期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Drillhole high-pressure packer permeability test for underground powerhouse in Pushihe pumped storage hydro-plant 被引量:1
1
作者 TIAN Zuoyin CHEN Li +1 位作者 REN Xiangyu LI Zhanjun 《Global Geology》 2010年第2期85-89,共5页
Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in ... Usually the water head of the pumped storage hydro-plant is high, generally up to 400-500 m, therefore the rock mass under the high-pressure bifurcation pipe have to bear as high as millions Pascal water pressure, in according with the requirements of high water head pumped storage hydro-plant should be 1.2 times of the water head special high-pressure packer permeability test compared with normal to test the permeability of rock and rock cleavage pressure value. The test results on the choice of design options often play a decisive role. Based on the engineering practice, the authors studied the drillhole high-pressure packer permeability test in the pumped storage hydro-plant's underground powerhouse, by the analysis of test results, this article offers a demonstration of the deformation of rock fracture witch under building in the condition of high-pressure water head, it provides a more detailed engineering geological background. 展开更多
关键词 pumped storage high-pressure packer permeability test rock mass deformation permeability rock cleavage
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部