期刊文献+
共找到4,845篇文章
< 1 2 243 >
每页显示 20 50 100
Coordinated Mining Procedures of Open Pit Mines Based on River Management
1
作者 Baoyu CAO Zhiyong ZHANG +2 位作者 Bo WANG Ruirong DONG Hongjian WANG 《Asian Agricultural Research》 2024年第5期11-14,19,共5页
This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify... This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management. 展开更多
关键词 River management open pit mine mining procedure Coordinated mining
下载PDF
Study on the Application of Real-Time Drone Monitoring in Ordos Open-Pit Coal Mine
2
作者 Junyi Wu Weizheng Wang Xuesong Ni 《Open Journal of Applied Sciences》 CAS 2023年第4期483-495,共13页
In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detecti... In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model. 展开更多
关键词 open-pit Mine Safety Monitoring UAV Object Detection
下载PDF
Dynamic phase-mining optimization in open-pit metal mines 被引量:8
3
作者 顾晓薇 王青 葛舒 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2010年第10期1974-1980,共7页
Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model... Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model is presented,in which a sequence of geologically optimum pits is first generated and then dynamically evaluated to simultaneously optimize the above three aspects,with the objective of maximizing the overall net present value.In this model,the dynamic nature of the problem is fully taken into account with respect to both time and space,and is robust in accommodating different pit wall slopes and different bench heights.The model is applied to a large deposit consisting of 2044 224 blocks and proved to be both efficient and practical. 展开更多
关键词 金属矿山 优化 开采 露天 相位 动态生成 动态性质 模型
下载PDF
High precision slope deformation monitoring model based on the GPS/Pseudolites technology in open-pit mine 被引量:26
4
作者 WANG Jianpeng, GAO Jingxiang, LIU Chao, WANG Jian School of Environment and Spatial Informatics, China University of Mining & Technology, Xuzhou 221008, China 《Mining Science and Technology》 EI CAS 2010年第1期126-131,137,共7页
As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of vis... As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of visible satellites, strengthen the geometric intensity of satellites and provide a precision solution for slope deformation monitoring. However, the un-modeled systematic errors are still the main limiting factors for high precision baseline solution. In order to eliminate the un-modeled systematic error, the Empirical Mode Decomposition (EMD) theory is employed. The multi-scale decomposition and reconstruction architecture are defined here on the basis of the EMD theory and the systematic error mitigation model is demonstrated as well. A standard of the scale selection for the systematic error elimination is given in terms of the mean of the accumulated standardized modes. Thereafter, the scheme of the GPS/PLs baseline solution based on the EMD is suggested. The simulation and experiment results show that the precision factors (DOP) are reduced greatly when PLs is located suitably. The proposed scheme dramatically improves the reliability of ambiguity resolution and the precision of baseline vector after systematic error being eliminated, and provides an effective model for high precision slope deformation monitoring in open-pit mine. 展开更多
关键词 模型精度 变形监测 伪卫星 露天矿 GPS 高边坡 矿山技术 标准化模式
下载PDF
Application of open-pit and underground mining technology for residual coal of end slopes 被引量:9
5
作者 CHE, Zhaoxue YANG, Hong 《Mining Science and Technology》 EI CAS 2010年第2期266-270,共5页
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech... Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized. 展开更多
关键词 integrated open-pit and underground mining end-slope resource recovery economic benefit surface coal mine
下载PDF
Development and characterization of formulation of dust-suppressant used for stope road in open-pit mines 被引量:5
6
作者 Cui-Feng DU Li LI 《Journal of Coal Science & Engineering(China)》 2013年第2期219-225,共7页
关键词 抑制剂 露天矿 表征 灰尘 公路 采场 最佳配方 表面活性剂
下载PDF
Sensitivity analysis for parameters of a monitoring system for steep slopes of open-pit mines 被引量:3
7
作者 HAN Xue HE Man-chao ZHANG Bi 《Mining Science and Technology》 EI CAS 2009年第4期441-445,共5页
Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitori... Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitoring steep slopes of open-pit mines,the MSARMA method was used to establish analytical models for the monitoring system,given various parameter settings based on the description of mechanical monitoring principles.We used this sensitivity analysis to conclude that the setting of the most sensitive location of a mechanical monitoring system should be within a range of 1/5~1/2 of the lower part in a vertical direction of steep slopes,with a rational and feasible range of the dip angle setting between 0°~20°.Given the analytical results of our on-site experiments,we have shown that the parameters determined reflect the stability of steep slopes accurately and effectively.These conclusions provide a basis for the application of a new type of steep slope stability monitoring technology in open-pit mines. 展开更多
关键词 参数监测系统 露天矿 灵敏度分析 陡坡 敏感性分析 技术参数 稳定性 安全生产
下载PDF
Circle geometric constraint model for open-pit mine ore-matching and its applications 被引量:2
8
作者 黄俊歆 王李管 +3 位作者 熊书敏 徐少游 谭正华 王海桥 《Journal of Central South University》 SCIE EI CAS 2012年第9期2598-2603,共6页
The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a se... The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a set of nodes and directed edges,which were connected together with other nodes in the range of circle constraints,to describe the mining sequence.Also,the constructing method of CGCM was introduced in detail.The algorithm of CGCM has been realized in the DIMINE system,and applied to a short-term(5d) program calculation for ore-matching of a cement limestone mine in Hebei Province,China.The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles.This model,which is applicable for resolving OMOMP under complicated geometric constraints with accurate results,provides effective ways to solve the problems of open-pit ore-matching. 展开更多
关键词 几何约束 约束模型 露天矿 匹配 应用 海气耦合模式 节点连接 模型抽象
下载PDF
Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem 被引量:2
9
作者 E.Moosavi J.Gholamnejad +1 位作者 M.Ataee-pour E.Khorram 《Journal of Central South University》 SCIE EI CAS 2014年第7期2848-2856,共9页
Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it pos... Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs. 展开更多
关键词 拉格朗日松弛法 生产调度问题 性能改进 露天矿山 NP-HARD问题 近似最优解 遗传算法 拉格朗日乘数
下载PDF
Cut slope reinforcement technique in open-pit mines 被引量:3
10
作者 YongtaoGao JianboSun +1 位作者 ShunchuanWu AibingJin 《Journal of University of Science and Technology Beijing》 CSCD 2004年第4期289-292,共4页
The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geologica... The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice. 展开更多
关键词 mining engineering open-pit slope weak formation SUPPORTING high pressuregrouting
下载PDF
Optimization model of truck flow at open-pit mines and standards for feasibility test 被引量:2
11
作者 YingZhang YongZhao QiweiLu WenliXu 《Journal of University of Science and Technology Beijing》 CSCD 2004年第5期389-393,共5页
In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual sched... In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method. 展开更多
关键词 open-pit mine truck flow linear programming mathematical model FEASIBILITY
下载PDF
Stability analysis of the sliding process of the west slope in Buzhaoba Open-Pit Mine 被引量:1
12
作者 Ning Fang Ji Changsheng Garmondyu E.Crusoe Jr. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期869-875,共7页
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th... To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P. 展开更多
关键词 open-pit mine Side slope Sliding process Aging stability Crack zone
下载PDF
Thermal recovery process of a backfilled open-pit in permafrost area at the Gulian strip coal mine in Northeast China 被引量:1
13
作者 GAO Shu-hui HE Rui-xia +3 位作者 JIN Hui-jun HUANG Ya-dong ZHANG Jian-ming LUO Dong-liang 《Journal of Mountain Science》 SCIE CSCD 2017年第11期2212-2229,共18页
Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical ... Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions. 展开更多
关键词 Coal-mine open-pit BACKFILL Numericalsimulation THERMAL recovery process SENSITIVITYANALYSIS Gulian STRIP coal mine
下载PDF
Charging for the waste dumping of open-pit metal mines 被引量:1
14
作者 Yunbing Hou Zhaoxiang Zhang Haifeng Duan Liming Xue 《Journal of University of Science and Technology Beijing》 CSCD 2006年第6期481-485,共5页
Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristi... Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping. The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model, whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model. 展开更多
关键词 open-pit metal mine waste dumping charging pattern basic charging rate differential charging rate
下载PDF
Study on Influencing Factors and Planning Model of Mining Quantity about Mineral Resources in Open Pit
15
作者 KE Lihua CHEN Jie 《矿物学报》 CAS CSCD 北大核心 2013年第S1期41-41,共1页
According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its... According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development. 展开更多
关键词 open pit mining quantity LIFE-CYCLE COST PLANNING model
下载PDF
Study on the Law of the Movement and Damage to Slope with the Combination of Underground Mining and Open-Pit Mining 被引量:1
16
作者 Gaofeng Ren Xingkui Fang 《Engineering(科研)》 2010年第3期201-204,共4页
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak... Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine. 展开更多
关键词 COMBINATION of UNDERGROUND and open-pit mining mining DAMAGE Deformation Mechanism Numerical Simulation
下载PDF
Dust Suppression on Open Pit Drill Rigs--Case Study from Skorpion Zinc Mine
17
作者 Stefanus Andries Jakobus Potgieter Johannes Jacobus Labuschagne du Plessis 《Journal of Earth Science and Engineering》 2015年第8期512-519,共8页
关键词 下线 服务 迁移
下载PDF
Numerical scheme for elastoplastic parameter identification and finite element analysis of wall-slope of the Fushun West Open Pit Mine
18
作者 沈新普 王建学 ZenonMroz 《Journal of Coal Science & Engineering(China)》 2002年第1期38-44,共7页
The elasto brittle plastic finite element analysis has been taken on the prediction for the deformation of the northwall of an open pit of Fushun, China. Numerical simulation has been made on the reinforcement measure... The elasto brittle plastic finite element analysis has been taken on the prediction for the deformation of the northwall of an open pit of Fushun, China. Numerical simulation has been made on the reinforcement measures of the slope structure. Using parameter identification techniques and connecting with elasto brittle plastic finite element program, the displacement back analysis has been made on the material parameters of the rockslope. The equivalent parameter values of the real slope structure have been obtained. The process of the rapid increment of the slope′s deformation caused by open mining during 1987~1990 has been reappeared through the numerical simulation. 展开更多
关键词 岩石斜井 参数标识 弹性塑料 有限元分析 露天矿开采
下载PDF
露天矿高陡复杂边坡软弱岩层组“坐落-滑移式”破坏模式研究
19
作者 聂兴信 吴功勇 +2 位作者 张鑫 赵一迪 王哲 《工业安全与环保》 2024年第5期40-44,共5页
边坡稳定性问题随露天矿开采的进行不断突出,而边坡软弱岩层严重影响边坡稳定性。大量工程实例显示,露天矿含软弱岩层组的高陡复杂边坡失稳模式通常为“坐落-滑移式”破坏。为明晰露天矿高陡复杂边坡软弱岩层组“坐落-滑移式”破坏模式... 边坡稳定性问题随露天矿开采的进行不断突出,而边坡软弱岩层严重影响边坡稳定性。大量工程实例显示,露天矿含软弱岩层组的高陡复杂边坡失稳模式通常为“坐落-滑移式”破坏。为明晰露天矿高陡复杂边坡软弱岩层组“坐落-滑移式”破坏模式的破坏机理,以某露天矿为例,提出一种针对露天矿含软弱岩层组高陡复杂边坡的综合分析方法。研究结果表明:采用工程地质分析、传统极限平衡方法和数值模拟分析相结合的综合分析方法,针对该类型复杂边坡可发挥不同分析方法的优势,较全面地从地质自然环境条件、定性定量方面、应力应变角度分析边坡破坏机理及模式,总结归纳出含软弱层组露天矿高陡复杂边坡“坐落-滑移式”破坏的“坐落-滑移-剪出”三段式破坏特征,为其他类似复杂边坡稳定性的分析和防治提供思路和手段。 展开更多
关键词 露天矿高陡边坡 软弱岩层组 “坐落-滑移式”破坏 数值模拟
下载PDF
基于ISSA-XGBoost模型的多特征融合露天矿卡车行程时间预测
20
作者 顾清华 王燕 +1 位作者 王倩 魏瑾瑜 《有色金属(矿山部分)》 2024年第1期1-10,共10页
针对露天矿运输系统卡车行程时间预测问题,提出了一种基于特征选择及改进麻雀算法优化XGBoost的露天矿卡车行程时间预测模型。模型充分考虑了卡车特征、道路特征、气象特征以及时间特征对卡车行程时间的影响,并使用皮尔逊系数法深入分... 针对露天矿运输系统卡车行程时间预测问题,提出了一种基于特征选择及改进麻雀算法优化XGBoost的露天矿卡车行程时间预测模型。模型充分考虑了卡车特征、道路特征、气象特征以及时间特征对卡车行程时间的影响,并使用皮尔逊系数法深入分析影响因素的贡献度。针对麻雀算法中全局搜索能力薄弱的问题引入反向学习和螺旋搜索策略,以提高算法的收敛性能。最后,使用改进的麻雀算法对XGBoost的关键参数进行寻优,进而构建露天矿卡车行程时间预测模型。选取国内某大型露天矿卡车调度系统采集的数据进行仿真模拟,并将所提出模型与SVM、BP、RBF和RF等其他机器学习模型进行对比。结果表明:所提出模型的预测误差均低于其他模型,相关系数可达0.9819。开发的模型和分析结果可以极大地帮助决策者规划、运营和管理更高效的露天矿运输系统。 展开更多
关键词 行程时间预测 露天矿卡车 XGBoost 改进麻雀算法 均值滤波
下载PDF
上一页 1 2 243 下一页 到第
使用帮助 返回顶部