With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performan...With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit,the later is an economical and feasible solution with less financial investment and higher test capability.However,the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project,just as in a direct test circuit.Equivalency analysis is focused in this paper,covering the scope of thyristor valves' steady state,and transient state.On the basis of the results achieved,a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.,Ltd.(XIHARI),China.Some of the results have been adopted also by a new national standard of China.展开更多
The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the...The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the high cost and long duration of operational tests,it is essential to plan the test in advance.To solve the problem of planning UAV swarm operational test,this study considers the multi-stage feature of a UAV swarm mission,composed of launch,flight and combat stages,and proposes a method to find test plans that can maximize mission reliability.Therefore,a multi-stage mission reliability model for a UAV swarm is proposed to ensure successful implementation of the mission.A multi-objective integer optimization method that considers both mission reliability and cost is then formulated to obtain the optimal test plans.This study first constructs a mission reliability model for the UAV swarm in the combat stage.Then,the launch stage and flight stage are integrated to develop a complete PMS(Phased Mission Systems)reliability model.Finally,the Binary Decision Diagrams(BDD)and Multi Objective Quantum Particle Swarm Optimization(MOQPSO)methods are proposed to solve the model.The optimal plans considering both reliability and cost are obtained.The proposed model supports the planning of UAV swarm operational tests and represents a meaningful exploration of UAV swarm test planning.展开更多
Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their oper...Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers.展开更多
Aiming to give some advices on the ground coupled heat pump system design in Siehuan Province, China, a typical ground source heat pump (GSHP) system in Sichuan Province was tested in a whole operational year, and t...Aiming to give some advices on the ground coupled heat pump system design in Siehuan Province, China, a typical ground source heat pump (GSHP) system in Sichuan Province was tested in a whole operational year, and the parameters of temperature and flow rate in different parts of system were measured during this period. The seasonal energy efficiency ratio was calculated and the performance of heat pump system in summer was compared with that in winter. The result shows that the coefficient of performance of the system reaches 3.63 in summer and 3.49 in winter, respectively. The heat balance in underground rock mass is acquired basically throughout the year, and the heat accumulation in the earth tends to be zero.展开更多
This study investigates the necessity for space robots to independently exchange their end-effectors due to the contradiction that exists between the requirements of various robots in space missions and the payload ca...This study investigates the necessity for space robots to independently exchange their end-effectors due to the contradiction that exists between the requirements of various robots in space missions and the payload capacity limits of rockets. The results of this study summarize the system requirements for a new end-effector exchange mechanism, including compact size, misalignment tolerance, and regolith tolerance. This is followed by the development of a prototype model with a set of test apparatus. Then the function of the prototype is verified, the prototype is optimized, and the relation between docking force and misalignment is examined through operation tests.展开更多
基金Project Supported by National Development and Reform Commission(No.[2006]2709)
文摘With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit,the later is an economical and feasible solution with less financial investment and higher test capability.However,the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project,just as in a direct test circuit.Equivalency analysis is focused in this paper,covering the scope of thyristor valves' steady state,and transient state.On the basis of the results achieved,a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.,Ltd.(XIHARI),China.Some of the results have been adopted also by a new national standard of China.
基金supported by the National Natural Science Foundation of China(with Granted Number 72271239,grant recipient P.J.)Research on the Design Method of Reliability Qualification Test for Complex Equipment Based on Multi-Source Information Fusion.https://www.nsfc.gov.cn/.
文摘The unmanned aerial vehicle(UAV)swarm plays an increasingly important role in the modern battlefield,and the UAV swarm operational test is a vital means to validate the combat effectiveness of the UAV swarm.Due to the high cost and long duration of operational tests,it is essential to plan the test in advance.To solve the problem of planning UAV swarm operational test,this study considers the multi-stage feature of a UAV swarm mission,composed of launch,flight and combat stages,and proposes a method to find test plans that can maximize mission reliability.Therefore,a multi-stage mission reliability model for a UAV swarm is proposed to ensure successful implementation of the mission.A multi-objective integer optimization method that considers both mission reliability and cost is then formulated to obtain the optimal test plans.This study first constructs a mission reliability model for the UAV swarm in the combat stage.Then,the launch stage and flight stage are integrated to develop a complete PMS(Phased Mission Systems)reliability model.Finally,the Binary Decision Diagrams(BDD)and Multi Objective Quantum Particle Swarm Optimization(MOQPSO)methods are proposed to solve the model.The optimal plans considering both reliability and cost are obtained.The proposed model supports the planning of UAV swarm operational tests and represents a meaningful exploration of UAV swarm test planning.
基金Project Supported by National Development and Reform Commission(No.[2006]2709)
文摘Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers.
基金Project(50838009) supported by the National Science Key Foundation 1 tem
文摘Aiming to give some advices on the ground coupled heat pump system design in Siehuan Province, China, a typical ground source heat pump (GSHP) system in Sichuan Province was tested in a whole operational year, and the parameters of temperature and flow rate in different parts of system were measured during this period. The seasonal energy efficiency ratio was calculated and the performance of heat pump system in summer was compared with that in winter. The result shows that the coefficient of performance of the system reaches 3.63 in summer and 3.49 in winter, respectively. The heat balance in underground rock mass is acquired basically throughout the year, and the heat accumulation in the earth tends to be zero.
文摘This study investigates the necessity for space robots to independently exchange their end-effectors due to the contradiction that exists between the requirements of various robots in space missions and the payload capacity limits of rockets. The results of this study summarize the system requirements for a new end-effector exchange mechanism, including compact size, misalignment tolerance, and regolith tolerance. This is followed by the development of a prototype model with a set of test apparatus. Then the function of the prototype is verified, the prototype is optimized, and the relation between docking force and misalignment is examined through operation tests.