In this paper, observer-based static output feedback control problem for discrete-time uncertain switched systems is investigated under an arbitrary switching rule. The main method used in this note is combining switc...In this paper, observer-based static output feedback control problem for discrete-time uncertain switched systems is investigated under an arbitrary switching rule. The main method used in this note is combining switched Lyapunov function (SLF) method with Finsler's Lemma. Based on linear matrix inequality (LMI) a less conservative stability condition is established and this condition allows extra degree of freedom for stability analysis. Finally, a simulation example is given to illustrate the efficiency of the result.展开更多
The admissibility analysis and robust admissible control problem of the uncertain discrete-time switched linear singular (SLS) systems for arbitrary switching laws are investigated. Based on linear matrix inequalities...The admissibility analysis and robust admissible control problem of the uncertain discrete-time switched linear singular (SLS) systems for arbitrary switching laws are investigated. Based on linear matrix inequalities, some sufficient conditions are given for: A) the existence of generalized common Lyapunov solution and the admissibility of the SLS systems for arbitrary switching laws, B) the existence of static output feedback control laws ensuring the admissibility of the closed-loop SLS systems for arbitrary switching laws and norm-bounded uncertainties.展开更多
The full-bridge zero-voltage and zero-current switching inverter, which can adjust the output power by keeping the duty-cycle of lagging arm constant, changing the duty-cycle of leading arm, is a common circuit topolo...The full-bridge zero-voltage and zero-current switching inverter, which can adjust the output power by keeping the duty-cycle of lagging arm constant, changing the duty-cycle of leading arm, is a common circuit topology of soft-switching inverter arc welding power supplies. However, the output power still remains a certain value when the duty-cycle of leading arm decreases to zero. The working-mode of soft-switching inverter and the waveforms of major parameters with the condition of duty-cycle of leading arm being zero are studied in this paper. U-1 characteristic experiments prove that the minimum output power of soft-switching circuit, which depends on the charged voltage of capacitors in parallel with leading arm, can be decreased by reducing the duty-cycle of lagging arm. By switching working-modes between half-bridge and full-bridge, the output power can swing from zero to the power rating.展开更多
This paper is concerned with the problems of robust admissibility and static output feedback( SOF)stabilization for a class of discrete-time switched singular systems with norm-bounded parametric uncertainties.The obj...This paper is concerned with the problems of robust admissibility and static output feedback( SOF)stabilization for a class of discrete-time switched singular systems with norm-bounded parametric uncertainties.The objective is to design a suitable robust SOF controller guaranteeing the regularity,causality and asymptotic stability of the resulting closed-loop system under arbitrary switching laws. Based on the basic matrix inequality sufficient condition for checking the admissibility of switched singular systems,together with some matrix inequality convexifying techniques,the SOF controller synthesis is developed for the underlying systems. It is shown that the controller gains can be obtained by solving a set of strict linear matrix inequalities( LMIs). A simulation example is given to show the effectiveness of the proposed method.展开更多
This paper analyses the performance of the ATM switch fabric with Combined-Input/ Output Buffering(C-IOB) under two different service principles for the cells at the head of line (HOL) positions of input buffers: Firs...This paper analyses the performance of the ATM switch fabric with Combined-Input/ Output Buffering(C-IOB) under two different service principles for the cells at the head of line (HOL) positions of input buffers: First Come First Service (FCFS)/Random Service(RS) for the set of HOL cells addressed to a given output port with different/same "age" (the waiting time at the HOL position) and Pure Random Service(PRS) for all HOL cells addressed to a given output port regardless of their "ages" while the Queue Loss (QL) transfer scheme is adopted for interaction between input and output buffers in the ATM switch fabric. The results obtained show that the C-IOB ATM switch fabric with PRS service policy and the QL transfer scheme is better than other buffering ATM switch fabrics.展开更多
The full bridge zero voltage zero current switching ( FB-ZVZCS ) , which could adjust the output power by keeping the duty ratio of lagging leg constant and changing the duty ratio of leading leg, was a common circu...The full bridge zero voltage zero current switching ( FB-ZVZCS ) , which could adjust the output power by keeping the duty ratio of lagging leg constant and changing the duty ratio of leading leg, was a common circuit of soft switching arc welding inverter power source. However, when the duty ratio of leading leg was reduced to zero, the output power stayed the constant value instead of becoming zero. The working status and waveforms of some major parameters were studied in this paper while the duty ratio of leading leg was zero. It was concluded that the minimum output power of soft switching inverter was related to the charging voltage of paraUel capacitors, and the output power also could be reduced by reducing the duty ratio of lagging leg. A novel two-stage continuous PWM control method that could switch working-mode between full bridge and half bridge was put forward in this paper. This kind of control method could further reduce the output power of soft switching inverter in order to meet the requirement of low heat input of sheet metal welding.展开更多
无小区大规模多输入多输出(Multiple-Input Multiple-Output,MIMO)与非正交多址接入(Non-Orthogonal Multiple Access,NOMA)都是未来6G的使能技术。无线携能通信(Simultaneous Wireless Information and Power Transfer,SWIPT)技术在进...无小区大规模多输入多输出(Multiple-Input Multiple-Output,MIMO)与非正交多址接入(Non-Orthogonal Multiple Access,NOMA)都是未来6G的使能技术。无线携能通信(Simultaneous Wireless Information and Power Transfer,SWIPT)技术在进行信息解码的同时收集能量,与无小区大规模MIMO-NOMA优势互补。文中基于SWIPT研究无小区大规模MIMO-NOMA系统中的能量效率问题,通过联合优化功率分配系数和SWIPT的时隙切换(Time Switching,TS)系数,提高系统的能量效率。为了最大化能量效率,采用布谷鸟算法设计功率分配系数。考虑一种特殊情况,将所有终端的TS系数设置相同,进而推导了最佳TS系数的封闭表达式。仿真结果表明,相较于几种已有方案,文中提出的优化方案可以显著提升系统的能量效率。展开更多
基金This work was supported by Doctorate Foundation of Shenyang Normal University of China (No. 054-554405-01)
文摘In this paper, observer-based static output feedback control problem for discrete-time uncertain switched systems is investigated under an arbitrary switching rule. The main method used in this note is combining switched Lyapunov function (SLF) method with Finsler's Lemma. Based on linear matrix inequality (LMI) a less conservative stability condition is established and this condition allows extra degree of freedom for stability analysis. Finally, a simulation example is given to illustrate the efficiency of the result.
基金Supported by National Natural Science Foundation of P. R. China (6022130, 60334040, 60428304)
文摘The admissibility analysis and robust admissible control problem of the uncertain discrete-time switched linear singular (SLS) systems for arbitrary switching laws are investigated. Based on linear matrix inequalities, some sufficient conditions are given for: A) the existence of generalized common Lyapunov solution and the admissibility of the SLS systems for arbitrary switching laws, B) the existence of static output feedback control laws ensuring the admissibility of the closed-loop SLS systems for arbitrary switching laws and norm-bounded uncertainties.
文摘The full-bridge zero-voltage and zero-current switching inverter, which can adjust the output power by keeping the duty-cycle of lagging arm constant, changing the duty-cycle of leading arm, is a common circuit topology of soft-switching inverter arc welding power supplies. However, the output power still remains a certain value when the duty-cycle of leading arm decreases to zero. The working-mode of soft-switching inverter and the waveforms of major parameters with the condition of duty-cycle of leading arm being zero are studied in this paper. U-1 characteristic experiments prove that the minimum output power of soft-switching circuit, which depends on the charged voltage of capacitors in parallel with leading arm, can be decreased by reducing the duty-cycle of lagging arm. By switching working-modes between half-bridge and full-bridge, the output power can swing from zero to the power rating.
基金Sponsored by the National Natural Science Foundation of China Grant No.61004038
文摘This paper is concerned with the problems of robust admissibility and static output feedback( SOF)stabilization for a class of discrete-time switched singular systems with norm-bounded parametric uncertainties.The objective is to design a suitable robust SOF controller guaranteeing the regularity,causality and asymptotic stability of the resulting closed-loop system under arbitrary switching laws. Based on the basic matrix inequality sufficient condition for checking the admissibility of switched singular systems,together with some matrix inequality convexifying techniques,the SOF controller synthesis is developed for the underlying systems. It is shown that the controller gains can be obtained by solving a set of strict linear matrix inequalities( LMIs). A simulation example is given to show the effectiveness of the proposed method.
文摘This paper analyses the performance of the ATM switch fabric with Combined-Input/ Output Buffering(C-IOB) under two different service principles for the cells at the head of line (HOL) positions of input buffers: First Come First Service (FCFS)/Random Service(RS) for the set of HOL cells addressed to a given output port with different/same "age" (the waiting time at the HOL position) and Pure Random Service(PRS) for all HOL cells addressed to a given output port regardless of their "ages" while the Queue Loss (QL) transfer scheme is adopted for interaction between input and output buffers in the ATM switch fabric. The results obtained show that the C-IOB ATM switch fabric with PRS service policy and the QL transfer scheme is better than other buffering ATM switch fabrics.
文摘The full bridge zero voltage zero current switching ( FB-ZVZCS ) , which could adjust the output power by keeping the duty ratio of lagging leg constant and changing the duty ratio of leading leg, was a common circuit of soft switching arc welding inverter power source. However, when the duty ratio of leading leg was reduced to zero, the output power stayed the constant value instead of becoming zero. The working status and waveforms of some major parameters were studied in this paper while the duty ratio of leading leg was zero. It was concluded that the minimum output power of soft switching inverter was related to the charging voltage of paraUel capacitors, and the output power also could be reduced by reducing the duty ratio of lagging leg. A novel two-stage continuous PWM control method that could switch working-mode between full bridge and half bridge was put forward in this paper. This kind of control method could further reduce the output power of soft switching inverter in order to meet the requirement of low heat input of sheet metal welding.
文摘无小区大规模多输入多输出(Multiple-Input Multiple-Output,MIMO)与非正交多址接入(Non-Orthogonal Multiple Access,NOMA)都是未来6G的使能技术。无线携能通信(Simultaneous Wireless Information and Power Transfer,SWIPT)技术在进行信息解码的同时收集能量,与无小区大规模MIMO-NOMA优势互补。文中基于SWIPT研究无小区大规模MIMO-NOMA系统中的能量效率问题,通过联合优化功率分配系数和SWIPT的时隙切换(Time Switching,TS)系数,提高系统的能量效率。为了最大化能量效率,采用布谷鸟算法设计功率分配系数。考虑一种特殊情况,将所有终端的TS系数设置相同,进而推导了最佳TS系数的封闭表达式。仿真结果表明,相较于几种已有方案,文中提出的优化方案可以显著提升系统的能量效率。