期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Single-machine scheduling with preventive periodic maintenance and resumable jobs in remanufacturing system 被引量:2
1
作者 刘碧玉 陈伟达 《Journal of Southeast University(English Edition)》 EI CAS 2012年第3期349-353,共5页
A single-machine scheduling with preventive periodic maintenance activities in a remanufacturing system including resumable and non-resumable jobs is studied.The objective is to find a schedule to minimize the makespa... A single-machine scheduling with preventive periodic maintenance activities in a remanufacturing system including resumable and non-resumable jobs is studied.The objective is to find a schedule to minimize the makespan and an LPT-LS algorithm is proposed.Non-resumable jobs are first scheduled in a machine by the longest processing time(LPT) rule,and then resumable jobs are scheduled by the list scheduling(LS) rule.And the worst-case ratios of this algorithm in three different cases in terms of the value of the total processing time of the resumable jobs(denoted as S2) are discussed.When S2 is longer than the spare time of the machine after the non-resumable jobs are assigned by the LPT rule,it is equal to 1.When S2 falls in between the spare time of the machine by the LPT rule and the optimal schedule rule,it is less than 2.When S2 is less than the spare time of the machine by the optimal schedule rule,it is less than 2.Finally,numerical examples are presented for verification. 展开更多
关键词 single-machine scheduling preventive periodic maintenance resumable jobs LPT-LS algorithm
下载PDF
Periodic Preventive Maintenance Policy with Infinite Time and Limit of Reliability Based on Health Index 被引量:4
2
作者 潘尔顺 廖雯竹 卓明良 《Journal of Shanghai Jiaotong university(Science)》 EI 2010年第2期231-235,共5页
The aging of machine can be slowed and the life of machine can be increased by implementing periodic predictive maintenance. In this article,an improvement factor considering maintenance cost,age of machine and learni... The aging of machine can be slowed and the life of machine can be increased by implementing periodic predictive maintenance. In this article,an improvement factor considering maintenance cost,age of machine and learning effect in the process of maintaining is constructed to describe the effect of periodic preventive maintenance. The model of improvement factor can be fitted through health index. Based on improvement factor with infinite time,cost function including preventive maintenance cost,minimal repair cost and replacement cost is explored. The unit cost and the optimized maintenance time interval based on limit of reliability are deduced. The process of optimization and an example are given. 展开更多
关键词 periodic preventive maintenance RELIABILITY improvement factor health index
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部