fused magnesium furnace and achieves remarkable results in reducing carbon emissions.