The effects of optimized operation principles implemented at reservoirs on the Wujiang River in southwest China between September 2009 and April 2010 under drought conditions were analyzed based on operational data co...The effects of optimized operation principles implemented at reservoirs on the Wujiang River in southwest China between September 2009 and April 2010 under drought conditions were analyzed based on operational data collected from the Guizhou Wujiang Hydropower Development Co., Ltd. A set of linear regression equations was developed to identify the key factors impacting the electric power generation at reservoirs. A 59% reduction in the inflow discharge at the Hongjiadu Reservoir led to a decrease of only 38% in the total electric power generation at the Hongjiadu, Dongfeng, Suofengying, and Wujiangdu reservoirs on the Wujiang River, indicating that optimized operation can play an important role in drought management. The water level and the amount of other water inputs at the Hongjiadu Reservoir and the outflow discharge at all of the reservoirs except the Wujiangdu Reservoir were key factors affecting the total electric power generation at reservoirs on the Wujiang River under optimized operation.展开更多
This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem...This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem in the PTST unit provides both thermal energy and electrical energy.Based on the life cycle method,the configuration optimization under eight operation strategies is studied with the economy,energy,and environment indicators.The eight operation strategies include FEL,FEL-EC,FEL-TES,FEL-TES&EC,FTL,FTL-EC,FTL-TES,and FTL-TES&EC.The feasibility of each strategy is verified by taking a residential building cluster as an example.The indicators under the optimal configuration of each strategy are compared with that of the separate production(SP)system.The results showed that the PTST-CCHP system improves the environment and energy performance by changing the ratio of thermal energy and electric energy.The environment and energy indicators of FEL-TES&EC are superior to those of FTL-TES&EC in summer,and the results are just the opposite in winter.The initial annual investment of the PTST-CCHP system is higher than that of the SP system,but its economic performance is better than that of the SP system with the increase of life-cycle.展开更多
In this paper, a hybrid improved particle swarm optimization (IPSO) algorithm is proposed for the optimization of hydroelectric power scheduling in multi-reservoir systems. The conventional particle swarm optimizati...In this paper, a hybrid improved particle swarm optimization (IPSO) algorithm is proposed for the optimization of hydroelectric power scheduling in multi-reservoir systems. The conventional particle swarm optimization (PSO) algorithm is improved in two ways: (1) The linearly decreasing inertia weight coefficient (LDIWC) is replaced by a self-adaptive exponential inertia weight coefficient (SEIWC), which could make the PSO algorithm more balanceable and more effective in both global and local searches. (2) The crossover and mutation idea inspired by the genetic algorithm (GA) is imported into the particle updating method to enhance the diversity of populations. The potential ability of IPSO in nonlinear numerical function optimization was first tested with three classical benchmark functions. Then, a long-term multi-reservoir system operation model based on IPSO was designed and a case study was carried out in the Minjiang Basin in China, where there is a power system consisting of 26 hydroelectric power plants. The scheduling results of the IPSO algorithm were found to outperform PSO and to be comparable with the results of the dynamic programming successive approximation (DPSA) algorithm.展开更多
The cascade hydropower system composed of Pangduo reservoir and Zhikong reservoir are formed on the middlereach of the main Lasahe river. For giving full play of joint compensation effect of the two reservoirs, the pa...The cascade hydropower system composed of Pangduo reservoir and Zhikong reservoir are formed on the middlereach of the main Lasahe river. For giving full play of joint compensation effect of the two reservoirs, the paper studied the joint operationscheme for Pangduo reservoir and Zhikong reservoir. Based on the respective operation scheme, a reservoir group joint operationmodel is built, the model is solved by the simulation- optimization method, and then the practical and operational scheme isachieved. The scheme could give full play of the joint regulation and storage effect of the reservoir group and improve effectivelythe utilization factor of hydropower resources.展开更多
基金supported by the National Natural Science Foundation of China (Grant No. 51109229)
文摘The effects of optimized operation principles implemented at reservoirs on the Wujiang River in southwest China between September 2009 and April 2010 under drought conditions were analyzed based on operational data collected from the Guizhou Wujiang Hydropower Development Co., Ltd. A set of linear regression equations was developed to identify the key factors impacting the electric power generation at reservoirs. A 59% reduction in the inflow discharge at the Hongjiadu Reservoir led to a decrease of only 38% in the total electric power generation at the Hongjiadu, Dongfeng, Suofengying, and Wujiangdu reservoirs on the Wujiang River, indicating that optimized operation can play an important role in drought management. The water level and the amount of other water inputs at the Hongjiadu Reservoir and the outflow discharge at all of the reservoirs except the Wujiangdu Reservoir were key factors affecting the total electric power generation at reservoirs on the Wujiang River under optimized operation.
基金supported by the National Natural Science Foundation of China(Grant No.51667013)the Research on Scheduling Control Technology of Photothermal Power Generation of The Power System with High Proportion New Energy on The Supply End(Grant No.SGGSKY00FJJS1900273).
文摘This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem in the PTST unit provides both thermal energy and electrical energy.Based on the life cycle method,the configuration optimization under eight operation strategies is studied with the economy,energy,and environment indicators.The eight operation strategies include FEL,FEL-EC,FEL-TES,FEL-TES&EC,FTL,FTL-EC,FTL-TES,and FTL-TES&EC.The feasibility of each strategy is verified by taking a residential building cluster as an example.The indicators under the optimal configuration of each strategy are compared with that of the separate production(SP)system.The results showed that the PTST-CCHP system improves the environment and energy performance by changing the ratio of thermal energy and electric energy.The environment and energy indicators of FEL-TES&EC are superior to those of FTL-TES&EC in summer,and the results are just the opposite in winter.The initial annual investment of the PTST-CCHP system is higher than that of the SP system,but its economic performance is better than that of the SP system with the increase of life-cycle.
基金supported by the National Natural Science Foundation of China (Grant No. 50679011)
文摘In this paper, a hybrid improved particle swarm optimization (IPSO) algorithm is proposed for the optimization of hydroelectric power scheduling in multi-reservoir systems. The conventional particle swarm optimization (PSO) algorithm is improved in two ways: (1) The linearly decreasing inertia weight coefficient (LDIWC) is replaced by a self-adaptive exponential inertia weight coefficient (SEIWC), which could make the PSO algorithm more balanceable and more effective in both global and local searches. (2) The crossover and mutation idea inspired by the genetic algorithm (GA) is imported into the particle updating method to enhance the diversity of populations. The potential ability of IPSO in nonlinear numerical function optimization was first tested with three classical benchmark functions. Then, a long-term multi-reservoir system operation model based on IPSO was designed and a case study was carried out in the Minjiang Basin in China, where there is a power system consisting of 26 hydroelectric power plants. The scheduling results of the IPSO algorithm were found to outperform PSO and to be comparable with the results of the dynamic programming successive approximation (DPSA) algorithm.
文摘The cascade hydropower system composed of Pangduo reservoir and Zhikong reservoir are formed on the middlereach of the main Lasahe river. For giving full play of joint compensation effect of the two reservoirs, the paper studied the joint operationscheme for Pangduo reservoir and Zhikong reservoir. Based on the respective operation scheme, a reservoir group joint operationmodel is built, the model is solved by the simulation- optimization method, and then the practical and operational scheme isachieved. The scheme could give full play of the joint regulation and storage effect of the reservoir group and improve effectivelythe utilization factor of hydropower resources.