期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Trinity of Chillingworth
1
作者 WANG Ai-yan 《Sino-US English Teaching》 2007年第6期65-70,共6页
Chillingworth is a complicated character in The scarlet letter. His image is a synthesis, or trinity, of the images of God, man of science and Satan, and the novel demonstrates a degradation from God to man of science... Chillingworth is a complicated character in The scarlet letter. His image is a synthesis, or trinity, of the images of God, man of science and Satan, and the novel demonstrates a degradation from God to man of science and finally to a Satan of hatred. In this vicious transformation, his character as man of science plays a key role. Through the development of this character, Hawthorne expresses his criticism to those who lack necessary reverence for human heart and soul. 展开更多
关键词 CHILLINGWORTH DEGRADATION lack of forgivingness man of science over-reacher
下载PDF
mproved Zone 1 Top-line Tilting Scheme for Polygonal Distance Protection in the Outgoing Line of Type-4 Wind Parks
2
作者 Kaiqi Ma Hans Kristian Høidalen +1 位作者 Zhe Chen Claus Leth Bak 《CSEE Journal of Power and Energy Systems》 SCIE EI CSCD 2023年第1期172-184,共13页
The impedance element in distance protection equipment in the outgoing line of a wind park(WP)may be heavily affected by the fault response of the WP.During resistive grid faults,relay over-reach(or under-reach)may ma... The impedance element in distance protection equipment in the outgoing line of a wind park(WP)may be heavily affected by the fault response of the WP.During resistive grid faults,relay over-reach(or under-reach)may manifest,depending on the fault current regulating requirements in the specific grid code deployed in WP and the fault conditions.Aiming at potential solution,i.e.the existing zone 1(fast tripping zone,non-delayed)top-line tilting(Z-1-TLT)function in modern numerical relays,this paper first assesses its adaptability under the WP integrated background.Combining the principle of Z-1-TLT itself and fault modeling to the WP,an improved Z-1-TLT scheme is developed,which can actively compensate for the possible relay overreach or under-reach during resistive faults,utilizing relay side fault quantities only.Aiming at the needless action of the new Z-1-TLT scheme against certain faults,malfunction risk area detection and dead zone detection are introduced as auxiliary criteria to optimize protective efficiency.Simulation results prove the improved Z-1-TLT scheme can effectively improve reliability of distance protection deployed in the WP outgoing line. 展开更多
关键词 Distance protection fault current regulating requirement grid code relay over-reach(under-reach) wind park zone 1 top-line tilting
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部