期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Cooperative path planning for multi-AUV in time-varying ocean flows 被引量:8
1
作者 Mingyong Liu Baogui Xu Xingguang Peng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第3期612-618,共7页
For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning... For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning. There are still lack of authoritative indicator and method for the cooperating path planning. The calculation of the voyage time is a difficult problem in the time-varying ocean, for the existing methods of the cooperating path planning, the computation time will increase exponentially as the autonomous underwater vehicle(AUV) counts increase, rendering them unfeasible. A collaborative path planning method is presehted for multi-AUV under the influence of time-varying ocean currents based on the dynamic programming algorithm. Each AUV cooperates with the one who has the longest estimated time of sailing, enabling the arrays of AUV to get their common goal in the shortest time with minimum timedifference. At the same time, they could avoid the obstacles along the way to the target. Simulation results show that the proposed method has a promising applicability. 展开更多
关键词 dynamic programming time-varying cooperate path planning autonomous underwater vehicle(AUV)
下载PDF
Modeling optimal oil production paths under risk service contracts 被引量:1
2
作者 Luo Dongkun Zhao Xu 《Petroleum Science》 SCIE CAS CSCD 2013年第4期596-602,共7页
Due to the rigorous fiscal terms and huge potential risk of risk service contracts,optimizing oil production paths is one of the main challenges in designing oilfield development plans.In this paper,an oil production ... Due to the rigorous fiscal terms and huge potential risk of risk service contracts,optimizing oil production paths is one of the main challenges in designing oilfield development plans.In this paper,an oil production path optimization model is developed to maximize economic benefits within constraints of technology factors and oil contracts.This analysis describes the effects of risk service contract terms on parameters of inputs and outputs and quantifies the relationships between production and production time,revenues,investment and costs.An oil service development and production project is illustrated in which the optimal production path under its own geological conditions and contract terms is calculated.The influences of oil price,service fees per barrel and operating costs on the optimal production have been examined by sensitivity analysis.The results show that the oil price has the largest impact on the optimal production,which is negatively related to oil price and positively related to service fees per barrel and operating costs. 展开更多
关键词 Risk service contract optimal production path nonlinear programming service fees per barrel sensitivity analysis
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
3
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
ESTIMATING THE CUTTER'S MAXIMUM DIAMETER IN 5-AXIS NC FACE MILLING OF TURBINE BLADES
4
作者 Li Ming Zhu Xinxiong(Department of Manufacturing Engineering Beijing University of Aeronautics and Astronautics Beijing,100083)P.R.China 《Computer Aided Drafting,Design and Manufacturing》 1996年第2期57-64,共2页
Based on the principles of differential geometry,the basic equations are derived for generating gouging free tool path in 5-axis NC face milling,the influence of surface's local geometry is discussed,and the condi... Based on the principles of differential geometry,the basic equations are derived for generating gouging free tool path in 5-axis NC face milling,the influence of surface's local geometry is discussed,and the conditions of using cutter with reasonable diameter are presented. 展开更多
关键词 ss:gouging free cutting multi-axis machining NC programming tool path generation
全文增补中
上一页 1 下一页 到第
使用帮助 返回顶部