期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Effect of Ferric Chloride on the Properties of Biological Sludge in Co-precipitation Phosphorus Removal Process 被引量:6
1
作者 张志斌 李艺 +3 位作者 魏垒垒 吕育锋 王猛 高宝玉 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2013年第5期564-568,共5页
This paper studied the effect of ferric chloride on waste sludge digestion,dewatering and sedimentation under the optimized doses in co-precipitation phosphorus removal process.The experimental results showed that the... This paper studied the effect of ferric chloride on waste sludge digestion,dewatering and sedimentation under the optimized doses in co-precipitation phosphorus removal process.The experimental results showed that the concentration of mixed liquid suspended solid(MLSS) was 2436 mg.L-1 and 2385 mg.L-1 in co-precipitation phosphorus removal process(CPR) and biological phosphorous removal process(BPR),respectively.The sludge reduction ratio for each process was 22.6% and 24.6% in aerobic digestion,and 27.6% and 29.9% in anaerobic digestion,respectively.Due to the addition of chemical to the end of aeration tank,the sludge content of CPR was slightly higher than that of BPR,but the sludge reduction rate for both processes had no distinct difference.The sludge volume index(SVI) and sludge specific resistance of BPR were 126 ml.g-1 and 11.7×1012 m.kg-1,respectively,while those of CPR were only 98 ml.g-1 and 7.1×1012 m.kg-1,indicating that CPR chemical could improve sludge settling and dewatering. 展开更多
关键词 biological phosphorous removal process chemical co-precipitation phosphorus removal process ferric chloride municipal wastewater SLUDGE
下载PDF
Pretreatment of hypersaline mustard wastewater with integrated bioreactor 被引量:3
2
作者 何强 张婷婷 +3 位作者 柴宏祥 杨士伟 周健 杜国军 《Journal of Central South University》 SCIE EI CAS 2012年第6期1673-1678,共6页
A full-scale experimental study of treating mustard wastewater by the integrated bioreactor with designed scale of 1 000 m3/d is conducted combined with a demonstration project. The systematical researches on the effi... A full-scale experimental study of treating mustard wastewater by the integrated bioreactor with designed scale of 1 000 m3/d is conducted combined with a demonstration project. The systematical researches on the efficiency of combined operation conditions of anaerobic-aerobic and anaerobic-aerobic-flocculation as well as chemical phosphorus removal of hypersaline mustard wastewater are conducted. The optimal operation condition and parameters in pretreatment of mustard wastewater in winter (the water temperature ranges 8-15 ~C) are determined: the anaerobic load is 3.0 kg (COD)/(m3.d), the average COD and phosphate concentration of the inflow are respectively 3 883 mg/L and 35.53 mg/L and the dosage of flocculent (PAC) is 400 mg/L. The anaerobic-aerobic-flocculation combined operation condition and postpositive phosphorous removal with ferrous sulfate are employed. After treatment, the COD of the effluent is 470 mg/L and the average phosphate concentration is 5.09 mg/L. The effluent could achieve the third-level of Integrated Wastewater Discharge Standard (GB 8978--1996). 展开更多
关键词 mustard wastewater aerobic treatment anaerobic treatment integrated bioreactor chemical phosphorus removal
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部