The escalating deployment of distributed power sources and random loads in DC distribution networks hasamplified the potential consequences of faults if left uncontrolled. To expedite the process of achieving an optim...The escalating deployment of distributed power sources and random loads in DC distribution networks hasamplified the potential consequences of faults if left uncontrolled. To expedite the process of achieving an optimalconfiguration of measurement points, this paper presents an optimal configuration scheme for fault locationmeasurement points in DC distribution networks based on an improved particle swarm optimization algorithm.Initially, a measurement point distribution optimization model is formulated, leveraging compressive sensing.The model aims to achieve the minimum number of measurement points while attaining the best compressivesensing reconstruction effect. It incorporates constraints from the compressive sensing algorithm and networkwide viewability. Subsequently, the traditional particle swarm algorithm is enhanced by utilizing the Haltonsequence for population initialization, generating uniformly distributed individuals. This enhancement reducesindividual search blindness and overlap probability, thereby promoting population diversity. Furthermore, anadaptive t-distribution perturbation strategy is introduced during the particle update process to enhance the globalsearch capability and search speed. The established model for the optimal configuration of measurement points issolved, and the results demonstrate the efficacy and practicality of the proposed method. The optimal configurationreduces the number of measurement points, enhances localization accuracy, and improves the convergence speedof the algorithm. These findings validate the effectiveness and utility of the proposed approach.展开更多
The case study based on Qinling Mountains in Shaanxi Province of China, in virtue of the information from TM image, classifies the land types and analyzes their spatial and temporal differential law, and puts forward ...The case study based on Qinling Mountains in Shaanxi Province of China, in virtue of the information from TM image, classifies the land types and analyzes their spatial and temporal differential law, and puts forward three structural patterns of land types in mountainous areas, namely, spatial, quantitative and qualitative structures of mountainous land types. Furthermore, it has been noticed that the analysis of structural patterns can disclose the heterogeneity and orderliness of combination of land types, which can lay the theoretic foundation for comprehensively recognizing ecological characteristics and succession law of structure and function of land types. After the all-around comparative analysis, an optimal allocation of land use in Qinling Mountains has been put forward according to the principle of sustainable development and landscape ecology, which can lay the scientific foundation in practice for the structural adjustment and distribution optimization from the macro level to micro level.展开更多
This paper tries to integrate game theory, a very useful tool to resolve conflict phenomena, with optimal capital cost allocation issue in total emission control. First the necessity of allocating optimal capital cos...This paper tries to integrate game theory, a very useful tool to resolve conflict phenomena, with optimal capital cost allocation issue in total emission control. First the necessity of allocating optimal capital costs fairly and reasonably among polluters in total emission control was analyzed. Then the possibility of applying game theory to the issue of the optimal capital cost allocation was expounded. Next the cooperative N person game model of the optimal capital cost allocation and its solution ways including method based on Shapley value, least core method, weak least core methods, proportional least core method, CGA method, MCRS method and so on were delineated. Finally through application of these methods it was concluded that to apply game theory in the optimal capital cost allocation issue is helpful to implement the total emission control planning schemes successfully, to control pollution effectively, and to ensure sustainable development.展开更多
We have used the Yellow River Delta (Dongying section) as our study area to address the project of "Three Networks Greening" (TNG). With the use of GIS technology and from an ecological point of view, an optimal...We have used the Yellow River Delta (Dongying section) as our study area to address the project of "Three Networks Greening" (TNG). With the use of GIS technology and from an ecological point of view, an optimal allocation scheme of land resources is constructed and applied to guide the adjustment of land resources. Given this scheme, we have calculated that the area of land suitable for forest and shrubs without greening is 2256 km^2. Simultaneously, acting on the layout of the TNG project, afforestation site types are prepared and improved. Soil types, microrelief, salinity and underwater levels are combined as major classification factors and irrigation conditions as a reference to classify sites into eight types. In this way, land suitable for forest and grass is afforested given particular planting patterns. Finally, by overlaying this forestry site type map with the TNG plan map, some suggestions and strategies are proposed and used to direct the TNG project. An ecological oasis of the Yellow River Delta should be the result.展开更多
<span style="font-family:Verdana;">The ideal places and size of the distribution generators were determined by reducing the loss of power in the distribution networks. The ideal positioning of various ...<span style="font-family:Verdana;">The ideal places and size of the distribution generators were determined by reducing the loss of power in the distribution networks. The ideal positioning of various kinds of DGs has been suggested in the current job. In this job, the ideal power factor for DG supply has been acquired, both the active power as well as the reactive power. In the proposed approach</span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> different types of distribution generation (DG) supply both reactive and real power. For the optimal placement of DG sources</span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> particle swarm optimization technique</span><span style="font-family:Verdana;">s</span><span style="font-family:""><span style="font-family:Verdana;"> have been used in this job. Each of these innovations has its own strengths and drawbacks. Most of the methods that have been proposed so far to formulate DG’s optimum placement problem only consider Type-I DGs, Type-II and </span><span style="font-family:Verdana;">Type-III DGs </span></span><span style="font-family:Verdana;">that </span><span style="font-family:Verdana;">are considered for optimal position in the existing research.</span><span style="font-family:Verdana;"> In the reference, artificial bee colony algorithm was used to determine sites of DGs and condenser combinations and optimal size. The author used PSO method in the reference to determine the appropriate positioning of the DG’s and to maximize the savings of power loss and voltage profile in the distribution network.</span>展开更多
The problem of stochastically allocating redundant com- ponents to increase the system lifetime is an important topic of reliability. An optimal redundancy allocation is proposed, which maximizes the expected lifetime...The problem of stochastically allocating redundant com- ponents to increase the system lifetime is an important topic of reliability. An optimal redundancy allocation is proposed, which maximizes the expected lifetime of a reliability system with sub- systems consisting of components in parallel. The constraints are minimizing the total resources and the sizes of subsystems. In this system, each switching is independent with each other and works with probability p. Two optimization problems are studied by an incremental algorithm and dynamic programming technique respectively. The incremental algorithm proposed could obtain an approximate optimal solution, and the dynamic programming method could generate the optimal solution,展开更多
Optimizing the allocation of water resources is critical for promoting the optimization and upgrading of industrial structure and coordinated development in the Beijing-Tianjin-Hebei regions of China.Based on specific...Optimizing the allocation of water resources is critical for promoting the optimization and upgrading of industrial structure and coordinated development in the Beijing-Tianjin-Hebei regions of China.Based on specific regional and water conditions,to strengthen the constraints on water resources,the“three-step”adaptive management approach of“scheme design-scheme diagnosis-scheme optimization”of water resource allocation are adopted to facilitate the coordinated optimal allocation of water resources and industrial structure in the Beijing-Tianjin-Hebei regions.First,from the level of overall industry,a water resource allocation scheme for the regions is designed by applying the master-slave hierarchical mode and a bi-level optimal model to determine the ideal amount of water resource allocation for the regions and respective industries.Second,the diagnostic criteria of spatial balance,structural matching,and coordinated development are constructed to determine the rationality of the water resource allocation scheme.Then a benefit compensation function with water market transactions is developed,to adaptively adjust the water resource allocation scheme.Finally,the optimization and upgrading of industrial structure are promoted to improve water consumption efficiency and the coordinated development of the Beijing-Tianjin-Hebei regions.The study can provide reference for the Beijing-Tianjin-Hebei regions to realize the comprehensive optimal allocation of water resources in the regions and improve the adaptability of water resources and industrial structure optimization.展开更多
Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilizatio...Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilization of agricultural production and waste water resources.The results demonstrated that the difference of crop energy capture mainly depended on the development stage.Waste water with a certain concentration was able to promote crop growth,while excessive concentration inhibited crop growth.The correlation between water absorption rate and leaf area index was close(R=0.9498,p<0.01).The amount of bad seeds increased at a speed of 34.7·d^-1,when system irrigated randomly in the seedling stage,while it tended to remain stable at a speed of 0.3·d^-1 after plants entering the mature stage which impacted the total yields of crops.展开更多
The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the ope...The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the operation costs and benefits of an urban distribution network in the future.Through the scientific and reasonable planning of public transport hubs on the premise of meeting the needs of basic public transport services,it can reduce the negative impact of electric bus charging loads upon the power grids.Furthermore,it can use its flexible operation characteristics to provide flexible support for the distribution network.In this paper,taking the impact of public transport hub on the reliability of distribution network as the starting point,a three-level programming optimization model based on the value and economy of distribution network load loss is proposed.Through the upper model,several planning schemes can be generated,which provides boundary conditions for the expansion of middle-level optimization.The normal operation dispatching scheme of public transport hub obtained from the middle-level optimization results provides boundary conditions for the development of lower level optimization.Through the lower level optimization,the expected load loss of the whole distribution system including bus hub under the planning scheme given by the upper level can be obtained.The effectiveness of the model is verified by an IEEE-33 bus example.展开更多
Taking 14 prefecture-level cities in Guangxi as an object,this paper explored the difference of cultivated land utilization efficiency in Guangxi,comprehensively evaluated the economic,social,and ecological aspects,an...Taking 14 prefecture-level cities in Guangxi as an object,this paper explored the difference of cultivated land utilization efficiency in Guangxi,comprehensively evaluated the economic,social,and ecological aspects,and analyzed the regional differences in cultivated land use efficiency in Guangxi from 2005 to 2018 based on the improved TOPSIS method.By studying the quantitative change trends and spatial differences of the utilization benefit of cultivated land resources in Guangxi,it came up with recommendations for optimizing the allocation of cultivated land from the quantity and quality of cultivated land.It is intended to provide a scientific and theoretical reference for improving the use efficiency of cultivated land in Guangxi.展开更多
Dual-hop cooperative Multiple-Input Multiple-Output (MIMO) network with multi-relay cooperative communication is introduced. Power allocation problem with Amplify-and-Forward (AF) and Selective Decode-and-Forward (SDF...Dual-hop cooperative Multiple-Input Multiple-Output (MIMO) network with multi-relay cooperative communication is introduced. Power allocation problem with Amplify-and-Forward (AF) and Selective Decode-and-Forward (SDF) strategies in multi-node scenario are formulated and solved respectively. Optimal power allocation schemes that maximize system capacity with AF strategy are presented. In addition, optimal power allocation methods that minimize asymptotic Symbol Error Rate (SER) with SDF cooperative protocol in multi-node scenario are also proposed. Furthermore, performance comparisons are provided in terms of system capacity and approximate SER. Numerical and simulation results confirm our theoretical analysis. It is revealed that, maximum system capacity could be obtained when powers are allocated optimally with AF protocol, while minimization of system's SER could also be achieved with optimum power allocation in SDF strategy. In multi-node scenario, those optimal power allocation algorithms are superior to conventional equal power allocation schemes.展开更多
This article analyzes the Pareto optimal allocations,agreeable trades and agreeable bets under the maxmin Choquet expected utility(MCEU)model.We provide several useful characterizations for Pareto optimal allocations ...This article analyzes the Pareto optimal allocations,agreeable trades and agreeable bets under the maxmin Choquet expected utility(MCEU)model.We provide several useful characterizations for Pareto optimal allocations for risk averse agents.We derive the formulation descriptions for non-existence agreeable trades or agreeable bets for risk neutral agents.We build some relationships between ex-ante stage and interim stage on agreeable trades or bets when new information arrives.展开更多
Energy storage systems(ESSs)operate as independent market participants and collaborate with photovoltaic(PV)generation units to enhance the flexible power supply capabilities of PV units.However,the dynamic variations...Energy storage systems(ESSs)operate as independent market participants and collaborate with photovoltaic(PV)generation units to enhance the flexible power supply capabilities of PV units.However,the dynamic variations in the profitability of ESSs in the electricity market are yet to be fully understood.This study introduces a dual-timescale dynamics model that integrates a spot market clearing(SMC)model into a system dynamics(SD)model to investigate the profit-aware capacity growth of ESSs and compares the profitability of independent energy storage systems(IESSs)with that of an ESS integrated within a PV(PV-ESS).Furthermore,this study aims to ascertain the optimal allocation of the PV-ESS.First,SD and SMC models were set up.Second,the SMC model simulated on an hourly timescale was incorporated into the SD model as a subsystem,a dual-timescale model was constructed.Finally,a development simulation and profitability analysis was conducted from 2022 to 2040 to reveal the dynamic optimal range of PV-ESS allocation.Additionally,negative electricity prices were considered during clearing processes.The simulation results revealed differences in profitability and capacity growth between IESS and PV-ESS,helping grid investors and policymakers to determine the boundaries of ESSs and dynamic optimal allocation of PV-ESSs.展开更多
Spark is a distributed data processing framework based on memory.Memory allocation is a focus question of Spark research.A good memory allocation scheme can effectively improve the efficiency of task execution and mem...Spark is a distributed data processing framework based on memory.Memory allocation is a focus question of Spark research.A good memory allocation scheme can effectively improve the efficiency of task execution and memory resource utilization of the Spark.Aiming at the memory allocation problem in the Spark2.x version,this paper optimizes the memory allocation strategy by analyzing the Spark memory model,the existing cache replacement algorithms and the memory allocation methods,which is on the basis of minimizing the storage area and allocating the execution area according to the demand.It mainly including two parts:cache replacement optimization and memory allocation optimization.Firstly,in the storage area,the cache replacement algorithm is optimized according to the characteristics of RDD Partition,which is combined with PCA dimension.In this section,the four features of RDD Partition are selected.When the RDD cache is replaced,only two most important features are selected by PCA dimension reduction method each time,thereby ensuring the generalization of the cache replacement strategy.Secondly,the memory allocation strategy of the execution area is optimized according to the memory requirement of Task and the memory space of storage area.In this paper,a series of experiments in Spark on Yarn mode are carried out to verify the effectiveness of the optimization algorithm and improve the cluster performance.展开更多
To achieve the better system performance for cooperative communication in non-orthogonal cognitive radio vehicular adhoc networks(CR-VANETs),this paper investigates the power allocation considering the interference to...To achieve the better system performance for cooperative communication in non-orthogonal cognitive radio vehicular adhoc networks(CR-VANETs),this paper investigates the power allocation considering the interference to the main system in a controllable range.We propose a three-slot one-way vehicle system model where the mobile vehicle nodes complete information interaction with the assistance of other independent nodes by borrowing the unused radio spectrum with the primary networks.The end-to-end SNR relationship in overlay and underlay cognitive communication system mode are analyzed by using two forwarding protocol,namely,decode-and-forward(DF)protocol and amplify-and-forward(AF)protocol,respectively.The system outage probability is derived and the optimal power allocation factor is obtained via seeking the minimum value of the approximation of system outage probability.The analytical results have been confirmed by means of Monte Carlo simulations.Simulation results show that the proposed system performance in terms of outage under the optimal power allocation is superior to that under the average power allocation,and is also better than that under other power allocation systems.展开更多
In order to optimize resource integration and optimal scheduling problems in the cloud manufacturing environment,this paper proposes to use load balancing,service cost and service quality as optimization goals for res...In order to optimize resource integration and optimal scheduling problems in the cloud manufacturing environment,this paper proposes to use load balancing,service cost and service quality as optimization goals for resource scheduling,however,resource providers have resource utilization requirements for cloud manufacturing platforms.In the process of resource optimization scheduling,the interests of all parties have conflicts of interest,which makes it impossible to obtain better optimization results for resource scheduling.Therefore,amultithreaded auto-negotiation method based on the Stackelberg game is proposed to resolve conflicts of interest in the process of resource scheduling.The cloud manufacturing platform first calculates the expected value reduction plan for each round of global optimization,using the negotiation algorithm based on the Stackelberg game,the cloud manufacturing platformnegotiates andmediateswith the participants’agents,to maximize self-interest by constantly changing one’s own plan,iteratively find multiple sets of locally optimized negotiation plans and return to the cloud manufacturing platform.Through multiple rounds of negotiation and calculation,we finally get a target expected value reduction plan that takes into account the benefits of the resource provider and the overall benefits of the completion of the manufacturing task.Finally,through experimental simulation and comparative analysis,the validity and rationality of the model are verified.展开更多
Economical and reliable protection of DC-side shortcircuit faults has become a key technology for promoting the development of module multilevel converters based on the high voltage direct current grid(MMC-HVDC-Grid)....Economical and reliable protection of DC-side shortcircuit faults has become a key technology for promoting the development of module multilevel converters based on the high voltage direct current grid(MMC-HVDC-Grid).The fault current limiter(FCL)can effectively suppress the rapid development of the fault current and reduce the current breaking capacity of the circuit breaker.In this paper,a method based on transient energy flow(TEF)analysis is proposed to optimize the allocation of a resistive and inductive FCL in the MMC-HVDC-Grid.In the proposed method,the electromagnetic TEF is measured first,and then,the TEF suppression rate and suppression efficiency are defined as optimization objectives,and the installation location of the FCL and its impedance parameters as optimization variables.To test the proposed method,two-terminal and four-terminal bipolar MMC-HVDC-Grids with single-pole-to-ground DC faults are modeled in the PSCAD/EMTDC so that the TEF data can be acquired.The optimal FCLs’location and parameter values are determined through investigating the evolution paradigm of TEF along with changes of the FCL position and parameters.The results prove that the selected parameters can effectively slow down the DC fault current rising rate,thus reducing the requirements on tripping current of the DC breakers.展开更多
The service quality of a workstation depends mainly on its service load, ifnot taking into account all kinds of devices' break-downs. In this article, an optimization modelwith inequality constraints is proposed, ...The service quality of a workstation depends mainly on its service load, ifnot taking into account all kinds of devices' break-downs. In this article, an optimization modelwith inequality constraints is proposed, which aims to minimize the service load. A noveltransformation of optimization variables is also devised and the constraints are properly combinedso as to make this model into a convex one, whose corresponding Lagrange function and the KKTconditions are established afterwards. The interior-point method for convex optimization ispresented here as an efficient computation tool. Finally, this model is evaluated by a real example,from which conclusions are reached that the interior-point method possesses advantages such asfaster convergeoce and fewer iterations and it is possible to make complicated nonlinearoptimization problems exhibit convexity so as to obtain the optimum.展开更多
This paper proposes a modified decodeand-forward(DAF) protocol with a three-node model,which contains two users and one destination.Each user can be either the source or the relay in different frames.We analyze the fo...This paper proposes a modified decodeand-forward(DAF) protocol with a three-node model,which contains two users and one destination.Each user can be either the source or the relay in different frames.We analyze the four cooperative cases in the first frame and run simulations to obtain the optimal power allocation coefficients in the second frame.The closed-form expression of outage probability is derived over Nakagami-m fading channels.Furthermore,we show that the proposed model has better performance than the non-cooperation system and traditional DAF strategy based on the derived outage probability.展开更多
基金the National Natural Science Foundation of China(52177074).
文摘The escalating deployment of distributed power sources and random loads in DC distribution networks hasamplified the potential consequences of faults if left uncontrolled. To expedite the process of achieving an optimalconfiguration of measurement points, this paper presents an optimal configuration scheme for fault locationmeasurement points in DC distribution networks based on an improved particle swarm optimization algorithm.Initially, a measurement point distribution optimization model is formulated, leveraging compressive sensing.The model aims to achieve the minimum number of measurement points while attaining the best compressivesensing reconstruction effect. It incorporates constraints from the compressive sensing algorithm and networkwide viewability. Subsequently, the traditional particle swarm algorithm is enhanced by utilizing the Haltonsequence for population initialization, generating uniformly distributed individuals. This enhancement reducesindividual search blindness and overlap probability, thereby promoting population diversity. Furthermore, anadaptive t-distribution perturbation strategy is introduced during the particle update process to enhance the globalsearch capability and search speed. The established model for the optimal configuration of measurement points issolved, and the results demonstrate the efficacy and practicality of the proposed method. The optimal configurationreduces the number of measurement points, enhances localization accuracy, and improves the convergence speedof the algorithm. These findings validate the effectiveness and utility of the proposed approach.
基金Key project on Knowledge Innovation of Chinese Academy of Sciences, KZCX2-310-05
文摘The case study based on Qinling Mountains in Shaanxi Province of China, in virtue of the information from TM image, classifies the land types and analyzes their spatial and temporal differential law, and puts forward three structural patterns of land types in mountainous areas, namely, spatial, quantitative and qualitative structures of mountainous land types. Furthermore, it has been noticed that the analysis of structural patterns can disclose the heterogeneity and orderliness of combination of land types, which can lay the theoretic foundation for comprehensively recognizing ecological characteristics and succession law of structure and function of land types. After the all-around comparative analysis, an optimal allocation of land use in Qinling Mountains has been put forward according to the principle of sustainable development and landscape ecology, which can lay the scientific foundation in practice for the structural adjustment and distribution optimization from the macro level to micro level.
文摘This paper tries to integrate game theory, a very useful tool to resolve conflict phenomena, with optimal capital cost allocation issue in total emission control. First the necessity of allocating optimal capital costs fairly and reasonably among polluters in total emission control was analyzed. Then the possibility of applying game theory to the issue of the optimal capital cost allocation was expounded. Next the cooperative N person game model of the optimal capital cost allocation and its solution ways including method based on Shapley value, least core method, weak least core methods, proportional least core method, CGA method, MCRS method and so on were delineated. Finally through application of these methods it was concluded that to apply game theory in the optimal capital cost allocation issue is helpful to implement the total emission control planning schemes successfully, to control pollution effectively, and to ensure sustainable development.
基金supported by the National Science Foundation of China (Grant No.40771172)the Main Direction Program of Knowledge In-novation of the Chinese Academy of Sciences (kzcx2-yw-308)
文摘We have used the Yellow River Delta (Dongying section) as our study area to address the project of "Three Networks Greening" (TNG). With the use of GIS technology and from an ecological point of view, an optimal allocation scheme of land resources is constructed and applied to guide the adjustment of land resources. Given this scheme, we have calculated that the area of land suitable for forest and shrubs without greening is 2256 km^2. Simultaneously, acting on the layout of the TNG project, afforestation site types are prepared and improved. Soil types, microrelief, salinity and underwater levels are combined as major classification factors and irrigation conditions as a reference to classify sites into eight types. In this way, land suitable for forest and grass is afforested given particular planting patterns. Finally, by overlaying this forestry site type map with the TNG plan map, some suggestions and strategies are proposed and used to direct the TNG project. An ecological oasis of the Yellow River Delta should be the result.
文摘<span style="font-family:Verdana;">The ideal places and size of the distribution generators were determined by reducing the loss of power in the distribution networks. The ideal positioning of various kinds of DGs has been suggested in the current job. In this job, the ideal power factor for DG supply has been acquired, both the active power as well as the reactive power. In the proposed approach</span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> different types of distribution generation (DG) supply both reactive and real power. For the optimal placement of DG sources</span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> particle swarm optimization technique</span><span style="font-family:Verdana;">s</span><span style="font-family:""><span style="font-family:Verdana;"> have been used in this job. Each of these innovations has its own strengths and drawbacks. Most of the methods that have been proposed so far to formulate DG’s optimum placement problem only consider Type-I DGs, Type-II and </span><span style="font-family:Verdana;">Type-III DGs </span></span><span style="font-family:Verdana;">that </span><span style="font-family:Verdana;">are considered for optimal position in the existing research.</span><span style="font-family:Verdana;"> In the reference, artificial bee colony algorithm was used to determine sites of DGs and condenser combinations and optimal size. The author used PSO method in the reference to determine the appropriate positioning of the DG’s and to maximize the savings of power loss and voltage profile in the distribution network.</span>
基金supported by the National Natural Science Foundation of China(7117217271101158+3 种基金71272058)the Program for New Century Excellent Talents in University(NCET-10-0043)the Key Project Cultivation Fund of the Scientific and Technical Innovation Program of Beijing Institute of Technology(2011CX01001)the Special Fund of International Science and Technology Cooperation Program of Beijing Institute of Technology(GZ2014215101)
文摘The problem of stochastically allocating redundant com- ponents to increase the system lifetime is an important topic of reliability. An optimal redundancy allocation is proposed, which maximizes the expected lifetime of a reliability system with sub- systems consisting of components in parallel. The constraints are minimizing the total resources and the sizes of subsystems. In this system, each switching is independent with each other and works with probability p. Two optimization problems are studied by an incremental algorithm and dynamic programming technique respectively. The incremental algorithm proposed could obtain an approximate optimal solution, and the dynamic programming method could generate the optimal solution,
基金supported by the Humanities and Social Science Foundation of Ministry of Education“Research on the Optimal Adaptability of Basin Initial Water Rights and Industrial Structures under the Rigid Constraints of Water Resource”[Grant number.21YJCZH176]Beijing Municipal Natural Science Foundation of China“Research on Bi-directional Optimal Adaptability of Water Resource and Industrial Structures under the Coordinated Development of the Beijing-Tianjin-Hebei Region”(Grant number.9202005)+1 种基金the Humanities and Social Science Foundation of Ministry of Education“Research on Complex System Model of Industrial Water Rights Trading Based on Experimental Economics and Dynamic Simulation under Dual Control Action”[Grant number.20YJCZH095]General Projects of Social Science Plan of Beijing Municipal Education Commission[Grant number.SM201910009007].
文摘Optimizing the allocation of water resources is critical for promoting the optimization and upgrading of industrial structure and coordinated development in the Beijing-Tianjin-Hebei regions of China.Based on specific regional and water conditions,to strengthen the constraints on water resources,the“three-step”adaptive management approach of“scheme design-scheme diagnosis-scheme optimization”of water resource allocation are adopted to facilitate the coordinated optimal allocation of water resources and industrial structure in the Beijing-Tianjin-Hebei regions.First,from the level of overall industry,a water resource allocation scheme for the regions is designed by applying the master-slave hierarchical mode and a bi-level optimal model to determine the ideal amount of water resource allocation for the regions and respective industries.Second,the diagnostic criteria of spatial balance,structural matching,and coordinated development are constructed to determine the rationality of the water resource allocation scheme.Then a benefit compensation function with water market transactions is developed,to adaptively adjust the water resource allocation scheme.Finally,the optimization and upgrading of industrial structure are promoted to improve water consumption efficiency and the coordinated development of the Beijing-Tianjin-Hebei regions.The study can provide reference for the Beijing-Tianjin-Hebei regions to realize the comprehensive optimal allocation of water resources in the regions and improve the adaptability of water resources and industrial structure optimization.
基金Supported by the Science and Technology Research Project of the Ministry of Education(14YJCZH017)the Major State Basic Research Development Program of China(973 Program)(2017YFC0404503)+1 种基金Key Cultivation Project of Lingnan Normal University in 2019(LZ1903)Lingnan Normal University Special Talent Program(ZL2007)
文摘Based on the theory of complex adaptive system(CAS),the optimal allocation model of water resources in sewage irrigation areas was established,which provided new ideas and application value for the rational utilization of agricultural production and waste water resources.The results demonstrated that the difference of crop energy capture mainly depended on the development stage.Waste water with a certain concentration was able to promote crop growth,while excessive concentration inhibited crop growth.The correlation between water absorption rate and leaf area index was close(R=0.9498,p<0.01).The amount of bad seeds increased at a speed of 34.7·d^-1,when system irrigated randomly in the seedling stage,while it tended to remain stable at a speed of 0.3·d^-1 after plants entering the mature stage which impacted the total yields of crops.
文摘The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the operation costs and benefits of an urban distribution network in the future.Through the scientific and reasonable planning of public transport hubs on the premise of meeting the needs of basic public transport services,it can reduce the negative impact of electric bus charging loads upon the power grids.Furthermore,it can use its flexible operation characteristics to provide flexible support for the distribution network.In this paper,taking the impact of public transport hub on the reliability of distribution network as the starting point,a three-level programming optimization model based on the value and economy of distribution network load loss is proposed.Through the upper model,several planning schemes can be generated,which provides boundary conditions for the expansion of middle-level optimization.The normal operation dispatching scheme of public transport hub obtained from the middle-level optimization results provides boundary conditions for the development of lower level optimization.Through the lower level optimization,the expected load loss of the whole distribution system including bus hub under the planning scheme given by the upper level can be obtained.The effectiveness of the model is verified by an IEEE-33 bus example.
基金Youth Program of Humanities and Social Science Project of the Ministry of Education(17YJC79004)Program of National Natural Science Foundation of China(71803104)Qingchuang Science and Technology Support Plan for Colleges and Universities in Shandong Province(2019RWE009).
文摘Taking 14 prefecture-level cities in Guangxi as an object,this paper explored the difference of cultivated land utilization efficiency in Guangxi,comprehensively evaluated the economic,social,and ecological aspects,and analyzed the regional differences in cultivated land use efficiency in Guangxi from 2005 to 2018 based on the improved TOPSIS method.By studying the quantitative change trends and spatial differences of the utilization benefit of cultivated land resources in Guangxi,it came up with recommendations for optimizing the allocation of cultivated land from the quantity and quality of cultivated land.It is intended to provide a scientific and theoretical reference for improving the use efficiency of cultivated land in Guangxi.
基金Supported by National Natural Science Foundation of China (NSFC) (No. 60972039)National High Technology Research and Development Program of China (No.2009AA01Z241)Innovation Program for Ph.D. and Postgraduate Candidates in Jiangsu Province (No.CX09B_147Z)
文摘Dual-hop cooperative Multiple-Input Multiple-Output (MIMO) network with multi-relay cooperative communication is introduced. Power allocation problem with Amplify-and-Forward (AF) and Selective Decode-and-Forward (SDF) strategies in multi-node scenario are formulated and solved respectively. Optimal power allocation schemes that maximize system capacity with AF strategy are presented. In addition, optimal power allocation methods that minimize asymptotic Symbol Error Rate (SER) with SDF cooperative protocol in multi-node scenario are also proposed. Furthermore, performance comparisons are provided in terms of system capacity and approximate SER. Numerical and simulation results confirm our theoretical analysis. It is revealed that, maximum system capacity could be obtained when powers are allocated optimally with AF protocol, while minimization of system's SER could also be achieved with optimum power allocation in SDF strategy. In multi-node scenario, those optimal power allocation algorithms are superior to conventional equal power allocation schemes.
基金supported by the National Natural Science Foundation of China(No.12171471)Natural Science Foundation of Jiangsu Province(No.BK20221543).
文摘This article analyzes the Pareto optimal allocations,agreeable trades and agreeable bets under the maxmin Choquet expected utility(MCEU)model.We provide several useful characterizations for Pareto optimal allocations for risk averse agents.We derive the formulation descriptions for non-existence agreeable trades or agreeable bets for risk neutral agents.We build some relationships between ex-ante stage and interim stage on agreeable trades or bets when new information arrives.
基金supported by National Natural Science Foundation of China(U2066209)。
文摘Energy storage systems(ESSs)operate as independent market participants and collaborate with photovoltaic(PV)generation units to enhance the flexible power supply capabilities of PV units.However,the dynamic variations in the profitability of ESSs in the electricity market are yet to be fully understood.This study introduces a dual-timescale dynamics model that integrates a spot market clearing(SMC)model into a system dynamics(SD)model to investigate the profit-aware capacity growth of ESSs and compares the profitability of independent energy storage systems(IESSs)with that of an ESS integrated within a PV(PV-ESS).Furthermore,this study aims to ascertain the optimal allocation of the PV-ESS.First,SD and SMC models were set up.Second,the SMC model simulated on an hourly timescale was incorporated into the SD model as a subsystem,a dual-timescale model was constructed.Finally,a development simulation and profitability analysis was conducted from 2022 to 2040 to reveal the dynamic optimal range of PV-ESS allocation.Additionally,negative electricity prices were considered during clearing processes.The simulation results revealed differences in profitability and capacity growth between IESS and PV-ESS,helping grid investors and policymakers to determine the boundaries of ESSs and dynamic optimal allocation of PV-ESSs.
文摘Spark is a distributed data processing framework based on memory.Memory allocation is a focus question of Spark research.A good memory allocation scheme can effectively improve the efficiency of task execution and memory resource utilization of the Spark.Aiming at the memory allocation problem in the Spark2.x version,this paper optimizes the memory allocation strategy by analyzing the Spark memory model,the existing cache replacement algorithms and the memory allocation methods,which is on the basis of minimizing the storage area and allocating the execution area according to the demand.It mainly including two parts:cache replacement optimization and memory allocation optimization.Firstly,in the storage area,the cache replacement algorithm is optimized according to the characteristics of RDD Partition,which is combined with PCA dimension.In this section,the four features of RDD Partition are selected.When the RDD cache is replaced,only two most important features are selected by PCA dimension reduction method each time,thereby ensuring the generalization of the cache replacement strategy.Secondly,the memory allocation strategy of the execution area is optimized according to the memory requirement of Task and the memory space of storage area.In this paper,a series of experiments in Spark on Yarn mode are carried out to verify the effectiveness of the optimization algorithm and improve the cluster performance.
基金funded by the Six Talent Peaks Project in Jiangsu Province(No.KTHY-052)the National Natural Science Foundation of China(No.61971245)+1 种基金the Science and Technology program of Nantong(Contract No.JC2018048)the Key Lab of Advanced Optical Manufacturing Technologies of Jiangsu Province&Key Lab of Modern Optical Technologies of Education Ministry of China,Soochow University(No.KJS1858).
文摘To achieve the better system performance for cooperative communication in non-orthogonal cognitive radio vehicular adhoc networks(CR-VANETs),this paper investigates the power allocation considering the interference to the main system in a controllable range.We propose a three-slot one-way vehicle system model where the mobile vehicle nodes complete information interaction with the assistance of other independent nodes by borrowing the unused radio spectrum with the primary networks.The end-to-end SNR relationship in overlay and underlay cognitive communication system mode are analyzed by using two forwarding protocol,namely,decode-and-forward(DF)protocol and amplify-and-forward(AF)protocol,respectively.The system outage probability is derived and the optimal power allocation factor is obtained via seeking the minimum value of the approximation of system outage probability.The analytical results have been confirmed by means of Monte Carlo simulations.Simulation results show that the proposed system performance in terms of outage under the optimal power allocation is superior to that under the average power allocation,and is also better than that under other power allocation systems.
基金Project was supported by the special projects for the central government to guide the development of local science and technology(ZY20B11).
文摘In order to optimize resource integration and optimal scheduling problems in the cloud manufacturing environment,this paper proposes to use load balancing,service cost and service quality as optimization goals for resource scheduling,however,resource providers have resource utilization requirements for cloud manufacturing platforms.In the process of resource optimization scheduling,the interests of all parties have conflicts of interest,which makes it impossible to obtain better optimization results for resource scheduling.Therefore,amultithreaded auto-negotiation method based on the Stackelberg game is proposed to resolve conflicts of interest in the process of resource scheduling.The cloud manufacturing platform first calculates the expected value reduction plan for each round of global optimization,using the negotiation algorithm based on the Stackelberg game,the cloud manufacturing platformnegotiates andmediateswith the participants’agents,to maximize self-interest by constantly changing one’s own plan,iteratively find multiple sets of locally optimized negotiation plans and return to the cloud manufacturing platform.Through multiple rounds of negotiation and calculation,we finally get a target expected value reduction plan that takes into account the benefits of the resource provider and the overall benefits of the completion of the manufacturing task.Finally,through experimental simulation and comparative analysis,the validity and rationality of the model are verified.
基金supported by National Key R&D Program of China(2018YFB0904600)the grant supported by 111 project.
文摘Economical and reliable protection of DC-side shortcircuit faults has become a key technology for promoting the development of module multilevel converters based on the high voltage direct current grid(MMC-HVDC-Grid).The fault current limiter(FCL)can effectively suppress the rapid development of the fault current and reduce the current breaking capacity of the circuit breaker.In this paper,a method based on transient energy flow(TEF)analysis is proposed to optimize the allocation of a resistive and inductive FCL in the MMC-HVDC-Grid.In the proposed method,the electromagnetic TEF is measured first,and then,the TEF suppression rate and suppression efficiency are defined as optimization objectives,and the installation location of the FCL and its impedance parameters as optimization variables.To test the proposed method,two-terminal and four-terminal bipolar MMC-HVDC-Grids with single-pole-to-ground DC faults are modeled in the PSCAD/EMTDC so that the TEF data can be acquired.The optimal FCLs’location and parameter values are determined through investigating the evolution paradigm of TEF along with changes of the FCL position and parameters.The results prove that the selected parameters can effectively slow down the DC fault current rising rate,thus reducing the requirements on tripping current of the DC breakers.
文摘The service quality of a workstation depends mainly on its service load, ifnot taking into account all kinds of devices' break-downs. In this article, an optimization modelwith inequality constraints is proposed, which aims to minimize the service load. A noveltransformation of optimization variables is also devised and the constraints are properly combinedso as to make this model into a convex one, whose corresponding Lagrange function and the KKTconditions are established afterwards. The interior-point method for convex optimization ispresented here as an efficient computation tool. Finally, this model is evaluated by a real example,from which conclusions are reached that the interior-point method possesses advantages such asfaster convergeoce and fewer iterations and it is possible to make complicated nonlinearoptimization problems exhibit convexity so as to obtain the optimum.
基金supported by Major National Science & Technology Specific Project under Grant No. 2009ZX03003-003-01
文摘This paper proposes a modified decodeand-forward(DAF) protocol with a three-node model,which contains two users and one destination.Each user can be either the source or the relay in different frames.We analyze the four cooperative cases in the first frame and run simulations to obtain the optimal power allocation coefficients in the second frame.The closed-form expression of outage probability is derived over Nakagami-m fading channels.Furthermore,we show that the proposed model has better performance than the non-cooperation system and traditional DAF strategy based on the derived outage probability.