To enhance the applicability and measurement accuracy of phase-based optical flow method using complex steerable pyramids in structural displacement measurement engineering applications, an improved method of optimizi...To enhance the applicability and measurement accuracy of phase-based optical flow method using complex steerable pyramids in structural displacement measurement engineering applications, an improved method of optimizing parameter settings is proposed. The optimized parameters include the best measurement points of the Region of Interest (ROI) and the levels of pyramid filters. Additionally, to address the issue of updating reference frames in practical applications due to the difficulty in estimating the maximum effective measurement value, a mechanism for dynamically updating reference frames is introduced. Experimental results demonstrate that compared to representative image gradient-based displacement measurement methods, the proposed method exhibits higher measurement accuracy in engineering applications. This provides reliable data support for structural damage identification research based on vibration signals and is expected to broaden the engineering application prospects for structural health monitoring.展开更多
A new mothod was presented to find the optimal location and parameter setting of Thyristor Controlled Series Compensator (TCSC) to maxmize the transfer capability.Firstly the sensitivity of the transfer capability wit...A new mothod was presented to find the optimal location and parameter setting of Thyristor Controlled Series Compensator (TCSC) to maxmize the transfer capability.Firstly the sensitivity of the transfer capability with respect was described to the line's reactance was described to find the more sensitive lines for installing TCSC,however,the line which has the most sesitivity value is always not the best line for installing TCSC.For solving this problem,the more sensitive m lines were selected as the alternative line group of installing TCSC,and then modified particle swarm optimization (MPSO) was used to find out the optimal location and the optimal parameter settings of TCSC.Particle swarm optimization (PSO) algorithm can results premature convergence.For solving this problem,population entropy and cellular automata were introduced to it.Simulation results of IEEE 30-bus system proved the effectiveness of the method and its application values.展开更多
文摘To enhance the applicability and measurement accuracy of phase-based optical flow method using complex steerable pyramids in structural displacement measurement engineering applications, an improved method of optimizing parameter settings is proposed. The optimized parameters include the best measurement points of the Region of Interest (ROI) and the levels of pyramid filters. Additionally, to address the issue of updating reference frames in practical applications due to the difficulty in estimating the maximum effective measurement value, a mechanism for dynamically updating reference frames is introduced. Experimental results demonstrate that compared to representative image gradient-based displacement measurement methods, the proposed method exhibits higher measurement accuracy in engineering applications. This provides reliable data support for structural damage identification research based on vibration signals and is expected to broaden the engineering application prospects for structural health monitoring.
基金Sponsored by the Specialized Research Fund for the Doctoral Program of Higher Education(Grant No. 20050213006)
文摘A new mothod was presented to find the optimal location and parameter setting of Thyristor Controlled Series Compensator (TCSC) to maxmize the transfer capability.Firstly the sensitivity of the transfer capability with respect was described to the line's reactance was described to find the more sensitive lines for installing TCSC,however,the line which has the most sesitivity value is always not the best line for installing TCSC.For solving this problem,the more sensitive m lines were selected as the alternative line group of installing TCSC,and then modified particle swarm optimization (MPSO) was used to find out the optimal location and the optimal parameter settings of TCSC.Particle swarm optimization (PSO) algorithm can results premature convergence.For solving this problem,population entropy and cellular automata were introduced to it.Simulation results of IEEE 30-bus system proved the effectiveness of the method and its application values.