For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning...For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning. There are still lack of authoritative indicator and method for the cooperating path planning. The calculation of the voyage time is a difficult problem in the time-varying ocean, for the existing methods of the cooperating path planning, the computation time will increase exponentially as the autonomous underwater vehicle(AUV) counts increase, rendering them unfeasible. A collaborative path planning method is presehted for multi-AUV under the influence of time-varying ocean currents based on the dynamic programming algorithm. Each AUV cooperates with the one who has the longest estimated time of sailing, enabling the arrays of AUV to get their common goal in the shortest time with minimum timedifference. At the same time, they could avoid the obstacles along the way to the target. Simulation results show that the proposed method has a promising applicability.展开更多
Due to the rigorous fiscal terms and huge potential risk of risk service contracts,optimizing oil production paths is one of the main challenges in designing oilfield development plans.In this paper,an oil production ...Due to the rigorous fiscal terms and huge potential risk of risk service contracts,optimizing oil production paths is one of the main challenges in designing oilfield development plans.In this paper,an oil production path optimization model is developed to maximize economic benefits within constraints of technology factors and oil contracts.This analysis describes the effects of risk service contract terms on parameters of inputs and outputs and quantifies the relationships between production and production time,revenues,investment and costs.An oil service development and production project is illustrated in which the optimal production path under its own geological conditions and contract terms is calculated.The influences of oil price,service fees per barrel and operating costs on the optimal production have been examined by sensitivity analysis.The results show that the oil price has the largest impact on the optimal production,which is negatively related to oil price and positively related to service fees per barrel and operating costs.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Based on the principles of differential geometry,the basic equations are derived for generating gouging free tool path in 5-axis NC face milling,the influence of surface's local geometry is discussed,and the condi...Based on the principles of differential geometry,the basic equations are derived for generating gouging free tool path in 5-axis NC face milling,the influence of surface's local geometry is discussed,and the conditions of using cutter with reasonable diameter are presented.展开更多
基金supported by the National Natural Science Foundation of China(5110917951179156+2 种基金5137917661473233)the Natural Science Basic Research Plan in Shaanxi Province of China(2014JQ8330)
文摘For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning. There are still lack of authoritative indicator and method for the cooperating path planning. The calculation of the voyage time is a difficult problem in the time-varying ocean, for the existing methods of the cooperating path planning, the computation time will increase exponentially as the autonomous underwater vehicle(AUV) counts increase, rendering them unfeasible. A collaborative path planning method is presehted for multi-AUV under the influence of time-varying ocean currents based on the dynamic programming algorithm. Each AUV cooperates with the one who has the longest estimated time of sailing, enabling the arrays of AUV to get their common goal in the shortest time with minimum timedifference. At the same time, they could avoid the obstacles along the way to the target. Simulation results show that the proposed method has a promising applicability.
基金Funding for this work was provided by the Major Project from the National Social Science Foundation of China through research on replacement strategies for overseas oil and gas resources based on the perspective of China’s petroleum security under the project number 11&ZD164
文摘Due to the rigorous fiscal terms and huge potential risk of risk service contracts,optimizing oil production paths is one of the main challenges in designing oilfield development plans.In this paper,an oil production path optimization model is developed to maximize economic benefits within constraints of technology factors and oil contracts.This analysis describes the effects of risk service contract terms on parameters of inputs and outputs and quantifies the relationships between production and production time,revenues,investment and costs.An oil service development and production project is illustrated in which the optimal production path under its own geological conditions and contract terms is calculated.The influences of oil price,service fees per barrel and operating costs on the optimal production have been examined by sensitivity analysis.The results show that the oil price has the largest impact on the optimal production,which is negatively related to oil price and positively related to service fees per barrel and operating costs.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Based on the principles of differential geometry,the basic equations are derived for generating gouging free tool path in 5-axis NC face milling,the influence of surface's local geometry is discussed,and the conditions of using cutter with reasonable diameter are presented.