Cooperative path planning for multi-AUV in time-varying ocean flows 被引量:9
1
作者 Mingyong Liu Baogui Xu Xingguang Peng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第3期612-618,共7页
For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning... For low-speed underwater vehicles, the ocean currents has a great influence on them, and the changes in ocean currents is complex and continuous, thus whose impact must be taken into consideration in the path planning. There are still lack of authoritative indicator and method for the cooperating path planning. The calculation of the voyage time is a difficult problem in the time-varying ocean, for the existing methods of the cooperating path planning, the computation time will increase exponentially as the autonomous underwater vehicle(AUV) counts increase, rendering them unfeasible. A collaborative path planning method is presehted for multi-AUV under the influence of time-varying ocean currents based on the dynamic programming algorithm. Each AUV cooperates with the one who has the longest estimated time of sailing, enabling the arrays of AUV to get their common goal in the shortest time with minimum timedifference. At the same time, they could avoid the obstacles along the way to the target. Simulation results show that the proposed method has a promising applicability. 展开更多
关键词 dynamic programming time-varying cooperate path planning autonomous underwater vehicle(AUV)
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
2
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF