期刊文献+
共找到50篇文章
< 1 2 3 >
每页显示 20 50 100
Joint optimization scheduling for water conservancy projects incomplex river networks 被引量:5
1
作者 Qin Liu Guo-hua Fang +1 位作者 Hong-bin Sun Xue-wen Wu 《Water Science and Engineering》 EI CAS CSCD 2017年第1期43-52,共10页
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi... In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks. 展开更多
关键词 Complex river network Water conservancy project Hydraulic structure Flow capacity simulation scheduling model Optimal scheduling
下载PDF
Load Optimization Scheduling of Chip Mounter Based on Hybrid Adaptive Optimization 被引量:2
2
作者 Xuesong Yan Hao Zuo +2 位作者 Chengyu Hu Wenyin Gong Victor S.Sheng 《Complex System Modeling and Simulation》 2023年第1期1-11,共11页
A chip mounter is the core equipment in the production line of the surface-mount technology,which is responsible for finishing the mount operation.It is the most complex and time-consuming stage in the production proc... A chip mounter is the core equipment in the production line of the surface-mount technology,which is responsible for finishing the mount operation.It is the most complex and time-consuming stage in the production process.Therefore,it is of great significance to optimize the load balance and mounting efficiency of the chip mounter and improve the mounting efficiency of the production line.In this study,according to the specific type of chip mounter in the actual production line of a company,a maximum and minimum model is established to minimize the maximum cycle time of the chip mounter in the production line.The production efficiency of the production line can be improved by optimizing the workload scheduling of each chip mounter.On this basis,a hybrid adaptive optimization algorithm is proposed to solve the load scheduling problem of the mounter.The hybrid algorithm is a hybrid of an adaptive genetic algorithm and the improved ant colony algorithm.It combines the advantages of the two algorithms and improves their global search ability and convergence speed.The experimental results show that the proposed hybrid optimization algorithm has a good optimization effect and convergence in the load scheduling problem of chip mounters. 展开更多
关键词 Surface Mount Technology(SMT) chip mounter load optimization scheduling adaptive genetic algorithm ant colony algorithm
原文传递
Research on Flexible Job Shop Scheduling Optimization Based on Segmented AGV 被引量:2
3
作者 Qinhui Liu Nengjian Wang +3 位作者 Jiang Li Tongtong Ma Fapeng Li Zhijie Gao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第3期2073-2091,共19页
As a typical transportation tool in the intelligent manufacturing system,Automatic Guided Vehicle(AGV)plays an indispensable role in the automatic production process of the workshop.Therefore,integrating AGV resources... As a typical transportation tool in the intelligent manufacturing system,Automatic Guided Vehicle(AGV)plays an indispensable role in the automatic production process of the workshop.Therefore,integrating AGV resources into production scheduling has become a research hotspot.For the scheduling problem of the flexible job shop adopting segmented AGV,a dual-resource scheduling optimization mathematical model of machine tools and AGVs is established by minimizing the maximum completion time as the objective function,and an improved genetic algorithmis designed to solve the problem in this study.The algorithmdesigns a two-layer codingmethod based on process coding and machine tool coding and embeds the task allocation of AGV into the decoding process to realize the real dual resource integrated scheduling.When initializing the population,three strategies are designed to ensure the diversity of the population.In order to improve the local search ability and the quality of the solution of the genetic algorithm,three neighborhood structures are designed for variable neighborhood search.The superiority of the improved genetic algorithmand the influence of the location and number of transfer stations on scheduling results are verified in two cases. 展开更多
关键词 Segmented AGV flexible job shop improved genetic algorithm scheduling optimization
下载PDF
Layered power scheduling optimization of PV hydrogen production system considering performance attenuation of PEMEL
4
作者 Yanhui Xu Haowei Chen 《Global Energy Interconnection》 EI CSCD 2023年第6期714-725,共12页
To analyze the additional cost caused by the performance attenuation of a proton exchange membrane electrolyzer(PEMEL)under the fluctuating input of renewable energy,this study proposes an optimization method for powe... To analyze the additional cost caused by the performance attenuation of a proton exchange membrane electrolyzer(PEMEL)under the fluctuating input of renewable energy,this study proposes an optimization method for power scheduling in hydrogen production systems under the scenario of photovoltaic(PV)electrolysis of water.First,voltage and performance attenuation models of the PEMEL are proposed,and the degradation cost of the electrolyzer under a fluctuating input is considered.Then,the calculation of the investment and operating costs of the hydrogen production system for a typical day is based on the life cycle cost.Finally,a layered power scheduling optimization method is proposed to reasonably distribute the power of the electrolyzer and energy storage system in a hydrogen production system.In the up-layer optimization,the PV power absorbed by the hydrogen production system was optimized using MALTAB+Gurobi.In low-layer optimization,the power allocation between the PEMEL and battery energy storage system(BESS)is optimized using a non-dominated sorting genetic algorithm(NSGA-Ⅱ)combined with the firefly algorithm(FA).A better optimization result,characterized by lower degradation and total costs,was obtained using the method proposed in this study.The improved algorithm can search for a better population and obtain optimization results in fewer iterations.As a calculation example,data from a PV power station in northwest China were used for optimization,and the effectiveness and rationality of the proposed optimization method were verified. 展开更多
关键词 PV electrolysis of water Proton exchange membrane electrolyzer Performance attenuation Degradation cost Power scheduling optimization
下载PDF
Urban Drainage Network Scheduling Strategy Based on Dynamic Regulation: Optimization Model and Theoretical Research
5
作者 Xiaoming Fei 《Intelligent Automation & Soft Computing》 SCIE 2023年第8期1293-1309,共17页
With the acceleration of urbanization in China,the discharge of domestic sewage and industrial wastewater is increasing,and accidents of sewage spilling out and polluting the environment occur from time to time.Proble... With the acceleration of urbanization in China,the discharge of domestic sewage and industrial wastewater is increasing,and accidents of sewage spilling out and polluting the environment occur from time to time.Problems such as imperfect facilities and backward control methods are com-mon in the urban drainage network systems in China.Efficient drainage not only strengthens infrastructure such as rain and sewage diversion,pollution source monitoring,transportation,drainage and storage but also urgently needs technical means to monitor and optimize production and operation.Aiming at the optimal control of single-stage pumping stations and the coordinated control between two-stage pumping stations,this paper studies the modelling and optimal control of drainage network systems.Based on the Long Short Term Memory(LSTM)water level prediction model of the sewage pumping stations,and then based on the mechanism analysis of drainage pipe network,the factors that may cause the water level change of pumping station are obtained.Grey correlation analysis is carried out on these influencing factors,and the prediction model is established by taking the factors with a high correlation degree as input.The research results show that compared with the traditional prediction model,the LSTM model not only has higher prediction accuracy but also has better inflection point tracking ability. 展开更多
关键词 LSTM neural network urban drainage network drainage system scheduling strategy optimization
下载PDF
Multi-Time Scale Optimal Scheduling of a Photovoltaic Energy Storage Building System Based on Model Predictive Control
6
作者 Ximin Cao Xinglong Chen +2 位作者 He Huang Yanchi Zhang Qifan Huang 《Energy Engineering》 EI 2024年第4期1067-1089,共23页
Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a ... Building emission reduction is an important way to achieve China’s carbon peaking and carbon neutrality goals.Aiming at the problem of low carbon economic operation of a photovoltaic energy storage building system,a multi-time scale optimal scheduling strategy based on model predictive control(MPC)is proposed under the consideration of load optimization.First,load optimization is achieved by controlling the charging time of electric vehicles as well as adjusting the air conditioning operation temperature,and the photovoltaic energy storage building system model is constructed to propose a day-ahead scheduling strategy with the lowest daily operation cost.Second,considering inter-day to intra-day source-load prediction error,an intraday rolling optimal scheduling strategy based on MPC is proposed that dynamically corrects the day-ahead dispatch results to stabilize system power fluctuations and promote photovoltaic consumption.Finally,taking an office building on a summer work day as an example,the effectiveness of the proposed scheduling strategy is verified.The results of the example show that the strategy reduces the total operating cost of the photovoltaic energy storage building system by 17.11%,improves the carbon emission reduction by 7.99%,and the photovoltaic consumption rate reaches 98.57%,improving the system’s low-carbon and economic performance. 展开更多
关键词 Load optimization model predictive control multi-time scale optimal scheduling photovoltaic consumption photovoltaic energy storage building
下载PDF
Two-Stage Optimal Scheduling of Community Integrated Energy System
7
作者 Ming Li Rifucairen Fu +4 位作者 Tuerhong Yaxiaer Yunping Zheng Abiao Huang Ronghui Liu Shunfu Lin 《Energy Engineering》 EI 2024年第2期405-424,共20页
From the perspective of a community energy operator,a two-stage optimal scheduling model of a community integrated energy system is proposed by integrating information on controllable loads.The day-ahead scheduling an... From the perspective of a community energy operator,a two-stage optimal scheduling model of a community integrated energy system is proposed by integrating information on controllable loads.The day-ahead scheduling analyzes whether various controllable loads participate in the optimization and investigates the impact of their responses on the operating economy of the community integrated energy system(IES)before and after;the intra-day scheduling proposes a two-stage rolling optimization model based on the day-ahead scheduling scheme,taking into account the fluctuation of wind turbine output and load within a short period of time and according to the different response rates of heat and cooling power,and solves the adjusted output of each controllable device.The simulation results show that the optimal scheduling of controllable loads effectively reduces the comprehensive operating costs of community IES;the two-stage optimal scheduling model can meet the energy demand of customers while effectively and timely suppressing the random fluctuations on both sides of the source and load during the intra-day stage,realizing the economic and smooth operation of IES. 展开更多
关键词 Integrated energy system two-stage optimal scheduling controllable loads rolling optimization
下载PDF
Scheduling optimization of task allocation in integrated manufacturing system based on task decomposition 被引量:10
8
作者 Aijun Liu Michele Pfund John Fowler 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第2期422-433,共12页
How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we ca... How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we can probe a new way to solve this problem. Firstly, a new method for task granularity quantitative analysis is put forward, which can precisely evaluate the task granularity of complex product cooperation workflow in the integrated manufacturing system, on the above basis; this method is used to guide the coarse-grained task decomposition and recombine the subtasks with low cohesion coefficient. Then, a multi-objective optimieation model and an algorithm are set up for the scheduling optimization of task scheduling. Finally, the application feasibility of the model and algorithm is ultimately validated through an application case study. 展开更多
关键词 integrated manufacturing system optimization task decomposition task scheduling
下载PDF
An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches 被引量:2
9
作者 WU Xiuli PENG Junjian +2 位作者 XIE Zirun ZHAO Ning WU Shaomin 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2021年第2期272-285,共14页
In order to solve the flexible job shop scheduling problem with variable batches,we propose an improved multiobjective optimization algorithm,which combines the idea of inverse scheduling.First,a flexible job shop pro... In order to solve the flexible job shop scheduling problem with variable batches,we propose an improved multiobjective optimization algorithm,which combines the idea of inverse scheduling.First,a flexible job shop problem with the variable batches scheduling model is formulated.Second,we propose a batch optimization algorithm with inverse scheduling in which the batch size is adjusted by the dynamic feedback batch adjusting method.Moreover,in order to increase the diversity of the population,two methods are developed.One is the threshold to control the neighborhood updating,and the other is the dynamic clustering algorithm to update the population.Finally,a group of experiments are carried out.The results show that the improved multi-objective optimization algorithm can ensure the diversity of Pareto solutions effectively,and has effective performance in solving the flexible job shop scheduling problem with variable batches. 展开更多
关键词 flexible job shop variable batch inverse scheduling multi-objective evolutionary algorithm based on decomposition a batch optimization algorithm with inverse scheduling
下载PDF
Location Selection and Scheduling Optimization of Material Storage in Manufacturing Workshop
10
作者 ZENG Guoqiang LIU Li +1 位作者 SHENG Lei BAI Nan 《International Journal of Plant Engineering and Management》 2019年第4期206-218,共13页
Based on improved immune algorithm, the location of material storage in manufacturing workshop is studied. Intelligent optimization algorithms include particle swarm optimization algorithm, genetic selection algorithm... Based on improved immune algorithm, the location of material storage in manufacturing workshop is studied. Intelligent optimization algorithms include particle swarm optimization algorithm, genetic selection algorithm, simulated annealing algorithm, tabu search algorithm and so on. According to the non-linear constraints, the objective function is established to solve the minimum energy consumption of material distribution. The improved immune algorithm can solve the complex problem of manufacturing workshop, and the material storage location and scheduling scheme can be obtained by combining simulation software. Scheduling optimization involves material warehousing, sorting, loading and unloading, handling and so on. Using the one-to-one accurate distribution principle and MATLAB software to simulate and analyze, the location of material warehousing in manufacturing workshop is determined, and the material distribution and scheduling are studied. 展开更多
关键词 immune algorithm manufacturing workshop material storage location MATLAB scheduling optimization
下载PDF
Optimal integration of solar home systems and appliance scheduling for residential homes under severe national load shedding
11
作者 Sakhile Twala Xianming Ye +1 位作者 Xiaohua Xia Lijun Zhang 《Journal of Automation and Intelligence》 2023年第4期227-238,共12页
In developing countries like South Africa,users experienced more than 1030 hours of load shedding outages in just the first half of 2023 due to inadequate power supply from the national grid.Residential homes that can... In developing countries like South Africa,users experienced more than 1030 hours of load shedding outages in just the first half of 2023 due to inadequate power supply from the national grid.Residential homes that cannot afford to take actions to mitigate the challenges of load shedding are severely inconvenienced as they have to reschedule their demand involuntarily.This study presents optimal strategies to guide households in determining suitable scheduling and sizing solutions for solar home systems to mitigate the inconvenience experienced by residents due to load shedding.To start with,we predict the load shedding stages that are used as input for the optimal strategies by using the K-Nearest Neighbour(KNN)algorithm.Based on an accurate forecast of the future load shedding patterns,we formulate the residents’inconvenience and the loss of power supply probability during load shedding as the objective function.When solving the multi-objective optimisation problem,four different strategies to fight against load shedding are identified,namely(1)optimal home appliance scheduling(HAS)under load shedding;(2)optimal HAS supported by solar panels;(3)optimal HAS supported by batteries,and(4)optimal HAS supported by the solar home system with both solar panels and batteries.Among these strategies,appliance scheduling with an optimally sized 9.6 kWh battery and a 2.74 kWp panel array of five 550 Wp panels,eliminates the loss of power supply probability and reduces the inconvenience by 92%when tested under the South African load shedding cases in 2023. 展开更多
关键词 Load shedding Inconvenience Optimal scheduling and sizing strategies K-Nearest Neighbour(KNN) Multi-objective mixed integer nonlinear optimisation
下载PDF
Microgrid Optimal Scheduling
12
作者 Salem Al-Agtash Mohamad Al Hashem 《Smart Grid and Renewable Energy》 CAS 2023年第2期15-29,共15页
This paper presents the optimal scheduling of renewable resources using interior point optimization for grid-connected and islanded microgrids (MG) that operate with no energy storage systems. The German Jordanian Uni... This paper presents the optimal scheduling of renewable resources using interior point optimization for grid-connected and islanded microgrids (MG) that operate with no energy storage systems. The German Jordanian University (GJU) microgrid system is used for illustration. We present analyses for islanded and grid-connected MG with no storage. The results show a feasible islanded MG with a substantial operational cost reduction. We obtain an average of $1 k daily cost savings when operating an islanded compared to a grid-connected MG with capped grid energy prices. This cost saving is 10 times higher when considering varying grid energy prices during the day. Although the PV power is intermittent during the day, the MG continues to operate with a voltage variation that does not 10%. The results imply that MGs of GJU similar topology can optimally and safely operate with no energy storage requirements but considerable renewable generation capacity. 展开更多
关键词 MICROGRID Renewable Energy Optimal scheduling Power Flow
下载PDF
Low-Carbon Dispatch of an Integrated Energy System Considering Confidence Intervals for Renewable Energy Generation
13
作者 Yan Shi Wenjie Li +2 位作者 Gongbo Fan Luxi Zhang Fengjiu Yang 《Energy Engineering》 EI 2024年第2期461-482,共22页
Addressing the insufficiency in down-regulation leeway within integrated energy systems stemming from the erratic and volatile nature of wind and solar renewable energy generation,this study focuses on formulating a c... Addressing the insufficiency in down-regulation leeway within integrated energy systems stemming from the erratic and volatile nature of wind and solar renewable energy generation,this study focuses on formulating a coordinated strategy involving the carbon capture unit of the integrated energy system and the resources on the load storage side.A scheduling model is devised that takes into account the confidence interval associated with renewable energy generation,with the overarching goal of optimizing the system for low-carbon operation.To begin with,an in-depth analysis is conducted on the temporal energy-shifting attributes and the low-carbon modulation mechanisms exhibited by the source-side carbon capture power plant within the context of integrated and adaptable operational paradigms.Drawing from this analysis,a model is devised to represent the adjustable resources on the charge-storage side,predicated on the principles of electro-thermal coupling within the energy system.Subsequently,the dissimilarities in the confidence intervals of renewable energy generation are considered,leading to the proposition of a flexible upper threshold for the confidence interval.Building on this,a low-carbon dispatch model is established for the integrated energy system,factoring in the margin allowed by the adjustable resources.In the final phase,a simulation is performed on a regional electric heating integrated energy system.This simulation seeks to assess the impact of source-load-storage coordination on the system’s low-carbon operation across various scenarios of reduction margin reserves.The findings underscore that the proactive scheduling model incorporating confidence interval considerations for reduction margin reserves effectively mitigates the uncertainties tied to renewable energy generation.Through harmonized orchestration of source,load,and storage elements,it expands the utilization scope for renewable energy,safeguards the economic efficiency of system operations under low-carbon emission conditions,and empirically validates the soundness and efficacy of the proposed approach. 展开更多
关键词 Integrated energy system carbon capture power plant confidence interval optimized scheduling
下载PDF
Scheduling of Development Projects with Uncertain Iterations
14
作者 Yan Jihong & Wu Cheng National CIMS Engineering Research Center, Tsinghua University, Beijing 100084, P R. China 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2001年第2期82-86,共5页
This paper studies the scheduling of design projects in concurrent development process with uncertain number of feedback revisions. An optimization based methodology that combines heuristic algorithm, artificial intel... This paper studies the scheduling of design projects in concurrent development process with uncertain number of feedback revisions. An optimization based methodology that combines heuristic algorithm, artificial intelligence (fuzzy, genetic algorithm) and scheduling theory is developed. In the algorithm, weighting values of some key factors are defined by genetic algorithm. In addition, fuzzy logic is used to decide the ability coefficients of different roles taken by designers. Moreover, the process of pre-release and feedback revision is realized. Simulation example is a fraction of practical development project, and satisfied results are obtained. 展开更多
关键词 Concurrent engineering Product development process optimization scheduling.
下载PDF
An optimal scheduling algorithm based on task duplication 被引量:2
15
作者 RuanYoulin LiuCan ZhuGuangxi LuXiaofeng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2005年第2期445-450,共6页
When the communication time is relatively shorter than the computation time for every task, the task duplication based scheduling (TDS) algorithm proposed by Darbha and Agrawal generates an optimal schedule. Park and ... When the communication time is relatively shorter than the computation time for every task, the task duplication based scheduling (TDS) algorithm proposed by Darbha and Agrawal generates an optimal schedule. Park and Choe also proposed an extended TDS algorithm whose optimality condition is less restricted than that of TDS algorithm, but the condition is very complex and is difficult to satisfy when the number of tasks is large. An efficient algorithm is proposed whose optimality condition is less restricted and simpler than both of the algorithms, and the schedule length is also shorter than both of the algorithms. The time complexity of the proposed algorithm is O(v2), where v represents the number of tasks. 展开更多
关键词 optimal scheduling algorithm task duplication optimality condition.
下载PDF
A Chance Constrained Optimal Reserve Scheduling Approach for Economic Dispatch Considering Wind Penetration 被引量:1
16
作者 Yufei Tang Chao Luo +1 位作者 Jun Yang Haibo He 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2017年第2期186-194,共9页
The volatile wind power generation brings a full spectrum of problems to power system operation and management, ranging from transient system frequency fluctuation to steady state supply and demand balancing issue. In... The volatile wind power generation brings a full spectrum of problems to power system operation and management, ranging from transient system frequency fluctuation to steady state supply and demand balancing issue. In this paper, a novel wind integrated power system day-ahead economic dispatch model, with the consideration of generation and reserve cost is modelled and investigated. The proposed problem is first formulated as a chance constrained stochastic nonlinear programming(CCSNLP), and then transformed into a deterministic nonlinear programming(NLP). To tackle this NLP problem, a three-stage framework consists of particle swarm optimization(PSO), sequential quadratic programming(SQP) and Monte Carlo simulation(MCS) is proposed. The PSO is employed to heuristically search the line power flow limits, which are used by the SQP as constraints to solve the NLP problem. Then the solution from SQP is verified on benchmark system by using MCS. Finally, the verified results are feedback to the PSO as fitness value to update the particles. Simulation study on IEEE30-bus system with wind power penetration is carried out, and the results demonstrate that the proposed dispatch model could be effectively solved by the proposed three-stage approach. 展开更多
关键词 Chance constrained day-ahead economic dispatch optimal reserve scheduling particle swarm optimization(PSO) wind power penetration
下载PDF
Multi-timescale optimization scheduling of interconnected data centers based on model predictive control
17
作者 Xiao GUO Yanbo CHE +1 位作者 Zhihao ZHENG Jiulong SUN 《Frontiers in Energy》 SCIE EI 2024年第1期28-41,共14页
With the promotion of“dual carbon”strategy,data center(DC)access to high-penetration renewable energy sources(RESs)has become a trend in the industry.However,the uncertainty of RES poses challenges to the safe and s... With the promotion of“dual carbon”strategy,data center(DC)access to high-penetration renewable energy sources(RESs)has become a trend in the industry.However,the uncertainty of RES poses challenges to the safe and stable operation of DCs and power grids.In this paper,a multi-timescale optimal scheduling model is established for interconnected data centers(IDCs)based on model predictive control(MPC),including day-ahead optimization,intraday rolling optimization,and intraday real-time correction.The day-ahead optimization stage aims at the lowest operating cost,the rolling optimization stage aims at the lowest intraday economic cost,and the real-time correction aims at the lowest power fluctuation,eliminating the impact of prediction errors through coordinated multi-timescale optimization.The simulation results show that the economic loss is reduced by 19.6%,and the power fluctuation is decreased by 15.23%. 展开更多
关键词 model predictive control interconnected data center multi-timescale optimized scheduling distributed power supply/landscape uncertainty
原文传递
A Spark Scheduling Strategy for Heterogeneous Cluster
18
作者 Xuewen Zhang Zhonghao Li +3 位作者 Gongshen Liu Jiajun Xu Tiankai Xie Jan Pan Nees 《Computers, Materials & Continua》 SCIE EI 2018年第6期405-417,共13页
As a main distributed computing system,Spark has been used to solve problems with more and more complex tasks.However,the native scheduling strategy of Spark assumes it works on a homogenized cluster,which is not so e... As a main distributed computing system,Spark has been used to solve problems with more and more complex tasks.However,the native scheduling strategy of Spark assumes it works on a homogenized cluster,which is not so effective when it comes to heterogeneous cluster.The aim of this study is looking for a more effective strategy to schedule tasks and adding it to the source code of Spark.After investigating Spark scheduling principles and mechanisms,we developed a stratifying algorithm and a node scheduling algorithm is proposed in this paper to optimize the native scheduling strategy of Spark.In this new strategy,the static level of nodes is calculated,the dynamic factors such as the length of running tasks,and CPU usage of work nodes are considered comprehensively.And through a series of comparative experiments in alienation cluster,the new strategy costs less running time and lower CPU usage rate than the original Spark strategy,which verifies that the new schedule strategy is more effective one. 展开更多
关键词 SPARK optimize scheduling stratifying algorithm performance optimization
下载PDF
Optimal Scheduling of Electrical Energy Systems Using a Fluid Dynamic Analogy
19
作者 Juanjuan Wang Yaya Wang +2 位作者 Junhui Liu Jianbo Zheng Hongfang Zhou 《Fluid Dynamics & Materials Processing》 EI 2022年第3期577-589,共13页
The electricity-gas transformation problem and related intrinsic mechanisms are considered.First,existing schemes for the optimization of electricity-gas integrated energy systems are analyzed through consideration of... The electricity-gas transformation problem and related intrinsic mechanisms are considered.First,existing schemes for the optimization of electricity-gas integrated energy systems are analyzed through consideration of the relevant literature,and an Electricity Hub(EH)for electricity-gas coupling is proposed.Then,the distribution mechanism in the circuit of the considered electricity-gas integrated system is analyzed.Afterward,a mathematical model for the natural gas pipeline is elaborated according to the power relationship,a node power flow calculation method,and security requirements.Next,the coupling relationship between them is implemented,and dedicated simulations are carried out.Through experimental data,it is found that after 79 data iterations,the optimization results of power generation and gas purchase cost in the new system converge to$54,936 in total,which is consistent with the data obtained by an existing centralized optimization scheme.However,the new proposed optimization scheme is found to be more flexible and convenient. 展开更多
关键词 Spatial coupling integrated energy natural gas system optimal scheduling
下载PDF
Cost Effective Optimal Task Scheduling Model in Hybrid Cloud Environment
20
作者 M.Manikandan R.Subramanian +1 位作者 M.S.Kavitha S.Karthik 《Computer Systems Science & Engineering》 SCIE EI 2022年第9期935-948,共14页
In today’s world, Cloud Computing (CC) enables the users to accesscomputing resources and services over cloud without any need to own the infrastructure. Cloud Computing is a concept in which a network of devices, l... In today’s world, Cloud Computing (CC) enables the users to accesscomputing resources and services over cloud without any need to own the infrastructure. Cloud Computing is a concept in which a network of devices, located inremote locations, is integrated to perform operations like data collection, processing, data profiling and data storage. In this context, resource allocation and taskscheduling are important processes which must be managed based on the requirements of a user. In order to allocate the resources effectively, hybrid cloud isemployed since it is a capable solution to process large-scale consumer applications in a pay-by-use manner. Hence, the model is to be designed as a profit-driven framework to reduce cost and make span. With this motivation, the currentresearch work develops a Cost-Effective Optimal Task Scheduling Model(CEOTS). A novel algorithm called Target-based Cost Derivation (TCD) modelis used in the proposed work for hybrid clouds. Moreover, the algorithm workson the basis of multi-intentional task completion process with optimal resourceallocation. The model was successfully simulated to validate its effectivenessbased on factors such as processing time, make span and efficient utilization ofvirtual machines. The results infer that the proposed model outperformed theexisting works and can be relied in future for real-time applications. 展开更多
关键词 Cost effectiveness hybrid cloud optimal task scheduling virtual machine resource allocation make span
下载PDF
上一页 1 2 3 下一页 到第
使用帮助 返回顶部