期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Optimization of High Pressure Feedwater Heater
1
作者 Mao ShenyunShanghai Power Station Auxiliary Equipment Works 《Electricity》 1996年第1期30-33,共4页
At the beginning of 1980’s, the power equipment manufacturing industry in China introduced patent technology on designing and manufacturing the turbine, generator, boiler and their auxiliaries from USA owing to the p... At the beginning of 1980’s, the power equipment manufacturing industry in China introduced patent technology on designing and manufacturing the turbine, generator, boiler and their auxiliaries from USA owing to the policy of opening and reformation. In the meantime, our works also imported the patent technology on designing 展开更多
关键词 high FIGURE THAN Optimization of high pressure Feedwater Heater HEAT
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部