The subsea anchor piles of offshore wind power floating platform structures are mainly subjected to uplift and horizontal loads, and this paper focuses on the case of horizontal loads. A three-dimensional numerical si...The subsea anchor piles of offshore wind power floating platform structures are mainly subjected to uplift and horizontal loads, and this paper focuses on the case of horizontal loads. A three-dimensional numerical simulation study of the horizontal pullout characteristics of wind power suction anchor piles in clay layers was carried out to reveal the horizontal movement state of the anchor piles during horizontal pile pullout, the range of pile depth at the pullout point where the horizontal movement is achieved (referred to as the horizontal movement range), the relationship between the pullout load and the ultimate load during the horizontal movement, and the optimal location of the pullout point for the horizontal movement. The results show that at certain pull-out points, the anchor pile produces an overall horizontal movement state under suitable horizontal pull-out loads. The depth of the pile pull-out point for horizontal movement is in the middle and lower part of the pile, i.e. 14.2 m to 14.5 m. The horizontal pull-out load of 24,000 kN at a depth of 14.5 m within the pile horizontal movement range of 14.2m to 14.5 m is the maximum ultimate horizontal pull-out load;the optimum pull-out point depth is 14.5 m at 0.275 L (L is the pile length). For each pull-out point of the anchor pile in horizontal movement, the horizontal pull-out load in horizontal movement and the horizontal ultimate pull-out load existed and it was found that the two values were not exactly the same, the values were compared and it was found that at the optimum pull-out point the value of the ultimate horizontal pull-out load/horizontal pull-out load in horizontal movement tended to 1.展开更多
This paper presents a sequential optimum algorithm for vehicle schedulingproblem, which includes obtaining initial theoretical solution, adjustingsolution, forming initial routes and adjustins routes. This method can ...This paper presents a sequential optimum algorithm for vehicle schedulingproblem, which includes obtaining initial theoretical solution, adjustingsolution, forming initial routes and adjustins routes. This method can beapplied to general transportation problems with multiple depots and multiplevehicle types on complex network. In comparison with manual scheduling ofChengdu Transportation Company II, the result shows that this method isreasonable, feasible and applicable.展开更多
文摘The subsea anchor piles of offshore wind power floating platform structures are mainly subjected to uplift and horizontal loads, and this paper focuses on the case of horizontal loads. A three-dimensional numerical simulation study of the horizontal pullout characteristics of wind power suction anchor piles in clay layers was carried out to reveal the horizontal movement state of the anchor piles during horizontal pile pullout, the range of pile depth at the pullout point where the horizontal movement is achieved (referred to as the horizontal movement range), the relationship between the pullout load and the ultimate load during the horizontal movement, and the optimal location of the pullout point for the horizontal movement. The results show that at certain pull-out points, the anchor pile produces an overall horizontal movement state under suitable horizontal pull-out loads. The depth of the pile pull-out point for horizontal movement is in the middle and lower part of the pile, i.e. 14.2 m to 14.5 m. The horizontal pull-out load of 24,000 kN at a depth of 14.5 m within the pile horizontal movement range of 14.2m to 14.5 m is the maximum ultimate horizontal pull-out load;the optimum pull-out point depth is 14.5 m at 0.275 L (L is the pile length). For each pull-out point of the anchor pile in horizontal movement, the horizontal pull-out load in horizontal movement and the horizontal ultimate pull-out load existed and it was found that the two values were not exactly the same, the values were compared and it was found that at the optimum pull-out point the value of the ultimate horizontal pull-out load/horizontal pull-out load in horizontal movement tended to 1.
文摘This paper presents a sequential optimum algorithm for vehicle schedulingproblem, which includes obtaining initial theoretical solution, adjustingsolution, forming initial routes and adjustins routes. This method can beapplied to general transportation problems with multiple depots and multiplevehicle types on complex network. In comparison with manual scheduling ofChengdu Transportation Company II, the result shows that this method isreasonable, feasible and applicable.