Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods fo...Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods for the choice of mining area optimum planning schemes by use of combining technic analysis with system simulation and system optimization.The main contents are as follows: the prediction of technic and economic indexes in the developing process of existing mining areas and new mining area, including computer simulation analysis of maximum possibility of output growth in a working mine, the effect of technic progress on productive development, and grey predictive model of the change of technic and economic indexes; the dynamic simulation model of the mining area system, including five subsystem models; mining area output, investment, economic benefit, number of workers and staff of a mining area, mining area population, and ecologic environmental dynamic change under different schemes;the 0--1 programming, the goal programming and the analytic hierarchy process for contrast analysis optimization of mining area planning schemes.展开更多
This article deals with the case of the failure-censored constant-stress partially accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The ma...This article deals with the case of the failure-censored constant-stress partially accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The maximum likelihood (ML) method is used to estimate the parameters of the CSPALT model. The performance of ML estimators is investigated via their mean square error. Also, the average confidence interval length (IL) and the associated co- verage probability (CP) are obtained. Moreover, optimum CSPALT plans that determine the optimal proportion of the test units al- located to each stress are developed. Such optimum test plans minimize the generalized asymptotic variance (GAV) of the ML estimators of the model parameters. For illustration, Monte Carlo simulation studies are given and a real life example is provided.展开更多
文摘Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods for the choice of mining area optimum planning schemes by use of combining technic analysis with system simulation and system optimization.The main contents are as follows: the prediction of technic and economic indexes in the developing process of existing mining areas and new mining area, including computer simulation analysis of maximum possibility of output growth in a working mine, the effect of technic progress on productive development, and grey predictive model of the change of technic and economic indexes; the dynamic simulation model of the mining area system, including five subsystem models; mining area output, investment, economic benefit, number of workers and staff of a mining area, mining area population, and ecologic environmental dynamic change under different schemes;the 0--1 programming, the goal programming and the analytic hierarchy process for contrast analysis optimization of mining area planning schemes.
基金supported by the King Saud University,Deanship of Scientific Research and College of Science Research Center
文摘This article deals with the case of the failure-censored constant-stress partially accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The maximum likelihood (ML) method is used to estimate the parameters of the CSPALT model. The performance of ML estimators is investigated via their mean square error. Also, the average confidence interval length (IL) and the associated co- verage probability (CP) are obtained. Moreover, optimum CSPALT plans that determine the optimal proportion of the test units al- located to each stress are developed. Such optimum test plans minimize the generalized asymptotic variance (GAV) of the ML estimators of the model parameters. For illustration, Monte Carlo simulation studies are given and a real life example is provided.