In this paper,based on the generalized heat transfer law,an air conditioning system is analyzed with the entropy generation minimization and the entransy theory.Taking the coefficient of performance(denoted as COP) ...In this paper,based on the generalized heat transfer law,an air conditioning system is analyzed with the entropy generation minimization and the entransy theory.Taking the coefficient of performance(denoted as COP) and heat flow rate Qout which is released into the room as the optimization objectives,we discuss the applicabilities of the entropy generation minimization and entransy theory to the optimizations.Five numerical cases are presented.Combining the numerical results and theoretical analyses,we can conclude that the optimization applicabilities of the two theories are conditional.If Qout is the optimization objective,larger entransy increase rate always leads to larger Qout,while smaller entropy generation rate does not.If we take COP as the optimization objective,neither the entropy generation minimization nor the concept of entransy increase is always applicable.Furthermore,we find that the concept of entransy dissipation is not applicable for the discussed cases.展开更多
An optimal drainage tunnel location determination method for landslide prevention was proposed to solve the existing problems in drainage tunnel construction. Current applications of drainage tunnel systems in China w...An optimal drainage tunnel location determination method for landslide prevention was proposed to solve the existing problems in drainage tunnel construction. Current applications of drainage tunnel systems in China were reviewed and the fimctions of drainage tunnel were categorized as catchment and interception. Numerical simulations were conducted. The results show that both catchment and interception tunnels have variation of the function in the simulation of monolayer model, which shows the reduction of permeability condition in lower layer. The function of catchment can be observed in the deep slope, while the function of interception is observed near groundwater source. By using the slope safety factor and discharge water amount as the objectives of optimal drainage tunnel location, and pore-water pressure in fixed node and section flux as the judgment for construction quality of adjacent drainage tunnel, the design principle of drainage tunnel was introduced. The K103 Landslide was illustrated as an example to determine the optimal drainage tunnel location. The measured drainage tunnel efficiency was evaluated and compared with that from the numerical analyses based on groundwater data. The results validate the present numerical study.展开更多
基金Project supported by the Youth Programs of Chongqing Three Gorges University,China(Grant No.13QN18)
文摘In this paper,based on the generalized heat transfer law,an air conditioning system is analyzed with the entropy generation minimization and the entransy theory.Taking the coefficient of performance(denoted as COP) and heat flow rate Qout which is released into the room as the optimization objectives,we discuss the applicabilities of the entropy generation minimization and entransy theory to the optimizations.Five numerical cases are presented.Combining the numerical results and theoretical analyses,we can conclude that the optimization applicabilities of the two theories are conditional.If Qout is the optimization objective,larger entransy increase rate always leads to larger Qout,while smaller entropy generation rate does not.If we take COP as the optimization objective,neither the entropy generation minimization nor the concept of entransy increase is always applicable.Furthermore,we find that the concept of entransy dissipation is not applicable for the discussed cases.
基金Foundation item: Project(1220BAK10B06) supported by the National "Twelfth Five-Year" Plan for Science & Technology Support Program of China Project(20100101110026) supported by the PhD Programs Foundation of Ministry of Education of China Project(2009RS0050) supported by the Key Innovation Team Support Fund of Zhejiang Province, China
文摘An optimal drainage tunnel location determination method for landslide prevention was proposed to solve the existing problems in drainage tunnel construction. Current applications of drainage tunnel systems in China were reviewed and the fimctions of drainage tunnel were categorized as catchment and interception. Numerical simulations were conducted. The results show that both catchment and interception tunnels have variation of the function in the simulation of monolayer model, which shows the reduction of permeability condition in lower layer. The function of catchment can be observed in the deep slope, while the function of interception is observed near groundwater source. By using the slope safety factor and discharge water amount as the objectives of optimal drainage tunnel location, and pore-water pressure in fixed node and section flux as the judgment for construction quality of adjacent drainage tunnel, the design principle of drainage tunnel was introduced. The K103 Landslide was illustrated as an example to determine the optimal drainage tunnel location. The measured drainage tunnel efficiency was evaluated and compared with that from the numerical analyses based on groundwater data. The results validate the present numerical study.