Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniquen...Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies.展开更多
The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most cr...The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.展开更多
In this paper three classes of high order symplectic partitioned Runge-Kutta (PRK) methods, which are based on the W-transformation of Hairer and Wanner, and a particular class of diagonally implicit symplectic PRK me...In this paper three classes of high order symplectic partitioned Runge-Kutta (PRK) methods, which are based on the W-transformation of Hairer and Wanner, and a particular class of diagonally implicit symplectic PRK methods of arbitrarily high order, which are based on the composite algorithm, are constructed. In particular, the symplectically composite PRK methods of arbitrarily high order become explicit when applied to separable Hamiltonian systems.展开更多
In this paper, we develop a new technique called multiplicative extrapolation method which is used to construct higher order schemes for ordinary differential equations. We call it a new method because we only see add...In this paper, we develop a new technique called multiplicative extrapolation method which is used to construct higher order schemes for ordinary differential equations. We call it a new method because we only see additive extrapolation method before. This new method has a great advantage over additive extrapolation method because it keeps group property. If this method is used to construct higher order schemes from lower symplectic schemes, the higher order ones are also symplectic. First we introduce the concept of adjoint methods and some of their properties. We show that there is a self-adjoint scheme corresponding to every method. With this self-adjoint scheme of lower order, we can construct higher order schemes by multiplicative extrapolation method, which can be used to construct even much higher order schemes. Obviously this constructing process can be continued to get methods of arbitrary even order.展开更多
文摘Change orders have a significant impact on many aspects of construction projects.They are known to be the primary cause of litigation in the construction industry.Change orders are almost inevitable due to the uniqueness of each project from many perspectives,such as the type of building,complexity of the design,human factors,and the available resources.Change orders are the formal mechanism to implement design changes during the execution phase.These changes are usually the outcome of lack of visualization by the owner,misunderstanding,miscommunication between different parties involved in the project,shortage in resources,and other factors.This research aims to investigate and rank causes,effects,and control measures of change orders in the construction industry in the U.S.This research presents the results of a questionnaire surveying owners,contractors,and consultants.A total of 123 industry professionals in the Architecture,Engineering,and Construction(AEC)field,with either significant or final decision-making authority on reviewing,issuing,and approving change orders responded to the survey.Results indicated that owners are the primary source followed by consultants and contractors,respectively.Some of the more important control measures identified in this research are collaboration and visualization technologies.
文摘The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.
文摘In this paper three classes of high order symplectic partitioned Runge-Kutta (PRK) methods, which are based on the W-transformation of Hairer and Wanner, and a particular class of diagonally implicit symplectic PRK methods of arbitrarily high order, which are based on the composite algorithm, are constructed. In particular, the symplectically composite PRK methods of arbitrarily high order become explicit when applied to separable Hamiltonian systems.
文摘In this paper, we develop a new technique called multiplicative extrapolation method which is used to construct higher order schemes for ordinary differential equations. We call it a new method because we only see additive extrapolation method before. This new method has a great advantage over additive extrapolation method because it keeps group property. If this method is used to construct higher order schemes from lower symplectic schemes, the higher order ones are also symplectic. First we introduce the concept of adjoint methods and some of their properties. We show that there is a self-adjoint scheme corresponding to every method. With this self-adjoint scheme of lower order, we can construct higher order schemes by multiplicative extrapolation method, which can be used to construct even much higher order schemes. Obviously this constructing process can be continued to get methods of arbitrary even order.