Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three diffe...Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three different types,such as changing the processing time of some operations,changing the number of total jobs and changing the number of total machines.This paper summarizes these three types of anomalies showing in the special PFSPs and gives some examples to make them better understood.The extended critical path is proposed and the reason why these anomalies happen in special PFSPs is given:anomalies will occur in these special PFSPs when the time of the operations on the reverse critical path changes.After that,the further reason for these anomalies is presented that when any one of these three types of anomalies happens,the original constraint in the special PFSPs is destroyed,which makes the anomalies appear.Finally,the application of these anomalies in production practice is given through examples and also with the possible research directions.The main contribution of this research is analyzing the intial reason why the anomalies appear in special PFSPs and pointing out the application and the possible research directions of all these three types of anomalies.展开更多
An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effecti...An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effective combination of the insertion and swap operator is applied to producing neighborhood individual at the employed bee phase. The tournament selection is adopted to avoid falling into local optima, while, the optimized insert operator embeds in onlooker bee phase for further searching the neighborhood solution to enhance the local search ability of algorithm. The tournament selection with size 2 is again applied and a better selected solution will be performed destruction and construction of iterated greedy(IG) algorithm, and then the result replaces the worse one. Simulation results show that our algorithm has a better performance compared with the HDDE and CHS which were proposed recently. It provides the better known solutions for the makespan criterion to flow shop scheduling problem with limited buffers for the Car benchmark by Carlier and Rec benchmark by Reeves. The convergence curves show that the algorithm not only has faster convergence speed but also has better convergence value.展开更多
A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a sche...A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems.展开更多
In this paper,we consider the distributed permutation flow shop scheduling problem(DPFSSP)with transportation and eligibility constrains.Three objectives are taken into account,i.e.,makespan,maximum lateness and total...In this paper,we consider the distributed permutation flow shop scheduling problem(DPFSSP)with transportation and eligibility constrains.Three objectives are taken into account,i.e.,makespan,maximum lateness and total costs(transportation costs and setup costs).To the best of our knowledge,there is no published work on multi-objective optimization of the DPFSSP with transportation and eligibility constraints.First,we present the mathematics model and constructive heuristics for single objective;then,we propose an improved The Nondominated Sorting Genetic Algorithm II(NSGA-II)for the multi-objective DPFSSP to find Pareto optimal solutions,in which a novel solution representation,a new population re-/initialization,effective crossover and mutation operators,as well as local search methods are developed.Based on extensive computational and statistical experiments,the proposed algorithm performs better than the well-known NSGA-II and the Strength Pareto Evolutionary Algorithm 2(SPEA2).展开更多
基金Supported by National Natural Science Foundation of China(Grant No.51825502).
文摘Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three different types,such as changing the processing time of some operations,changing the number of total jobs and changing the number of total machines.This paper summarizes these three types of anomalies showing in the special PFSPs and gives some examples to make them better understood.The extended critical path is proposed and the reason why these anomalies happen in special PFSPs is given:anomalies will occur in these special PFSPs when the time of the operations on the reverse critical path changes.After that,the further reason for these anomalies is presented that when any one of these three types of anomalies happens,the original constraint in the special PFSPs is destroyed,which makes the anomalies appear.Finally,the application of these anomalies in production practice is given through examples and also with the possible research directions.The main contribution of this research is analyzing the intial reason why the anomalies appear in special PFSPs and pointing out the application and the possible research directions of all these three types of anomalies.
基金Projects(61174040,61104178,61374136) supported by the National Natural Science Foundation of ChinaProject(12JC1403400) supported by Shanghai Commission of Science and Technology,ChinaProject supported by the Fundamental Research Funds for the Central Universities,China
文摘An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effective combination of the insertion and swap operator is applied to producing neighborhood individual at the employed bee phase. The tournament selection is adopted to avoid falling into local optima, while, the optimized insert operator embeds in onlooker bee phase for further searching the neighborhood solution to enhance the local search ability of algorithm. The tournament selection with size 2 is again applied and a better selected solution will be performed destruction and construction of iterated greedy(IG) algorithm, and then the result replaces the worse one. Simulation results show that our algorithm has a better performance compared with the HDDE and CHS which were proposed recently. It provides the better known solutions for the makespan criterion to flow shop scheduling problem with limited buffers for the Car benchmark by Carlier and Rec benchmark by Reeves. The convergence curves show that the algorithm not only has faster convergence speed but also has better convergence value.
基金This project is supported by National Natural Science Foundation of China (No.60274013, No.60474002)Shanghai City Development Found for Science and Technology, China(No.04DZ11008)
文摘A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems.
基金This research was partially supported by the National Natural Science Foundation of China(Nos.71390334 and 11271356).
文摘In this paper,we consider the distributed permutation flow shop scheduling problem(DPFSSP)with transportation and eligibility constrains.Three objectives are taken into account,i.e.,makespan,maximum lateness and total costs(transportation costs and setup costs).To the best of our knowledge,there is no published work on multi-objective optimization of the DPFSSP with transportation and eligibility constraints.First,we present the mathematics model and constructive heuristics for single objective;then,we propose an improved The Nondominated Sorting Genetic Algorithm II(NSGA-II)for the multi-objective DPFSSP to find Pareto optimal solutions,in which a novel solution representation,a new population re-/initialization,effective crossover and mutation operators,as well as local search methods are developed.Based on extensive computational and statistical experiments,the proposed algorithm performs better than the well-known NSGA-II and the Strength Pareto Evolutionary Algorithm 2(SPEA2).
基金国家科技公关计划项目(the Key Technologies R&D Program of China under Grant No.2001BA201A32)国家高技术研究发展计划(863) (the National High-Tech Research and Development Plan of China under Grant No.2002AA415270)